Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NRC-09-0080, Fermi, Unit 1 - Information Regarding License Termination Plan + (21:53:59, 19 September 2018)
- IR 05000346/2009503 + (21:56:06, 19 September 2018)
- NG-08-0877, Ltr. 12/17/2009 Duane Arnold Re Confirmation of Initial Operator License Examinations + (22:09:42, 19 September 2018)
- NEI 99-04, Oyster Creek Nuclear Generating Station - Commitment Change Summary Report - 2008 + (22:17:13, 19 September 2018)
- M091103, SRM-M091103B - Briefing on Fire Protection Lessons Learned from Shearon Harris + (22:24:41, 19 September 2018)
- NL-09-136, Indian Point 3 Nuclear Power Plant 2009 Amendment Update to the Final Safety Analysis Report (Fsar), Revision 03 + (22:26:18, 19 September 2018)
- NL-09-1510, Vogtle Electric Generating Plant, Units 1 and 2 - Inservice Inspection Plan Third Inspection Interval Volume 1, Version 3.0 + (22:48:09, 19 September 2018)
- NL-09-1510, Vogtle Electric Generating Plant, Units 1 and 2 - Third 10-Year Interval ISI Plan + (22:48:12, 19 September 2018)
- RA-09-018, Shearon Harris, Unit 1, Request for Exemptions from Physical Security Requirements + (22:49:05, 19 September 2018)
- RA-09-017, Crystal River, Unit 3, Request for Exemptions from Physical Security Requirements + (22:49:09, 19 September 2018)
- NL-09-129, Indian Point, Unit 3, Proposed License Amendment to Change Technical Specifications Regarding Surveillance Requirements for AC and DC Sources + (22:49:42, 19 September 2018)
- NRC 2009-0121, Point Beach, Units 1 and 2, Transmittal of Information to Support License Amendment Request 241 Pbnp Vnpab and CREFS Seismic Evaluation + (22:57:08, 19 September 2018)
- NRC 2009-0121, Enclosure 1 - S&A Report No. 09Q0839-R-001, Rev. 0, Pbnp Vnpab and CREFS Seismic Verification + (23:00:30, 19 September 2018)
- M091117, M091117A - Affirmation: 1. SECY-09-0149 Detroit Edison Co. (Fermi Nuclear Power Plant, Unit 3), LBP-09-16, Ii. SECY-09-0154 in the Matter of David Geisen, Docket No. IA-05-052; Staff Application for Stay of the Effectiveness of LBP-09-24 Pe + (23:18:22, 19 September 2018)
- NEI 99-04, Nine Mile Point Nuclear Station, Units 1 & 2 - 2009 Summary of Regulatory Commitment Changes + (23:44:01, 19 September 2018)
- M091103, M091103B - Transcript Briefing on Fire Protection Lessons Learned from Shearon Harris + (23:47:58, 19 September 2018)
- L-2009-230, Comment (8) of Mchenry Cornell on Behalf of Florida Power & Light Company, on NRC-2008-0122 Enhancements to Emergency Preparedness Regulations, Proposed Rule + (23:51:39, 19 September 2018)
- NRC-09-0071, DTE Energy Waste Shipment Not Received within Twenty Days + (23:53:15, 19 September 2018)
- M091103, M091103B-Commission Briefing Slides/Exhibits, Briefing on Fire Protection Lessons Learned from Shearon Harris + (23:57:43, 19 September 2018)
- CP-200901403, Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment D, Page 90 of 99 Through Attachment E, Page 22 of 49 + (23:58:01, 19 September 2018)
- CP-200901403, Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment D, Page 57 of 99 Through Page 89 of 99 + (23:58:05, 19 September 2018)
- CP-200901403, Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment D, Page 21 of 99 Through Page 56 of 99 + (23:58:09, 19 September 2018)
- CP-200901403, Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment C Through Attachment D, Page 20 of 99 + (23:58:13, 19 September 2018)
- CP-200901403, Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Attachment a, Page 31 of 45, Through Attachment B + (23:58:17, 19 September 2018)
- CP-200901403, Comanche Peak - Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Cover Page Through Attachment a, Page 30 of 45 + (23:58:39, 19 September 2018)
- CP-200901403, Comanche Peak - Supplement to Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors + (23:58:45, 19 September 2018)
- NRC-09-0054, Fermi 2 - Response to Request for Additional Information Regarding the Proposed License Amendment to Revise the Degraded Voltage Function Requirements of Technical Requirements of TS Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modifi + (23:59:56, 19 September 2018)
- M091103, SRM-M091103A - Affirmation Session: I. SECY-09-0033 - Duke Energy Carolinas, LLC (William States Lee Iii Nuclear Station, Unit 1 and 2); TVA (Bellefonte Nuclear Plant, Units 3 and 4)--Referred Rulings on Contention Admissibility + (23:59:59, 19 September 2018)
- NL-09-1658, J. M. Farley, E.I. Hatch, Comments on Advanced Notice of Proposed Rulemaking for Performance-Based Emergency Core Cooling System Acceptance Criteria + (00:10:31, 20 September 2018)
- NRC 2009-0096, Point Beach, Unit 1 - Response to Request for Additional Information Re Fall 2008 Unit 1 (U1R31) Steam Generator Tube Inspection Report + (00:33:26, 20 September 2018)
- RS-09-133, LaSalle, Units 1 & 2 - License Amendment Regarding the Use of Neutron Absorbing Inserts in Unit 2 Spent Fuel Pool Storage Racks + (00:51:44, 20 September 2018)
- IR 05000413/2009007 + (01:06:41, 20 September 2018)
- NRC 2009-0022, 2009 Point Beach Nuclear Plant Initial Examination Proposed Exam Files + (01:22:33, 20 September 2018)
- NRC 2009-0019, 2009 Point Beach Nuclear Plant Initial Examination Outline Submittal + (01:22:39, 20 September 2018)
- NRC 2009-0082, Point Beach, Units 1 and 2 - Transmittal of Background Information to Support License Amendment Request 261, ATC Lnterim Operation and Impacts Re-Study + (02:10:06, 20 September 2018)
- L-2009-151, Turkey Point, Units 3 and 4, License Amendment Request No. 197 for H*: Alternate Repair - Criteria for Steam Generator Tubesheet Expansion Region + (02:27:58, 20 September 2018)
- NL-09-1312, Edwin I. Hatch, Units 1 and 2, Joseph M. Farley, Units 1 and 2, Vogtle Electric, Units 1, 2, 3 and 4, Response to Regulatory Issue Summary 2009-11 Preparation and Scheduling of Operator Licensing Examinations + (02:30:53, 20 September 2018)
- L-2009-191, St. Lucie, Units 1 & 2, Regulatory Issue Summary 2009-11 Preparation and Scheduling of Operator Licensing Examinations + (02:32:40, 20 September 2018)
- M090811, M090811 Commission Briefing Slides/Exhibits from Briefing on Research & Test Reactor Challenges + (02:38:56, 20 September 2018)
- NEI 07-07, Peach Bottom, Units 2 and 3 - Groundwater Protection Initiative (GPI) - Voluntary Special Report for Tritium Discovered On-Site + (02:53:34, 20 September 2018)
- NRC-09-0038, Fermi 2 - Summary Report of the 2009 Inservice Inspection Activities + (03:12:45, 20 September 2018)
- NRC-09-0043, Enrico Fermi, Unit 1 - Transmittal of License Termination Plan, Revision 1 + (03:27:26, 20 September 2018)
- NL-09-076, Indian Point, Units 2 and 3 - Application for Unit 2 Operating License Condition Change and Units 2 and 3 Technical Specification Changes to Add Inter-Unit Spent Fuel Transfer Requirements + (03:45:43, 20 September 2018)
- L-2009-135, Turkey Point, Units 3 & 4 - Response to NRC Trace Plant Model Data Request - Extended Power Uprate + (04:00:45, 20 September 2018)
- RC-09-0072, Virgil C. Summer, Unit 1, Submittal of Supplement Information to License Amendment Request LAR 04-02911 and Related Technical Specification Changes to Implement Full-Scope Alternative Source Term in Accordance with 10 CFR 50.67 + (04:30:05, 20 September 2018)
- CP-200900748, Comanche Peak - License Amendment Request 09-007, Model D5 Steam Generator Alternate Repair Criteria + (04:34:39, 20 September 2018)
- M090604, SRM-M090604B - Affirmation: I. SECY-09-0025 - Entergy Nuclear (Pilgrim & Vermont Yankee); Ii. SECY-09-0040 - Entergy Nuclear Generation Co. & Entergy Nuclear Operations Inc. (Pilgrim) + (04:47:23, 20 September 2018)
- M090604, M090604B-Affirmation: I. SECY-09-0025 Entergy Nuclear (Pilgrim and Vermont Yankee); Ii. SECY-09-0040 - Entergy Nuclear Generation Co. and Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station) + (04:47:31, 20 September 2018)
- ULNRC-05615, Callaway, Unit 1 - Operating Quality Assurance Manual (Oqam), Revision 27 + (04:53:04, 20 September 2018)
- M090514, SRM-M090514 - Briefing on the Results of the Agency Action Review Meeting, 9:00 A.M., Thursday, May 14, 2009, Commissioners' Conference Room, One White Flint North, Rockville, Maryland (Open to Public Attendance) + (05:02:04, 20 September 2018)
- BVY 09-037, Vermont Yankee - 2008 Radioactive Effluent Release Report + (05:17:42, 20 September 2018)