MONTHYEARNRC-24-0007, Report of Changes to Quality Assurance Program for Radioactive Material Packages2024-01-12012 January 2024 Report of Changes to Quality Assurance Program for Radioactive Material Packages NRC-24-0002, Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122024-01-12012 January 2024 Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0079, Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 222023-12-14014 December 2023 Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 22 NRC-23-0077, Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan2023-12-0404 December 2023 Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan NRC-23-0073, Guarantee of Payment of Deferred Premiums2023-11-29029 November 2023 Guarantee of Payment of Deferred Premiums NRC-23-0071, Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-10-13013 October 2023 Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-09-28028 September 2023 Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0064, Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-09-11011 September 2023 Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0057, Independent Spent Fuel Storage Installation Cask Registration2023-08-31031 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0054, Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 20232023-08-31031 August 2023 Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 2023 NRC-23-0056, Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval2023-08-31031 August 2023 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval NRC-23-0061, Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water..2023-08-30030 August 2023 Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water.. NRC-23-0059, Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0060, Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0053, Independent Spent Fuel Storage Installation Cask Registration2023-08-23023 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0050, Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-10010 August 2023 Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0048, Independent Spent Fuel Storage Installation Cask Registration2023-08-0101 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0049, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-07-24024 July 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0043, Independent Spent Fuel Storage Installation, Cask Registration2023-06-27027 June 2023 Independent Spent Fuel Storage Installation, Cask Registration NRC-23-0020, License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance2023-06-13013 June 2023 License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance NRC-23-0039, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-06-0606 June 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0030, Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval2023-06-0505 June 2023 Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval NRC-23-0029, Snubber Program for the Fourth 10-Year Testing Interval2023-06-0505 June 2023 Snubber Program for the Fourth 10-Year Testing Interval NRC-23-0037, 56542-EN 56542 - Fermi2023-05-26026 May 2023 56542-EN 56542 - Fermi NRC-23-0031, Response to NRC Request from Audit of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources -Operating,' Emergency Diesel Generator Voltage and Frequency Surveillance Requirements2023-05-16016 May 2023 Response to NRC Request from Audit of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources -Operating,' Emergency Diesel Generator Voltage and Frequency Surveillance Requirements NRC-23-0002, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-05-0505 May 2023 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0010, License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage2023-05-0505 May 2023 License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage NRC-23-0017, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report2023-04-28028 April 2023 Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report NRC-23-0025, Submittal of 2022 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2023-04-28028 April 2023 Submittal of 2022 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-23-0018, Annual Non-Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Non-Radiological Environmental Operating Report NRC-23-0024, Levels and Sources of Property Insurance Coverage2023-04-0303 April 2023 Levels and Sources of Property Insurance Coverage NRC-23-0021, ISFSI, Decommissioning Funding Plan Update2023-03-30030 March 2023 ISFSI, Decommissioning Funding Plan Update NRC-23-0016, Decommissioning Funding Status Report2023-03-30030 March 2023 Decommissioning Funding Status Report NRC-23-0015, Decommissioning Funding Status Report for Fermi 12023-03-30030 March 2023 Decommissioning Funding Status Report for Fermi 1 NRC-23-0011, License Renewal Commitment 7c: Transmittal of Core Plate Hold-Down Bolt Analysis2023-03-0707 March 2023 License Renewal Commitment 7c: Transmittal of Core Plate Hold-Down Bolt Analysis NRC-22-0026, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements2022-12-16016 December 2022 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements NRC-22-0051, DTE Electric Company - Guarantee of Payment of Deferred Premiums2022-11-29029 November 2022 DTE Electric Company - Guarantee of Payment of Deferred Premiums NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 NRC-22-0046, Submittal of Biennial Review of the Fermi 1 Safety Analysis Report2022-11-14014 November 2022 Submittal of Biennial Review of the Fermi 1 Safety Analysis Report NRC-22-0041, Evacuation Time Estimate Report2022-10-0505 October 2022 Evacuation Time Estimate Report NRC-22-0033, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 20222022-08-29029 August 2022 Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 2022 NRC-22-0030, Inservice Inspection Summary Report2022-08-10010 August 2022 Inservice Inspection Summary Report NRC-22-0023, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2022-08-0404 August 2022 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements NRC-22-0022, Annual Non-Radiological Environmental Operating Report2022-04-29029 April 2022 Annual Non-Radiological Environmental Operating Report NRC-22-0021, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report2022-04-29029 April 2022 Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report NRC-22-0020, Enrico Fermi Atomic Power Plant, Unit No. 1 & Fermi 2 Power Plant - 10 CFR 20.2206 Report of Individual Monitoring2022-04-28028 April 2022 Enrico Fermi Atomic Power Plant, Unit No. 1 & Fermi 2 Power Plant - 10 CFR 20.2206 Report of Individual Monitoring NRC-22-0003, Submittal of 2021 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2022-04-26026 April 2022 Submittal of 2021 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-22-0019, Submittal of the National Pollutant Discharge Elimination System Permit Application for Reissuance2022-04-0404 April 2022 Submittal of the National Pollutant Discharge Elimination System Permit Application for Reissuance NRC-22-0011, Enrico Fermi Atomic Power Plant, Unit No. 1 - Decommissioning Funding Status Report2022-03-31031 March 2022 Enrico Fermi Atomic Power Plant, Unit No. 1 - Decommissioning Funding Status Report 2024-01-12
[Table view] |
Text
Joseph H. Plona Site Vice President 6400 N. Dixie Highway, Newport, MI 48166 Tel: 734.586.5910 Fax: 734.586.4172 DTE Energy-10 CFR 50.90 10 CFR 50.82(a)(9) 10CFR50.71(e)
June 30, 2009 NRC-09-0043 U.S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, DC 20555
References:
- 1) Enrico Fermi Atomic Power Plant, Unit No. 1 NRC Docket No. 50-16 NRC License Number DPR-9 2) Enrico Fermi Atomic Power Plant, Unit No. 1 License Termination Plan March 2009
Subject:
License Termination Plan, Revision 1 Attached is the copy of the changed page for Revision 1 to the Enrico Fermi Atomic Power Plant, Unit No. 1 License Termination Plan (LTP). The LTP revision incorporates a correction in the values present in Table 3-2 of Chapter 3, for the years 1999 to 2002.The Fermi 1 Review Committee has approved the proposed LTP revision and concurs with the changes.If you have any questions, please contact Lynne S. Goodman, Manager, Fermi 1, at (734) 586-1205.Sincerely, Joseph H. Plona Site Vice President, Nuclear Generation JHP/ME/ljd Enclosures (2)ThM~
USNRC NRC-09-0043 Page 2 cc: NRC Regional Administrator, Region III (w/attachment)
T. Smith, NRC (Washington, D.C.) (w/attachment)
NRC Resident Inspector-Fermi 2 P. Lee, NRC Region III (w/attachment)
T. Strong (Michigan Dept of Environmental Quality) (w/attachment)
Enrico Fermi Atomic Power Plant, Unit No.1 LTP Revision 1.0 Replacement Pages The listing below provides the replacement pages for Revision 1.0 of the LTP. The listing below only identifies the LTP pages that result in changes to pages from Revision 0 of the March 2009 LTP. The replacement pages are based on double-sided pages.Chapter 1: None Chapter 2: None Chapter 3: Remove Revision 0 pages 3-9 to 3-10 and replace with Revision 1 pages 3-9 to 3-10.Chapter 4: None Chapter 5: None Chapter 6: None Chapter 7: None Chapter 8: None Glossary of Terms: None Fermi 1 License Termination Plan Chanter 3 Identification oif Decommissioning Activities Revision 1.Iune 2009....ir 3. ...... ... ....... Id ntfiato of.........
Re ann Decommisionin Aciite June.....3.4.1 Public Exposure Continued application of EF1 's current and future Radiation Protection and Radiological Effluent Programs assures public protection in accordance with 10 CFR Part 20 and 10 CFR Part 50, Appendix I. Sections 8.4.4 and 8.4.5 of this License Termination Plan (LTP) conclude that the public exposure as a result of decommissioning activities is bounded bythe evaluation in the GEIS, which includes the impact is small.3.4.2 Estimate of Quantity of Radioactive Material to be Shipped for Disposal.EF1 has shipped for radioactive disposal approximately 1,508 cubic meters (53,250 cubic feet) from 1999 through December 31, 2007. The estimate of remaining waste is 1,416 cubic meters (50000 cubic feet), most of which is dealing with the reactor vessel and large component removal. This waste is expected to be classified as Class A waste and disposed of at Energy Solution's Clive Utah disposal site. This volume of waste is bounded by NUREG-0586, (GEIS) volume for the reference pressurized water reactor of 18,343 cubic meters (647,700 cubic feet).3.4.3 Solid Waste Activity and Volume EFl's Annual Report, submitted in accordance with 10 CFR 50.36(a), includes a report on solid waste activity and volumes. This report is submitted by August 31st of each year. The Fermi 1 reporting year is July 1st to June 30th. A summary of solid waste disposal for 1997 through 2007 is provided in Table 3-1.Future updates may be obtained from EF1 via inspection or future annual reports.Table 3-1: Solid Waste Effluent Release Report Summary Yeare I TotalCuries I Nuclides 1999 37520 0.024 Co-60, Ni-63, Sr-90, Cs-137 2000 1162 0.001 Co-60, Ni-63, Sr-90, Cs-137 2001 3534 0.002 Co-60, Ni-63, Sr-90, Cs-137 2002 2324 0.009 Co-60, Ni-63, Sr-90, Cs-137 2003 1163 0.0002 Co-60, Ni-63, Sr-90, Cs-137 2004 No Shipments N/A N/A 2005 1169 0.008 Co-60, Ni-63, Sr-90, Cs-137 2006 2769 0.09 Co-60, Ni-63, Sr-90, Cs-137 2007 3611 0.02 Co-60, Ni-63, Sr-90, Cs-137 3-9 Fermi 1 License Termination Plan Chanter 3 Identification of Remaining Decommissioning Activities Revision 1 June 2009 3.4.4 Liquid Waste Activity and Volume There were no radioactive liquid releases during the period from 1997 to present.3.4.5 Gaseous Waste Activity and Volume EF1 submits the Annual Report, which includes data on gaseous waste. The set of data provided in Table 3-2 provides a compilation of this information.
A summary of the gaseous waste effluent release reports for July 1999 through June 2008 is provided below. Future updates may be obtained from EFI via inspection.
Radioactive gaseous releases are expected to cease after 2010.Table 3-2: Gaseous Waste Effluent Releases Fission &Activation Iodine Particulates Tritium TEDE Year (Ci) (Ci) (Ci) (Ci) mRem 1999 N/A N/A N/A 0.013 6.36E-06*2000 N/A N/A N/A 0.038 1.36E-05*2001 N/A N/A N/A 0.023 1.5 1E-05*2002 N/A N/A N/A 0.023 9.56E-06" 2003 N/A N/A N/A 0.035 1.74E-05 2004 N/A N/A N/A 0.013 5.96E-06 2005 N/A N/A N/A 0.012 5.78E-06 2006 N/A N/A N/A 0.03 1.70E-05 2007 N/A N/A N/A 0.004 2.75E-06 2008 N/A N/A 0.0004 0.0018 4.88E-06*TEDE reflects a revised calculation, previously reported values used an overly conservative formula 3.5 Site Description after License Release Currently, no permanent buildings or structures on site are scheduled for demolition.
Various buildings may be used for office space or maintenance activities.
At some future date, DECo may decide to refurbish or demolish any of the buildings or structures onsite.The Fermi 1 footprint remains within the Fermi 2 Owner Controlled Area (OCA)following license termination.
The Fermi 2 Updated Final Safety Analysis Report;Section 1, identifies Fermi 1 as being within the Fermi 2 OCA.3.6 Coordination with Outside Entities The decommissioning and termination of EF1 's 10 CFR Part 50 license involves, among others, the US NRC, the US Department of Transportation, the State of Michigan 3-10 Enrico Fermi Atomic Power Plant, Unit No.1 LTP Revision 1.0 Replacement Pages The listing below provides the replacement pages for Revision 1.0 of the LTP. The listing below only identifies the LTP pages that result in changes to pages from Revision 0 of the March 2009 LTP. The replacement pages are based on double-sided pages.Chapter 1: None Chapter 2: None Chapter 3: Remove Revision 0 pages 3-9 to 3-10 and replace with Revision 1 pages 3-9 to 3-10.Chapter 4: None Chapter 5: None Chapter 6: None Chapter 7: None Chapter 8: None Glossary of Terms: None Fermi 1 License Termination Plan Chaoter 3 Identification of Remainin2 Decommissioning Activities Revision 1 June 2009 3.4.1 Public Exposure Continued application of EFI's current and future Radiation Protection and Radiological Effluent Programs assures public protection in accordance with 10 CFR Part 20 and 10 CFR Part 50, Appendix I. Sections 8.4.4 and 8.4.5 of this License Termination Plan (LTP) conclude that the public exposure as a result of decommissioning activities is bounded by the evaluation in the GEIS, which includes the impact is small.3.4.2 Estimate of Quantity of Radioactive Material to be Shipped for Disposal.EF1 has shipped for radioactive disposal approximately 1,508 cubic meters (53,250 cubic feet) from 1999 through December 31, 2007. The estimate of remaining waste is 1,416 cubic meters (50000 cubic feet), most of which is dealing with the reactor vessel and large component removal. This waste is expected to be classified as Class A waste and disposed of at Energy Solution's Clive Utah disposal site. This volume of waste is bounded by NUREG-0586, (GEIS) volume for the reference pressurized water reactor of 18,343 cubic meters (647,700 cubic feet).3.4.3 Solid Waste Activity and Volume EF1 's Annual Report, submitted in accordance with 10 CFR 50.36(a), includes a report on solid waste activity and volumes. This report is submitted by August 31st of each year. The Fermi 1 reporting year is July 1st to June 30th. A summary of solid waste disposal for 1997 through 2007 is provided in Table 3-1.Future updates may be obtained from EF1 via inspection or future annual reports.Table 3-1: Solid Waste Effluent Release Report Summary'Year ': Volume Wft I Total Curies :Nuclides, 1999 37520 0.024 Co-60, Ni-63, Sr-90, Cs-137 2000 1162 0.001 Co-60, Ni-63, Sr-90, Cs-137 2001 3534 0.002 Co-60, Ni-63, Sr-90, Cs-137 2002 2324 0.009 Co-60, Ni-63, Sr-90, Cs-137 2003 1163 0.0002 Co-60, Ni-63, Sr-90, Cs-137 2004 No Shipments N/A N/A 2005 1169 0.008 Co-60, Ni-63, Sr-90, Cs-137 2006 2769 0.09 Co-60, Ni-63, Sr-90, Cs-137 2007 3611 0.02 Co-60, Ni-63, Sr-90, Cs-137 3-9 Fermi 1 License Termination Plan Chapter 3 Identification of Remaining Decommissioning Activities Revision 1.June 2009 June 2009 3.4.4 Liquid Waste Activity and Volume There were no radioactive liquid releases during the period from 1997 to present.3.4.5. Gaseous Waste Activity and Volume EF1 submits the Annual Report, which includes data on gaseous waste. The set of data provided in Table 3-2 provides a compilation of this information.
A summary of the gaseous waste effluent release reports for July 1999 through June 2008 is provided below. Future updates may be obtained from EF1 via inspection.
Radioactive gaseous releases are expected to cease after 2010.Table 3-2: Gaseous Waste Effluent Releases Fission &Activation Iodine Particulates Tritium TEDE Year (Ci) (Ci) (Ci) (Ci) mRem 1999 N/A N/A N/A 0.013 6.36E-06*2000 N/A N/A N/A 0.038 1.36E-05*2001 N/A N/A N/A 0.023 1.51E-05" 2002 N/A N/A N/A 0.023 9.56E-06*2003 N/A N/A N/A 0.035 1.74E-05 2004 N/A N/A N/A 0.013 5.96E-06 2005 N/A N/A N/A 0.012 5.78E-06 2006 N/A N/A N/A 0.03 1.70E-05 2007 N/A N/A N/A 0.004 2.75E-06 2008 N/A N/A 0.0004 0.0018 4.88E-06*TEDE reflects a revised calculation, previously reported values used an overly conservative formula 3.5 Site Description after License Release Currently, no permanent buildings or structures on site are scheduled for demolition.
Various buildings may be used for office space or maintenance activities.
At some future date, DECo may decide to refurbish or demolish any of the buildings or structures onsite.The Fermi 1 footprint remains within the Fermi 2 Owner Controlled Area (OCA)following license termination.
The Fermi 2 Updated Final Safety Analysis Report;Section 1, identifies Fermi 1 as being within the Fermi 2 OCA.3.6 Coordination with Outside Entities The decommissioning and termination of EFI's 10 CFR Part 50 license involves, among others, the US NRC, the US Department of Transportation, the State of Michigan 3-10