Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20045H269 + (15:42:35, 19 December 2024)
- ML20045H266 + (15:42:36, 19 December 2024)
- ML20045H267 + (15:42:36, 19 December 2024)
- IR 05000309/1993012 + (15:42:38, 19 December 2024)
- ML20045H264 + (15:42:41, 19 December 2024)
- IR 05000285/1993010 + (15:42:45, 19 December 2024)
- ML20045H260 + (15:42:46, 19 December 2024)
- 05000285/LER-1993-010, :on 930611,1 of 14 Halon Cylinders Did Not Meet Min Pressure Acceptance Criteria Listed in Semiannual Switchgear Rooms Surveillance Test.Caused by Failure of Test to Include Necessary Steps.Cylinder Recharged + (15:42:48, 19 December 2024)
- ML20045H254 + (15:42:51, 19 December 2024)
- ML20045H253 + (15:42:51, 19 December 2024)
- B14520, Suppls 930603 Response to NRC 930504 Notice of Violation & Demand for Info.Copies of Significant Safety Hazard Evaluation for Rosemount Transmitters,Previously Provided to Nrc,Indentical to Original Document Recently Located + (15:42:52, 19 December 2024)
- ML20045H250 + (15:42:54, 19 December 2024)
- ML20045H249 + (15:42:55, 19 December 2024)
- ML20045H248 + (15:42:56, 19 December 2024)
- ML20045H247 + (15:42:57, 19 December 2024)
- ML20045H245 + (15:42:58, 19 December 2024)
- LIC-93-0179, Requests Listed Change in Mailing Address for Util to Reflect Recent Consolidation at Plant Site + (15:42:59, 19 December 2024)
- ML20045H243 + (15:43:01, 19 December 2024)
- 05000413/LER-1993-006-02, :on 930612,automatic Reactor Trip Initiated by intermediate-range Channel N35 Hi Flux Reactor Trip Bistable.Caused by Blown Fuse in Channel.Entire Drawer Replaced & Channel Placed Back in Svc + (15:43:02, 19 December 2024)
- 05000331/LER-1993-004, :on 930611,while Performing EDG Operability Surveillance,Edg a Tripped Approx 3 After Initial Start Signal.Possibly Caused by Partially Latched Condition of Trip Mechanism.Latch Will Be Reset + (15:43:04, 19 December 2024)
- ML20045H240 + (15:43:05, 19 December 2024)
- ML20045H238 + (15:43:06, 19 December 2024)
- ML20045H236 + (15:43:08, 19 December 2024)
- ML20045H237 + (15:43:08, 19 December 2024)
- ML20045H235 + (15:43:09, 19 December 2024)
- NRC-93-0081, Monthly Operating Rept for June 1993 for Fermi 2 + (15:43:11, 19 December 2024)
- ML20045H233 + (15:43:17, 19 December 2024)
- ML20045H232 + (15:43:18, 19 December 2024)
- ML20045H231 + (15:43:21, 19 December 2024)
- ML20045H230 + (15:43:23, 19 December 2024)
- ML20045H228 + (15:43:24, 19 December 2024)
- ML20045H227 + (15:43:25, 19 December 2024)
- BVY-93-071, Monthly Operating Rept for June 1993 for Vermont Yankee Nuclear Power Station + (15:43:27, 19 December 2024)
- ML20045H226 + (15:43:27, 19 December 2024)
- ML20045H223 + (15:43:30, 19 December 2024)
- ML20045H221 + (15:43:30, 19 December 2024)
- ML20045H219 + (15:43:32, 19 December 2024)
- B14523, Forwards Rev 2 to Nuclear Engineering & Operations (Neo) Procedure Neo 2.35, Pep Verification & Validation Program + (15:43:33, 19 December 2024)
- ML20045H215 + (15:43:35, 19 December 2024)
- RC-93-0186, Monthly Operating Rept for June 1993 VC Summer Nuclear Station,Unit 1 + (15:43:36, 19 December 2024)
- ML20045H212 + (15:43:38, 19 December 2024)
- PY-CEI-NRR-1664, Forwards Primary Reactor Containment ILRT Rept. Rept Summarizes Results of Periodic Test Conducted on 930222-0304,during Mid-Cycle 4 Maint Outage + (15:43:39, 19 December 2024)
- ML20045H208 + (15:43:42, 19 December 2024)
- ML20045H205 + (15:43:43, 19 December 2024)
- ML20045H204 + (15:43:44, 19 December 2024)
- ML20045H203 + (15:43:45, 19 December 2024)
- ML20045H202 + (15:43:46, 19 December 2024)
- ML20045H201 + (15:43:47, 19 December 2024)
- ML20045H199 + (15:43:48, 19 December 2024)
- ML20045H200 + (15:43:48, 19 December 2024)
- ML20045H198 + (15:43:50, 19 December 2024)