Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217G3541999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbaps,Units 2 & 3. with ML20212A5871999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Peach Bottom,Units 2 & 3.With ML20210N7641999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for PBAPS Units 2 & 3. with ML20209H1121999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbaps,Units 2 & 3. with ML20195H8841999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbaps,Units 2 & 3. with ML20206N1661999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pbaps,Units 2 & 3. with ML20205P5851999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Peach Bottom Units 2 & 3.With ML20207G9971999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Peach Bottom Units 2 & 3.With ML20199E3471998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Peach Bottom,Units 1 & 2.With ML20198B8591998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Pbaps,Units 2 & 3. with ML20195E5341998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Pbaps,Units 2 & 3. with ML20154H5541998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Pbaps,Units 2 & 3. with ML20151Y2901998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbaps,Units 2 & 3. with ML20237A5351998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Pbaps,Units 2 & 3 ML20236M3471998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbaps,Units 2 & 3 ML20248M3001998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Pbaps,Units 2 & 3 ML20247G0721998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Pbaps,Units 2 & 3 ML20216F3831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Peach Bottom,Units 2 & 3 ML20216G1991998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Peach Bottom Atomic Power Station,Units 1 & 2 ML20202F7341998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Pbaps,Units 2 & 3 ML20198N8851997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Peach Bottom,Units 2 & 3 ML20203J7311997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Pbaps,Units 2 & 3 ML20199D1241997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Peach Bottom,Units 2 & 3 ML20198J8871997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Pbaps,Units 2 & 3 ML20217A8061997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Peach Bottom Units 2 & 3 ML20210J7111997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Pbaps,Units 1 & 2 ML20141H2071997-06-30030 June 1997 Monthly Operating Repts for June 1997 for PBAPS ML20148K6251997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Peach Bottom Atomic Power Station Units 2 & 3 ML20141D3691997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Peach Bottom Units 2 & 3 ML20137V9731997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Peach Bottom Atomic Power Station Units 2 & 3 ML20136G3671997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for PBAPS ML20138K5551997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Peach Bottom Units 2 & 3 ML20133H6121996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Peach Bottom 2 & 3 ML20132B9481996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Peach Bottom Units 1 & 2 ML20134M0501996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Peach Bottom Unit 2 & 3 ML20129A9871996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Peach Bottom Unit 2 & 3 ML20117N1601996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Peach Bottom Atomic Power Station Units 1 & 2 ML20116M1641996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Peach Bottom Units 2 & 3 ML20115F8541996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Peach Bottom Units 1 & 2 ML20116M1701996-06-30030 June 1996 Revised MOR for June 1996 for Peach Bottom Unit 3 ML20117M6781996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Peach Bottom Atomic Power Station ML20117F8161996-04-30030 April 1996 Monthly Operating Repts for April 1996 for PBAPS ML20107D9381996-03-31031 March 1996 Monthly Operating Repts for March 1996 for PBAPS ML20106G8101996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Peach Bottom Atomic Power Station Units 1 & 2 ML20149K9331996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for PBAPS Units 2 & 3 ML20096F4151995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Pbaps,Units 2 & 3 ML20095G9381995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for PBAPS Units 2 & 3 ML20094L6301995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Peach Bottom Units 2 & 3 ML20093G3571995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for PBAPS Units 1 & 2 ML20092G3231995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Peach Bottom Units 2 & 3 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEAR05000278/LER-1999-005-03, :on 990920,uplanned Esfas During Planned Mod Activitives in Main CR Were Noted.Caused by Inattention to Detail by Individuals Performing Work.All CR Mods Were Ceased to Allow Review of Mod Work Packages.With1999-10-20020 October 1999
- on 990920,uplanned Esfas During Planned Mod Activitives in Main CR Were Noted.Caused by Inattention to Detail by Individuals Performing Work.All CR Mods Were Ceased to Allow Review of Mod Work Packages.With
ML20217K9931999-10-14014 October 1999 Safety Evaluation Supporting Amend 234 to License DPR-56 ML20217B4331999-10-0505 October 1999 Safety Evaluation Supporting Amend 233 to License DPR-56 05000278/LER-1999-004-03, :on 990901,3A RPS Bus Was Inadvertently Deenergized,During Planned Mod Activities on Main CR Panel. Caused by Electrician Failing to Self Check Work.All CR Work Was Ceased Immediately & Shutdown Meeting Held1999-10-0101 October 1999
- on 990901,3A RPS Bus Was Inadvertently Deenergized,During Planned Mod Activities on Main CR Panel. Caused by Electrician Failing to Self Check Work.All CR Work Was Ceased Immediately & Shutdown Meeting Held
ML20217G3541999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbaps,Units 2 & 3. with ML20216H7091999-09-24024 September 1999 Safety Evaluation Supporting Amends 229 & 232 to Licenses DPR-44 & DPR-56,respectively ML15112A7681999-09-20020 September 1999 SER Accepting Revision 25 of Pump & Valve Inservice Testing Program,Third 10-year Interval for Plant,Units 1,2 & 3 ML20212D1281999-09-17017 September 1999 Safety Evaluation Supporting Proposed Alternatives CRR-03, 05,08,09,10 & 11 05000278/LER-1999-003-03, :on 990814,HPCIS Was Declared Inoperable Due to Erratic Behavior Resulting in Loss of Single High Train Safety Sys.Caused by Weakness in Procedural Guidance. Readjusted Hydraulic Governor Needle Valve.With1999-09-13013 September 1999
- on 990814,HPCIS Was Declared Inoperable Due to Erratic Behavior Resulting in Loss of Single High Train Safety Sys.Caused by Weakness in Procedural Guidance. Readjusted Hydraulic Governor Needle Valve.With
ML20212A5871999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Peach Bottom,Units 2 & 3.With ML20211D5501999-08-23023 August 1999 Safety Evaluation Supporting Amends 228 & 231 to Licenses DPR-44 & DPR-56,respectively ML20212H6311999-08-19019 August 1999 Rev 2 to PECO-COLR-P2C13, COLR for Pbaps,Unit 2,Reload 12 Cycle 13 ML20210N7641999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for PBAPS Units 2 & 3. with 05000277/LER-1999-005-01, :on 990616,failure to Maintain Provisions of FP Program Occurred.Caused by Less than Adequate Engineering Rigor in Both Development & Review Analysis.Fire Watch Immediately Established.With1999-07-16016 July 1999
- on 990616,failure to Maintain Provisions of FP Program Occurred.Caused by Less than Adequate Engineering Rigor in Both Development & Review Analysis.Fire Watch Immediately Established.With
ML20209H1121999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbaps,Units 2 & 3. with ML20195H8841999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbaps,Units 2 & 3. with 05000278/LER-1999-002-02, :on 990406,safeguard Sys to Unrelated Door Was Inadvertently Disabled by Security Alarm Station Operator. Caused by Noncompliance with Procedures & Less than Adequate Shift Turnover.Briefed Personnel on Event.With1999-05-0606 May 1999
- on 990406,safeguard Sys to Unrelated Door Was Inadvertently Disabled by Security Alarm Station Operator. Caused by Noncompliance with Procedures & Less than Adequate Shift Turnover.Briefed Personnel on Event.With
ML20206N1661999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pbaps,Units 2 & 3. with ML20206A2921999-04-20020 April 1999 Safety Evaluation Concluding That Proposed Changes to EALs for PBAPS Are Consistent with Guidance in NUMARC/NESP-007 & Identified Deviations Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50 05000278/LER-1999-001-03, :on 990312,ESF Actuation of Rcics Occurred Due to High Steam Flow Signal During Sys Restoration.Temporary Change to Restoration Procedure Was Initiated to Open RCIC Outboard Steam Isolation Valve in Smaller Increments1999-04-0808 April 1999
- on 990312,ESF Actuation of Rcics Occurred Due to High Steam Flow Signal During Sys Restoration.Temporary Change to Restoration Procedure Was Initiated to Open RCIC Outboard Steam Isolation Valve in Smaller Increments
ML20205K7411999-04-0707 April 1999 Safety Evaluation Supporting Amends 227 & 230 to Licenses DPR-44 & DPR-56,respectively ML20205P5851999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Peach Bottom Units 2 & 3.With ML20207G9971999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Peach Bottom Units 2 & 3.With 05000278/LER-1998-009-01, :on 981227,unplanned Esfa Were Noted.Caused by Transformer Insulator Failure.Replaced Failed Insulator. with1999-01-20020 January 1999
- on 981227,unplanned Esfa Were Noted.Caused by Transformer Insulator Failure.Replaced Failed Insulator. with
ML20199E3471998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Peach Bottom,Units 1 & 2.With ML20206P1651998-12-31031 December 1998 Fire Protection for Operating Nuclear Power Plants, Section Iii.F, Automatic Fire Detection ML20205K0381998-12-31031 December 1998 PECO Energy 1998 Annual Rept. with ML20206D3651998-12-31031 December 1998 1998 PBAPS Annual 10CFR50.59 & Commitment Rev Rept. with ML20206D3591998-12-31031 December 1998 1998 PBAPS Annual 10CFR72.48 Rept. with 05000277/LER-1998-008-01, :on 981130,circuit Breaker SU-25 Tripped.Caused by Less than Adequate Procedural Guidance.Operators Verified Sys Integrity & Successfully Returned Sys to Svc.With1998-12-30030 December 1998
- on 981130,circuit Breaker SU-25 Tripped.Caused by Less than Adequate Procedural Guidance.Operators Verified Sys Integrity & Successfully Returned Sys to Svc.With
05000277/LER-1998-007-02, :on 981107,failure to Meet TS & Associated LCO Requirments of Absolute Difference in APRM & Calculated Power of Less than 2% Was Noted.Caused by Substitute Valves Being Used.Removed Substitute Valves.With1998-12-0404 December 1998
- on 981107,failure to Meet TS & Associated LCO Requirments of Absolute Difference in APRM & Calculated Power of Less than 2% Was Noted.Caused by Substitute Valves Being Used.Removed Substitute Valves.With
ML20196G7021998-12-0202 December 1998 SER Authorizing Proposed Alternative to Delay Exam of Reactor Pressure Vessel Shell Circumferential Welds by Two Operating Cycles ML20196E8261998-11-30030 November 1998 Response to NRC RAI Re Reactor Pressure Vessel Structural Integrity at Peach Bottom Units 2 & 3 ML20198B8591998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Pbaps,Units 2 & 3. with 05000278/LER-1998-005-03, :on 981025,inadvertent Unit 3 Electrical Bus E33 Trip (Esfa) During Performance of Unit 2 Electrical Bus E32 Surveillance Test Was Noted.Caused by Personnel Error. Sp S12M-54-E32-XXF4 Was Completed.With1998-11-20020 November 1998
- on 981025,inadvertent Unit 3 Electrical Bus E33 Trip (Esfa) During Performance of Unit 2 Electrical Bus E32 Surveillance Test Was Noted.Caused by Personnel Error. Sp S12M-54-E32-XXF4 Was Completed.With
ML20206R2571998-11-17017 November 1998 PBAPS Graded Exercise Scenario Manual (Sections 1.0 - 5.0) Emergency Preparedness 981117 Scenario P84 ML20198C6751998-11-0505 November 1998 Rev 3 to COLR for PBAPS Unit 3,Reload 11,Cycle 12 ML20195E5341998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Pbaps,Units 2 & 3. with ML20155C6071998-10-26026 October 1998 Safety Evaluation Supporting Amend 226 to License DPR-44 ML20155C1681998-10-22022 October 1998 Safety Evaluation Accepting Proposed Alternative Plan for Exam of Reactor Pressure Vessel Shell Longitudinal Welds ML20155H7721998-10-12012 October 1998 Rev 1 to COLR for Peach Bottom Atomic Power Station Unit 2, Reload 12,Cycle 13 05000277/LER-1998-006-02, :on 980915,automatic RWCU Isolation Occurred While Placing RWCU Sys in Svc.Caused by Unexpected Surge of Water.Procedure Change Was Initiated to Open MO-2-12-74 & RWCU Sys Was Successfully Returned to Svc.With1998-10-0909 October 1998
- on 980915,automatic RWCU Isolation Occurred While Placing RWCU Sys in Svc.Caused by Unexpected Surge of Water.Procedure Change Was Initiated to Open MO-2-12-74 & RWCU Sys Was Successfully Returned to Svc.With
ML20154J2401998-10-0505 October 1998 Safety Evaluation Supporting Amends 224 & 228 to Licenses DPR-44 & DPR-56,respectively ML20154H4771998-10-0505 October 1998 Safety Evaluation Supporting Amends 225 & 229 to Licenses DPR-44 & DPR-56,respectively ML20154G6821998-10-0101 October 1998 SER Related to Request for Relief 01A-VRR-1 Re Inservice Testing of Automatic Depressurization Sys Safety Relief Valves at Peach Bottom Atomic Power Station,Units 2 & 3 ML20154G6631998-10-0101 October 1998 Safety Evaluation Supporting Amends 223 & 227 to Licenses DPR-44 & DPR-56,respectively ML20154H5541998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Pbaps,Units 2 & 3. with 05000278/LER-1998-004-03, :on 980820,automatic RWCU Isolation Occurred While Placing B RWCU Sys Demineralizer in Svc.Caused by less-than-adequate Control of Equipment.Isolated B Demineralizer & Returned RWCU Sys to Svc1998-09-18018 September 1998
- on 980820,automatic RWCU Isolation Occurred While Placing B RWCU Sys Demineralizer in Svc.Caused by less-than-adequate Control of Equipment.Isolated B Demineralizer & Returned RWCU Sys to Svc
05000277/LER-1998-005-02, :on 980824,noted Failure to Meet TS Actions for Suppression chamber-to-drywell Vacuum Breaker Not Being Fully Seated.Caused by Personnel Failing to Take All TS Required Actions.Temporary Procedure Changes Were Made1998-09-18018 September 1998
- on 980824,noted Failure to Meet TS Actions for Suppression chamber-to-drywell Vacuum Breaker Not Being Fully Seated.Caused by Personnel Failing to Take All TS Required Actions.Temporary Procedure Changes Were Made
ML20153B9651998-09-14014 September 1998 Safety Evaluation Supporting Amend 9 to License DPR-12 1999-09-30
[Table view] |
Text
CCN 93-14098 PHILADELPHIA ELECTRIC COMPANY
~
. fe PEACH BOTTOM ATOMIC POWER STATION g*+ x%, e Mo s R.D.1, Box 208
- h Delta, Pennsylvania 17314
% A mf.*
nen wnDM-THE Imu OF EXCIRENCE (717) 456-7014 D. B. M:ller Jr.
Vce President July 14, 1993 Docket Nos. 50-277 50-278 U.S. Nuclear Regulatory Cammission Document Control Desk Washington, DC 20555
SUBJECT:
Feach Bottam Atomic Power Station Monthly Operatirg Report Gentlemen:
Enclosed are twelve copies of the monthly operating report for Peach Bottam Units 2 and 3 for the month of June 1993 forwarded pursuant to Technical Specification 6.9.1.d urder the guidance of Regulatory Guide 10.1, Revision 4.
Sincerely, DBM/
/
/P mss Enclosure cc:
R.A. Burricelli, Public Service Electric & Gas U.P. Dornsife, Ctamorucalth of Pennsylvania J.J. Lyash, USNRC Senior Resident Inspector R.I. McIran, State of Marylard T.T. Martin, Administrator, Region I, USNRC H.C. Schwemm, Atlantic Electric C.D. Schaefer, Delmarva Ptwer INTO Records Center l
l CCD693.NRC Y l 9307190207 930630 M
(
i PDR ADOCK 05000277 R
PDR
'g
NIC lbnthly Operaticrs Smery Ibach Battcm Atamic Ibwer Staticri June 1993 t
UNIT 2 Unit 2 began the month at naminal 100% power. On June 4, operators redu d load to approxirately 1070 MWe to perform a Itx1 pattern adjustnent after which the unit was Inturned to 100% power. On June 6 power was again reduced to approximately 1050 MWe as requested by the load Dispatdier. The unit was returned to 100% pcuer later on June 6th and remained there until June 24th when power was reduced to 625 MWe for repair of HPCI testable check valve. After repairs were completed the unit was returned to 100% power ard runained there for the rest of June.
INIT 3 Unit 3 began the month at naminal 100% power. On June 12th power was reduced to approximately 750 MWe for IHM calibration and "E" Tip Pachine work. Power remainecl at approximately 750 MWe until June 15th when pcuer was reduced to 630 MWe for red pattern adjustment. 7he unit was returned to approximately 904 MWe and operated in a fuel coastdown mode for the remainder of June.
r i
4 CC0693.NRC
i Docket No. 50-277 Attachment to Monthly Operatire Report for June 1993 uilT 2 REFUEIJPG INRIMNTIOT 1.
Name of facility:
Peach Bottom Unit 2 2.
Schechled date for next refueling shutdown:
Reload 10 scheduled for September 10, 1994.
3.
Scheduled date for restart following refueling:
l Restart following refueling forecast for December 8,1994.
4.
Will refuelirg or resumption of operation therefore require a technical specification change or other license amendment?
No.
If answer is yes, what, in general, will these be?
5.
Scheduled date(s) for submittiry propoccd licensing action ard rnprting information:
t N/A 6.
Important licensiry considerations associated with refuelirg, e.g., new or different fuel design or supplier, unreviewed design or perfonnance analysis rethcds, significant charges in fuel design, new operatirg procedures:
N/A CC0693.NRC
Ibcket No. 50-277 Attachment to Monthly Operating Report for June 1993 Page 2 INIT 2 REFUETJ1C INFU@RTICH (Continued) 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a)
Core - 764 Fuel Assemblies (b)
Fuel Pool - 2164 Fuel Assemblies, 58 Fuel Rods 8.
The present licensed spent fuel pool storage capacity and the size of any increa.se in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
9.
The projected date of the last refuelirg that can be discharged to the spent fuel pool assuming the present capacity:
September 2003 without full core offload capability.
Septerber 1997 with full core offload capability.
CC0693.NRC
Docket No. 50-278 Attachment to Monthly operating-Ecport for June 1993 UNIT 3 REFUFTDG INFOR!RTIOT 1.
Name of facility:
Peach Bottom Unit 3 2.
Schaluled date for next refueling shutdown:
Reload 9 scheduled for September 11, 1993 Scheduled date for restart followirg refueling 3.
Restart follcuirg refueling scheduled for November 14, 1993 Will refueliry or resumption of operation thereafter require a tedinical 4.
specification change or other license amendnunt?
Yes If answer is yes, what, in general, will these be?
92-19 Omnge safety limit MCFR for Cycle 10 93-01 ARTS /MEIIA 93-06 Drywell Rad Monitors Scheduled date(s) for submitting proposed licensire action and swrting 5.
information:
92-19 Submitted February 1993 93-01 Submitted April 1993 93-06 Scheduled for April 1993 CC0693.NRC f
I
i
\\
Cocket No. 50-278 Attachment to Monthly Operating Report for June 1993 Page 2 UNIT 3 REFUPLIIC INIURfRTION (Continued) 6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A 7.
The number of fuel assemblies (a) in the core ard (b) in the spent fuel storage pool:
(a)
Core - 764 Fuel Assemblics (b)
Fuel Pool - 1945 Fuel Assemblies, 6 Fuel Rods 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been rtgaested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool amming the present capacity:
September 2004 without full core offload capability.
September 1998 with full core offload capability.
Cc0603.NRC
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 277 UNIT PEACH BOTTOM UNIT 2 DATE JULY 15,1993 COMPANY PHILADELPHIA ELECTRIC COMPANY M. J. BARON r
SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POWER STATION
_ TELEPHONE (717) 456-7014 EXT. 3321
.f MONTH JUNE 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 1055 17 1048 2
1049 18 1D47 3
1045 19 1043 4
1048 20 1045 5
1052 21 1052
-I 6
1060 22 1040 7
1044 23 1044 i
8 1053 24 961 9
1D60 25 1047 10 1059 26 1038 11 1055 27 1038 12 1055 28 1041 13 1056 29 1D46 14 1051 30 1041 l
15 1059 16 1049 4
i l
i
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE JULY 15, 1993 COMPANY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS CROUP PEACH BOTTOM ATOMIC POWER STATION
, TELEPHONE (717) 456-7014 EXT. 3321 MONTH JUNE 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE NET) 1 961 17 B69 2
931 18 864 3
927 19 B60 4
938 20 853 5
938 21 B64 6
942 22 B48 7
926 23 852 8
927 24 842 9
934 25 B42 10 929 26 B34 11 921 27 834 12 752 28 827 13 741 29 828 14 745 30 823 15 745 16 874 2
1 l
OPERATING DATA REPORT DOCKET No. 50 277 DATE JULY 15,1993 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERv!SOR REPORTS GROUP PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 3321 OPERATING STATUS
- 1. UNIT NAME: PEACH BOTTOM ' NIT 2 NOTES:
- 2. REPORTING PERIDO:
JUNE, 1993
- 3. LICENSED THERMAL POWER (MWT):
3293
- 4. NAMEPLATE RATING (GROSS MVE):
1152
- 5. DESIGN ELECTRICAL RATING (NET MWE):
1065
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1098
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
1051
- 8. IF CHANCES OCCUR IN CAPACITY RATINGS (1TEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720 4,343 166,463
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 3,719.0 102,103.1
- 13. REACTOR RESERVE SHUTDDWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON LINE 720.0 3,562.0 98,211.2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 16, GROSS THERMAL ENERGY GENERATED (MWH) 2,360,484 11,319,679 291,689,423
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 781,700 3,742,600 95,914,990
- 18. NET ELECTRICAL ENERCY GENERATED (MWH) 753,160 3,620,507 91,907,226 PAGE 1 0F 2
I OPERATING DATA REPORT (CONTINUED)
DOCKET NO. 50 - 277
]
DATE JULY 15,1993 THis MONTH YR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100.0 82.0
'59.0
- 20. UNIT AVAILABILITY FACTOR 100.0 82.0 59.0
- 21. UNIT CAPACITY F ACTOR (USING MDC NET) 99.5 79.3 52.5
- 22. UNIT CAPACITY FACTOR (USING DER NET) 98.2 78.3 51.8 i
- 23. UNIT FORCED OUTAGE RATE 0.0 5.7 14.2 -
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)*
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESilMATfD DATE OF STARTUP: N/A
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 09/16/73 INITIAL ELECTRICITY 02/18/74 COMMERCIAL OPERATION 07/05/74 k
PAGE 2 0F 2 r
h
l j
l OPERATING DATA REPORT DOCKET NO. 50 - 278 DATE JULY 15, 1993 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY i
M. J. BARON SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXI. 3321 OPERATING STATUS
- 1. UNIT NAME: PEACH BOTTOM UNIT 3 NGiES:
- 2. REPORTING PERIOD:
JUNE, 1993
- 3. LICENSED THERMAL POWER (MVT):
3293
- 4. NAMEPLATE RATING (CROSS MWE):
1152
- 5. DESIGN ELECTRICAL RATING (NET MWE):
1065
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1098
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
1035
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720 4,343 162,359
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 4,243.0 102,301.4
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE 720.0 4,224.0 98,921.2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,017,694 13,102,481 291,683,691
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 652.200 4,287,000 95,727,132
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 623,246 4,149,195 91,813,161 PAGE 1 0F 2
OPERATING DATA REPORT (CONTINUED)
DOCKET NO. 50 278 DATE JULY 15, 1993 THIS MONTH YR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100.0 97.3 60,9
- 20. UNIT AVAILABILITY FACTOR 100.0 97.3 60,9
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 83.6 92.3 54.6
- 22. UNIT CAPACITY FACTOR (USING DER NET) 81.3 89.7 53.1
- 23. UNIT FORCED OUTAGE RATE 0.0 2.7 12.3
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 11/14/93
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/01/74 COMMERCIAL OPERATION 12/23/74 PAGE 2 0F 2
.~n.
4 i
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 277 UNIT NAME PEACH BOTTOM UNIT 2 DATE JULY 15,1993 REPORT MONTH JUNE, 1993 COMPLETED BY PHILADELPHIA ELECTRIC COMPANT
~
M. J. BARON SUPERVISOR REPDRTS GROUP PEACH BOTTOM ATOMIC POWER STATIDW TELEPHCNE (717) 456-7014 EXT, 3321 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE l TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO f(1)
(HOURS)
(2)
REACTOR (3)
REPORT #
(4)
(5)
PREVENT RECURRENCE NO.
DATE 15 930606 S
6.0 H
4 N/A EB CKTBRK REDUCED GENERATION REQUESTED BY LDAL DISPATCHER. REACTOR NOT SHUTDOWN.
16 930624 F
8.0 A
4 CE VALVEX REPAIR OF HPCI TESTABLE CHECK VALVE 14.0 (1)
(2)
(3)
(4)
F - FORCED REASON METHOD EXH! BIT C
- INSTRUCTIONS S SCHEDULED A - E00lPMENT FAILURE (EXPLAIN) 1. MANUAL FOR PREPARATION OF DATA i B - MAINTENANCE DR TEST 2 + MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER)
D. REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE (NUREG-0161)
E. OPERATOR TRAINING + LICENSE EXAMlWAT10N T ADMINISTRATIVE
($)
G - DPERATIONAL ERROR (EXPLAlW)
H - OTHER(EXPLAIN)
EXHIBli ! - SAME SOURCE l
i
i UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No. 50 278 UNIT NAME PEACH BOTTOM UNIT 3 DATE JULY 15, 1993 REPORT MONTH JUNE, 1993 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY
~
M. J. BARON SUPERVISOE REPORTS CROUP PEACH BOTTOM ATDMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 3321 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.
DATE (1) !(HOURS)
(2)
REACTOR (3)
REPORT #
(4)
(5)
PREVENT RECURRENCE 15 930612 S
108,0 H
4 N/A RC FUELXX ROD PATTERN ADJUSTHENT TO A SYMMETRIC PAT 1ERN FOR LPRM CALIBRAT!DN. REACTOR NOT SHUTDOWN 108.0 (1)
(2)
(3)
(4)
F - FORCED REASON METHOD EXHIBli G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 AUTOMATIC SCRAM.
EVENT REPORT (LER)
Da REGULATORY RESTRICT 10N 4a OTHER (EXPLAIN)
FILE (NUREG 0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN)
EXHIBli 1 - SAME SOURCE.