- y ll l
Duke Potter Company Dectric Center r0 Box 1006 Charlone, N C 282011006 DUKEPOWER July 15,1993 l
U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.
20555 l
RE: Catawba Nuclear Station 1
Docket No. 50-413 and -414 L
File: GS-801.01
Dear Sir:
Please find attached information concerning the performance and operating status of the Catawba Nuclear Station for the mon'.h of June,1993.
Very truly yours, tO E. O. McCraw, Manager Operations, Perfonnance & Automation E0M/ raw Attachments xc: Stewart D. Ebneter Bob Martin Regional Administrator / Region II Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission 101 Marietta Street, NW, Suite 2900 Washington, D.C.
20555 Atlanta, GA 30323 INPO Records Center Ms. Margaret Aucoin Suite 1500 Nuclear Assurance Corporation 1100 circle 75 Parkway Suite 200 Atlanta, GA 30323 655 Engineering Drive Norcross, GA 30092-2843 American Nuclear Insurers W. T. Orders c/o Dottie Sherman, ANI 1.ibrary Senior Resident Inspector Town Center, Suite 300S Catawba Nuclear Station 29 South Main Street West Hartford, CT 06107-2445 9307290256 930gjep er l
yDR ADDCK 05000433 d
l 20 0 0 n-__
i
)
1 1
U.S. NRC - Catawba July 15, 1993 Page 2 bc: K. S. Canady (EC08H)
- 8. T. Faulkenberry (EC07C)
R. C. Futrell (CNS)
T. E. Mooney (EC05N)
B. J. Horsley (EC030)
N. A. Rutherford (EC071)
E. G. LaCasse (CNS)
R. A. Williams (EC07A) (3)
J. C. Wimbish (EC078)
E. C. Fisher (MNS)
- 8. W. Walsh (PB02L)
Jim Thomae (CNS)
C. D. Denton (PB05E)
J. S. Forbes (CNS)
Candace Paton (PB02L)
G. A. Copp (EC050) (File) 1
+
i
. t r
w w
~.
-- -~-
+
b l
l DFERATINS DATA REPORT j
EDCKET NO 50-413 BATE July 15. 1993 0FERATiks STATUS CDMPLETED BY R.A. Williaes TELEPHONE 704-382-5346
- 1. Unit Name: Catarba 1 l
- 2. Rept;rting Period: June 1, 1993-June 30, 1993
- 3. Licensed Theraal Pcuer (MWt):
3411
- 4. Nameplate Rating (Bross MWelt-13051 Notes
- Nameplate Rating
?
- 5. Design Electrical Rating (Net MWe):
1145
.(Bross MWe) calculated as
- 6. Muists Dependable Capacity (Bross MWe):
1192 1450.000 NVA x.90 power
- 7. Maxinus Dependable Capacity (Net NWel:
1129 factor per Fage lii, B. If Changes Occur in Capacity Ratings (1ters Number 3 Through 71 Since Last NURES-0020.
Report. Give Reasons:
- 9. Feuer Level To Which Festricted, if Any (Net MWe)
- 10. Reason for Restrictions, If any:
l 1
This Month Yr.-to-Date Cumulative
- 11. Hours in Reperting Period 720.0 4343.0 70176.0 2:
- 12. Nuber Df Hours Reactor Was Critical 433.6 4056.6 52B43.2
- 13. Reactor Reserve Shutdown Hours
--0--
- --0--
- 14. Hours Benerator Un-Line.
419.3 4n42.3 51777.1
- 15. Unit Reserve Shutdown Hours
--0--
--0--
--0--
- 16. Gross Thereal Energy Generated (MWH) 1226666 13328327 167265135
- 17. Gross Electrical Energy Generated MWH) 419231 4728200 59053499
- 18. Net Electrical Energy Eenerated (MWH1 332931
'446B430 55433671
- 19. Unit Se vice Factor 58.2 93.1 73.8
- 20. Unit Availability fatter 58.2 93.1 73.B
- 21. Unit Capacitr Facter (Using MDC Net) 47.1 91.1 69.7
- 22. Unit Capacity Fatter (Usirig DER Net) 46.5 89.9 69.0
- 23. Unit Forced Outage Rate 41.8 6.9 10.7 l
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueline - October 16. 1993 72 days
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Costercial Operation):
Forecast Achieved-I INITIAL CRITICAL.lTY INITIAL ELECTRICITY COMERCIAL OFERATION s
9 c
m
I a
DPERATING DATA REPORT l
1 l
l DOCKET N3 -
50-413 UNIT Catawba 1 DATE July 15,1993 COMPLETED BY R.A. Willines i
TELEPHONE 704-392-5346 i
i MGMTH June. 1993 M
AVEliABE DAILY POWER LEVEL E
AVERAGE DAILY F0WER LEVEL' l
(MWe-Net)
(MWe-Net) 1 1094 17 0
l 2
1078 18 0
3 1092
-19 0
4 1088 20 0
- i 5
373 21 0
6 567 22 0
h t
- 7 1069 23 0
S 1091 M
0 i
?
9
=640 25 535 10 045 26 1097 s
11 1082 27 1122 i
12 1S4 28 1146 i
- 13 0
29
!!36 14 0
30 1135
'l
't i
15 0
r 16 0-i r
i
- - - - 'a v
r
+
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-413 UNIT NAME CATAwt$A 1 DATE u //13/ 9 3 REPORT MONTH June 1993 COMPLETED BY N.
C.
61MMUNS TELEPHONE
(/u43-36z-3z63 (1) 2)
(4)
(5)
E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO t
DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 3-P 93 5 F
A HC HTEXCH HOLD AT 30% POWER FOR SECONDARY CHEMISTRY DUE TO CONDENSER TUBE LEAKAGE A
HC HTEXCH CONDENSER TUBE LEAKAGE REPAIR 4-P 93 6 F
5-P 93 9 F
A HC HTEXCH HOLD AT 32% POWER FOR SECONDARY CHEMISTRY DUE TO CONDENSER TUBE' LEAKAGE 6-P 93 9 F
A HC HTEXCH CONDENSER TUBE LEAKAGE REPAIR 1
93-6-12 F
300.68 A
1 HB TURBIN EXPANSION JOINT LEAKAGE REPAIR (1)
(2)
(3)
(4)
F Forced Reason
- Method:
Exhibit G - Instructions 1-Manual for. Preparation of, Data A-Equi ment FailureB-Main enance or test (Explain)
S Scheduled 2-Manual-Scram Entry Sneets For Licensee C-Refueling 3-Automatic Scram Eyent Report ( NUREG-0161) ) -
(LER D-Regulatory Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (S)
G-Operator Error (Explain)
Exhibit I - Same Source H-Other (Explain)
l 4
i MONTHLY REFUELING INFORMATION REOUEST 1.
Facility name: Catawba.
Unit 1 2.
Scheduled next refueling shutdown: October 1993 3.
Scheduled restart following refueling: December 1993 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.
CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or
- supplier, unreviewed design or performance analysis' methods, 4
significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 1_93 (b) in the spent fuel pool: 408 8.
Present licensed fuel pool capacity: 1418 Size of requested or planned increase 9.
Projected date of last refueling which can be accommodated by' present licensed capacity: Septembe_r 2009 DUKE POWER COMPANY DATE:
July 15, 1993 j
Name of
Contact:
N.
C.
Simmons Phone:
704-382-5263
i
)
i DOCKET: 50-413 UNIT: Catawba 1 Date: 07/15/93 NARRATIVE
SUMMARY
MONTH: June 1993 Catawba Unit 1 began the month of June operating at 100% full power. The unit started a power e
decrease on 6/5 at 0100 and held at 30% power from 0710 to 6/6 at 0312 for feedwater chemistry due to a condenser tube leakage. The unit increased power and held at approximately 40% power from 0716 to 1255 for condenser tube leakage repair. The unit was retumed to 100% full power on 6/7 at 0145. The unit star 1ed a power decrease on 6/9 at 0539 and held at 32% power from 1300 to 1921 for feedwater chemistry due to a condenser tube leakage. The unit increased power and held at approximately 40%
power from 2145 to 6/10 at 0218 for condenser tube leakage repair. The unit was retumed to 100% full power on 6/10 at 1630. The unit started a power decrease on 6/12 at 0000 to take the unit off-line. The unit was off-line from 6/12 at 1003 to 6/24 at 2244 for expansion joint leakage repair. The unit was retumed to 100% full power on 6/27 at 0350. The unit operated at or near 100% full power for the remainder of the month.
j l
1 Prepared by N. C. Simmons Telephone: 704-382-5263 j
i 1
j l
-j GPERATING DATA REPORT DOCIETNO.
50-414' UATE July 15. 1993 l
'DPEN TING STATUS COMPLETED BY R.A. Williass TELEPHONE 704-382-5346
- 1. Unit Naee: Catawba 2
- 2. Reporting feriod: June 1, 1993-June 30, 1993
- 3. Licensed Thermal Power (MWt):
3411
- 4. Naseplate Rating (Bross MWe b 1305+
Notes
- Nameplate Rating
'5. Design Electrical Rating (Net MWe):
!!45
'(Gross HWe) calculated as 6.11nisus Dependable Capacity (Bross MWe):
1192 1450.000 MVA x.90 power
- 7. Maxisca Dependable Capacity (Net MWe):
1129 factor per Page iii,
- 8. If Changes Occur in Capacity Ratings (Iteas Nusher 3 Through 7) Sinte Last NUREG-0020.
Report. Give Reasons:
- 9. Power Level To Which Restricted, if Any (Net MWelt i
- 10. Reason For Restrictions, If.any:
4 4
This Month Yr.-to-Date Cuaulative.
!! Hours la Reperting Period 720.0 4343.0-60192.0
- 12. Nueber Of Hours Reactor Was Critical 720.0 2908.2 45554.6
- 13. Reatter Reserve Shutdown Hours
--0--
--0--
--0--
- 14. Hours Generator On-Line-720.0 2260.9 44706.5
-I
- 15. Unit Reserve Shutdown Hours
--0--
--0--
--0--
- 16. Gross Thermal Energy Benerated (MWH) 2451666 9490022 142181968
- 17. Sress Electrical Energy Generated (MWH) 868596 3373502 50337477
- 18. Net Electrical Energy Benerated (MWH) 6254B9 3191408 47318734
- 19. Unit Service factor 100.0 65.9 74.3
- 20. Unit Availability Factor 100.0 65.9 74.3
- 21. Unit Capacity Facter (Using MDC het) 101.6 65.1 69.4
- 22. Unit Capacity Fatter (Using DER Net) 100.1 64.2 69.7 I
- 23. Unit Forced Detage Rate 0.0 0.0 10.4-
- 24. Shutdown Scheduled Dyer Next 6 Months (Type, Date, and Duration of Each):
NONE l
- 25. If Shut Dcun At End Of Peport Period. Estisated late of Startup:
- 26. Units In Test Status (Prior to Coenercial Dperation):
Foretast
. Achieved INiilAL CRITICAllif INITIAL ELECTRICITY COMMERCIAL OPERATION I
l 4
i n
'?
OPERATIN3 DATA REPORT DOCKET ND 50-414 UNIT Catamba 2 DATE July 15. 1993
'I COMPLETED BY R.A. Willians TELEFHONE 704-392-5346~
MONTH June,1993 C
AVERA5E DAILY POWER LEVEL If AVERAGE DAILY POWER LEVEL 3
(MWe-Neti (MWe-Net) e 1
!!56 17 1149 2
1157 IB 1146 3
1150 19 1149 4
1146 20
!!47 I
5 1142 21
!!44 6
1136 22 1144 7
1149 23 1146
)
l 9
1141 24 1143 9
1141 25 1151 1
1 10 1142 26 1146 1
1 11 1145 27
!!42 12
!!41 28 1156 l
13
!!44 29 1146 14
!!49 30 1146 15 1152 16 1149
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-414 UNIT NAME CATAwuA z DATE v //1d/ 93 REPORT MONTH June 1993 COMPLETED BY N.
C.
s1MMund TELEPHONE
(/usJ-Juz-dzo; (1)
- 2) g_
(4)
(5)
E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS ~
N R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S
(1)
(2)
(3)
(4)
F Forced Peason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Entry Sheets For Licensee.
Event Report (LER C-Refueling 3-Automatic Scram (NUREG-Ol61))
D-Regulato W Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)
G-Operator Error'(Explain)
Exhibit I - Same Source H-Other (Explain)
.m.
]
'l MONTHLY REFUELING INFORMATION REOUEST 1.
Facility name: Catawba, Unit 2
.I 2.
Scheduled next refueling shutdown: May 1994 3.
Scheduled restart following-refueling: July 1994 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.
CHANGE OR LICENSE AMENDMENT.
THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO IDNGER BE MAINTAINED' IN THIS REPORT.
)
4.
Will refueling or resumption of operation thereafter require a I
technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and I
supporting information.
6.
Important licensing considerations (new or different design or i
- supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
1 7.
Number of Fuel assemblies (a) in the core: 19)_
(b) in'the spent fuel pool: 356 8.
Present licensed fuel pool capacity: 1418 Size of requested or planned increase:
9.
Projected ' date of last refueling which can be accommodated by present licensed capacity: September 2011 DUKE POWER COMPANY DATE:
July 15, 1993 Name of
Contact:
N.
C.
Simmorts Phone:
704-382-5263 _
1
~
4 DOCKET: 50-414 UNIT: Catawba 2 Date: 07/15/93 NARRATIVE
SUMMARY
MONTH: June 1993 Catawba Unit 2 began the month of June operating at 100% power. The unit operated at or near 100%
power for the entire month.
)
1 l
Prepared by N. C. Simmons Telephone: 704 382-5263
4 CATAWBA NUCLEAR STATION
'i i
?
MONTHLY OPERATING STATUS REPORT May 1993 J
1.
Personnel Exposure -
The total station liquid release for May..has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.'
The total station gaseous release for May has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
i 4
1
~,
..