Monthly Operating Repts for June 1993 for Jm Farley Nuclear Plant,Units 1 & 2
ML20045H208
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/30/1993
From: Hill R, Woodard J
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9307190222
Download: ML20045H208 (10)


Text

Southern Nuclear Oporating Company Post Of5co Box 1295 Birmingham, Alabama 35201 Telephone (205) 868-5086 m

Southern Nudear Operating Company

a. o. wooo.,e Executae Vice President July 13, 1993 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Joseph M. Farley Nuclear Plant Monthlv Operating Data Reoort Gentlemen:

Attached are the June 1993 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted, h(-

wkM (J.

Woodard x

FMJ:scj(mor.let)

Attachments cc:

Mr. S. D. Ebneter Mr. T.A. Reed Mr. G. F. Maxwell l

1) p I

9307190222 930630

)g&

il l

ADOCKOSOOg8 DR

bc: Mr. J. D. Woodard Mr. R. D. Hill (G9.03 & A4.05)

Mr. J. R. Derieux Mr. J. M. Elliott Mr. D. J. Shelton Mr. R. G. Cocherell i

Mr. O. Batum Mr. C. L. Whatley Mr. D. W. Glass Mr. R. E. Huffman Mr. Clem Eicheldinger Mr. M. G. McCorkle Mr. John Hoffman Mr. Russ Dedrickson Mr. Fred Yost Mr. F. M. Jessup, lil INPO Records Center ANI Library Commitment Tracking System (2 copies)

File: A2.1 Document Control (1 copy) i i

OPERATING DATA REPORT DOCKET NO.

50-348 DATE July 6.1993 COMPLETED 8Y R. D. Hill TELEPHONE (205) 899-5156 OPERATING STATUS

1. Unit Name:

Joseph M. Farley - Unit 1 Notes

2. Reporting Period:

June 1993

1) Cumulative data since
3. Licensed Thermal Power (MWt):

2.652 12-1-77, date of

4. Nameplate Rating (Gross MWe):

860 commercial operation.

5. Design Electrical Rating (Net MWe):

829

6. Maximum Dependable Capacity (Gross MWe):

855.7 7 Maximum Dependable Capacity (Net MWe):

812.0

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons for Restrictions, If Any:

N/A This Month Yr-to-Date Cumulative

11. Hours in Reporting Period 720.0 4.343.0 136.583.0
12. Number Of Hours Reactor Was Critical 720.0 4.125.6 107.246.9
13. Reactor Reserve Shutdown Hours 0.0 0.0 3.650.0
14. Hours Generator On-Line 720.0 4.105.9 105.489.6 15 Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1.908.087.5 10.782.521,8 270.783.597.6
17. Gross Electrical Energy Generated (MWH) 610.304.0 3.483.870.0 87.250.672.0
18. Net Electrical Energy Generated (MWH) 579.186 0 3.300.294.0 82.366.544.0 t
19. Unit Service Factor 100.0 94.5 77.2
20. Unit Availability Factor 100.0 94.5 77.2
21. Unit Capacity Factor (Using MDC Net) 99.1 93.6 74.0
22. Unit Capacity Factor (Using DER Net) 97.0 91.7 72.7
23. Unit Forced Outage Rate 0.0 5.5 6.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 08/06/77 08/09.L77 INITIAL ELECTRICITY 08/20/77 08/18/77 i

COMMERCIAL OPERATION 12/01/77 12/01/77 1

DATARPT.01

DOCKET NO.

50-348 UNIT.

1 DATE Julv 6'.1993 COMPLETED BY R. D. Hill TELEPHONE (205) 899-5156

-l MONTH June DAY AVERAGE DAILY POWER LEVEL DAY A'IERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 808 17 808 2

811 18 807 3

808 19 808 4

805 20 807 5

802 21 805 L

6 785 22 806-7 803 23 806 8

805 24 804-9 805 25 805 10 805 26 804 11 804 27 804 12 805 28 803 13 804 29 800 14 806 30 801 15 806 31 N/A 16 805 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

s AVGDLY.PWR

l JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS June 1993 There were no unit shutdowns or major power reductions during the month of June.

The following major safety related maintenance was performed during the month:

1.

Performed miscellaneous corrective and preventive maintenance on the diesel generators.

2.

Replaced the 1A component cooling water pump motor.

3.

Cleaned and inspected the component cooling water heat exchangers lA and IB.

1

1 i

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO, 50-348 UNIT NAME J. M. Fartev - Unit 1 DATE July 6.1993 COMPLETED BY R. D. Hill REPORT MONTH: June TELEPHONE (205) 8 % 5156 METHOD OF LICENSEE CAUSE & CORRECTIVE DURATION SHUTTING EVENT SYSTEM COMPONENT ACTION TO NO.

DATE TYPE' (HOURS)

REASON' DOWN REACTOR' REPORT #

CODE

  • CODE
  • PREVENT RECURRENCE There were no unit shutdowns or major power reductions during the month of June.

?

I i

t "i

i.

.i 1:.

2:

3:

4:

5:

F: Forced Reason:

Method:

Exhibit G-Instructions for Exhibit 6 - Same Source S. Scheduled A - Equipment Failure (Explain) 1 - Manual Preparations for Data Entry B - Maintenance or Test 2 - Manual Scram.

. Sheets for Licensee Event C - Refueling 3 - Automatic Scram.

. Report (LER) File (NUREG-0161)

D - Regulatory Restriction 4 - Othy (Explain)

E - Operator Training & Licensing Examination F-Administrative G - Operational Error (Explain) l H - Other (Explain)

I I

I'

. 2

.c.

~

OPERATING DATA REPORT DOCKET NO.

50-364 DATE July 6. 1993 COMPLETED BY R. D. Hill TELEPHONE (2051 899-5156 OPERATING STATUS

1. Unit Name:

Joseph M. Farley - Unit 2 Notes

2. Reporting Period:

June 1993

1) Cumulative data since
3. Licensed Thermal Power (MWt):

2.652 7-30-81, date of

4. Nameplate Rating (Gross MWe):

860 commercial operation

5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe):

863.6 7 Maximum Dependable Capacity (Net MWe):

822.0

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any:_

N/A This Month Yr-to-Date Cumulative

11. Hours In Reporting Period 720.0 4.343.0 104.496.0
12. Number Of Hours Reactor Was Critical 720.0 4.284 0 90.305u9 t
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On-Line 720.0 4.089.0 89.005.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1.889.226.5 10.607.649.4 227.138.597.P.
17. Gross Electrical Energy Generated (MWH) 612.473.0 3.475.051.0 74.487.229.Q
18. Net Electrical Energy Generated (MWH) 582.609.0 3.300.751.0 70.639.949.0
19. Unit Service Factor 100.0 94.2 85.2
20. Unit Availability Factor 100.0 94.2 85.2
21. Unit Capacity Factor (Using MDC Net) 98.4 92.5 82.5-
22. Unit Capacity Factor (Using DER Net) 97.6 91.7 81.5-
23. Unit Forced Outage Rate 0.0 5.8 3.8
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refuelino/ Maintenance Outaue September 24. 1993 ADoroximately 60 days

25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIlit ELECTRICITY 05/24/81 05/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81 l

DATARPT.U2

s-DOCKET N0.

50-360 UNIT 2

DATE July 6. 1993-COMPLETED BY R. D. Hill TELEPHONE (2051 899-5156 MONTH June DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) i 1

813 17 811 2

816 18 810 3

812 19 811 4

809 20 811 5

806 21 809 6

806 22 812 7

807 23 810 8

810 24 806 9

810 25 809 10 810 26 809 11 809 27 809 12 803 28 809 13 802 29 806 14 810 30 808 15 810 31 N/A 16 808 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each.

day in the reporting. month.

Compute to the nearest whole megawatt.

i AVGDLY.PWR.

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS June 1993 There were no unit shutdowns or major power reductions during the month of June.

I The following major safety-related maintenance was performed during the month:

1.

Miscellaneous corrective and preventive maintenance was performed on the diesel generators.

2.

Performed corrective and preventive maintenance and modification to the service water system.

In particular, the service water minimum flow A0V's were converted from fail-open to fail-close.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. -

50-364 UNIT NAME J. M. Fartw - Unit 2 DATE Jufv 6.1993 COMPLETED BY R. D. Hill REPORT MONTH: June TELEPHONE (205) B99-5156 METHOD OF UCENSEE CAUSE & CORRECTIVE i

DURATION SHUTTING EVENT SYSTEM COMPONENT ACTION TO NO.

DATE TYPE' (HOURS)

REASON' DOWN REACTOR' REPORT #

CODE

  • CODE
  • PREVENT RECURRENCE t

There were no unit shutdowns or major power reductions during the month of June.

e I

t i

F 5

i 1:

2:

3:

4:

5:

F: Forced Reason:

Method:

Ext.ibit G-instructions for Exhibit 1 - Same Source S: Scheduled A - Equipment Failure (Splain) 1 - Manual Preparations for Data Entry B - Maintenance or Test 2 - Manual Scram.

Sheets for Ucensee Event C - Refueling 3 - Automatic Scram.

Report (LER) File (NUREG4161)

D - Regulatory Restriction 4 - Other (Explain)

E - Operator Training & Ucensing Examination F-Administrative G - Operational Error (Explain)

H - Other (Explain)

....... ~,

. -....~. -..,... -.

.. -,.. _ _ _ _ _. _ _ _ _ _ - _ _ - _ _.