ML20045H203

From kanterella
Jump to navigation Jump to search
Notification of 930715 Meeting w/ABB-C-E in Windsor,Ct to Discuss Status of Certification Review of Sys 80+
ML20045H203
Person / Time
Site: 05200002
Issue date: 07/08/1993
From: Wambach T
Office of Nuclear Reactor Regulation
To: Miraglia F, Murley T, Russell W
NRC
References
NUDOCS 9307190213
Download: ML20045H203 (4)


Text

_

htlc.n. ] t>?^ L t

UNITED STATES fe j

NUCLEAR REGULATORY COMMISSION L 1

  • j

(g WASHINGTON, D.C. 205 % 0001 f

\\

?

July 8, 1993 Docket No.52-002 MEMORANDUM FOR:

T. Murley G. Lainas R. Zimmerman F. Miraglia J. Roe B. Boger W. Russell J. Zwolinski R. Gallo J. Partlow E. Adensam F. Congel D. Crutchfield B. Grimes E. Butcher W. Travers J. Wiggins W. Bateman, ED0 A. Gody B. D. Liaw A. Vietti-Cook S. Varga A. Thadani Operations Center J. Calvo M. Virgilio C. Rossi

~ ~

~~

THRU:

R. W. Borchardt, Acting Director Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation FROM:

Thomas V. Wambach, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation

SUBJECT:

DAILY HIGHLIGHT - FORTHCOMING SENIOR MANAGEMENT MEETING WITH ABB-COMBUSTION ENGINEERING (ABB-CE) AND THE U.S. DEPARTMENT OF ENERGY (DOE)

DATE & TIME:

July 15, 1993 (9 a.m. - 5 p.m.)

LOCATION:

ABB-Combustion Engineering, Inc.

1000 Prospect Hill Road Windsor, Connecticut 06095-0500 PURPOSI For management to discuss the status of the certification review of the System B0+.

An agenda is enclosed.

gh h

9307190213 93070B k

PDR ADOCK 05200002 st A

PDR

~d July 8, 1993 PARTICIPANTS *:

NRC ABB-CE DOE-T. Murley R. Newman S. Franks W. Russell R. Matzie P. Lang D. Crutchfield C. Brinkman K. Mali R. Borchardt J. Longo T. Essig S. Ritterbusch A. Thadani F. Carpentino B. Liaw B. Boger T. Wambach M. Franovich S. Magruder (Original signed by)

Thomas V. Wambach, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation

Enclosure:

i Meeting Agenda cc w/ enclosure:

See next page

  • Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reaister 28058, 6/28/78. Members of the public who wish to_ attend should contact me at -(301). 504-1103.

DISTRIBUTION:

Docket File PDST R/F SBajwa, 12G18 TEssig PDR JNWilson TVWambach RBorchardt l

TBoyce.

MXFranovich PShea OPA EJordan, MNBB 3701 GGrant, ED0 ACRS (11)

GBagchi, 7H15 NRR Mailroom,12G18 P0' Dell, PTSB JMoore, 15B18 RPerch, 8D1 MPratt, 7E4 SMagruder

)

i 0FC:

LA:PDST:ADAR PM: PDST: AD.yv/

SC:PDST.ADAR AR fj ms NAME: PShea g./

TVWIdbach$fz TEssig I 07/[/93 07/[/93 07/ 4 /93 DATE:

0FFICIAL DOCUMENT COPY: CM0715.TVW

)

ABB-Combustion Engineering, Inc.

Docket No.52-002 cc:

Mr. C. B. Brinkman, Acting Director Nuclear Systems Licensing ABB-Combustion Engineering, Inc.

1000 Prospect Hill Road Windsor, Connecticut 06095-0500 Mr. C. B. Brinkman, Manager Washington Nuclear Operations ABB-Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. Stan Ritterbusch Nuclear Licensing ABB-Combustion Engineering 1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500 Mr. Sterling Franks U.S. Department of Energy NE-42 Washington, D.C.

20585 Mr. Steve Goldberg Budget Examiner 725 17th Street, N.W.

Washington, D.C.

20503 Mr. Raymond Ng 1776 Eye Street, N.W.

Suite 300 Washington, D.C.

20006 Joseph R. Egan, Esquire Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.

Washington, D.C.

20037-1128 Mr. Regis A. Matzie, Vice President Nuclear Systems Development ABB-Combustion Engineering, Inc.

1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500 I

k

f y

SENIOR MANAGEMENT MEETING BETWEEN NRC, DOE, AND ABB-CE THURSDAY, July 15, 1993 AGENDA 9 a.m.

NRC Opening Statement DOE Opening Statement ABB-CE Opening Statement 9:30 a.m.

Technical Issues

~

~

2 p.m.

Project Issues 3:30 p.m.

Action Items Resulting from Meeting l

Enclosure i

i I

.,