Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NG-93-2800, Responds to Request for Addl Info Re Response to GL 92-01, Rev 1, Reactor Vessel Structural Integrity + (14:59:48, 19 December 2024)
- ML20046B919 + (14:59:51, 19 December 2024)
- ML20046B918 + (14:59:52, 19 December 2024)
- IR 05000353/1993012 + (14:59:54, 19 December 2024)
- ML20046B916 + (14:59:55, 19 December 2024)
- IR 05000373/1993013 + (14:59:56, 19 December 2024)
- ML20046B914 + (14:59:57, 19 December 2024)
- B14563, Proposed Tech Specs Increasing Volume Requirements of Boric Acid Storage Sys of TS 3.1.2.6 in Order to Meet Requirements of Redesigned Core for Cycle 5 Operation + (14:59:59, 19 December 2024)
- ML20046B909 + (15:00:02, 19 December 2024)
- IR 05000293/1993013 + (15:00:07, 19 December 2024)
- ML20046B904 + (15:00:11, 19 December 2024)
- RBG-38809, Responds to NRC Bulletin 93-003, Resolution of Issues Re Vessel Water Level Instrumentation in BWR, & GL-92-04, Resolution of Issues...Per 10CFR50.54(f). Lists Completed Actions + (15:00:12, 19 December 2024)
- 0CAN079312, Informs That Executive Vice President & Chief Operating Officer Positions Have Been Filled by H Keiser + (15:00:14, 19 December 2024)
- 05000458/LER-1993-013, :on 930629,high Pressure Core Spray Pump Failed to Start & Run During Surveillance Test Due to Failed Overfrequency Relay.Relay Tested & Installed in Switchgear + (15:00:17, 19 December 2024)
- 05000443/LER-1993-011, :on 921219,930209 & 0415,SW Pumps SW-P-41B, SW-P-41B & SW-P-41D Declared Inoperable,Respectively Due High Vibration.Caused by Excessive Abrasive Particles in Ocean Water.Pumps Replaced + (15:00:19, 19 December 2024)
- 05000443/LER-1993-008, :on 930518,determined That Control Air Not Analyzed to Function During Seismic Event Due to Lack of Understanding Significance of Control Air Availability for Long Term DG Operation.Ufsar Will Be Updated + (15:00:21, 19 December 2024)
- ML20046B890 + (15:00:23, 19 December 2024)
- TAC:M51073 + (15:00:27, 19 December 2024)
- ML20046B889 + (15:00:28, 19 December 2024)
- ML20046B888 + (15:00:29, 19 December 2024)
- ML20046B884 + (15:00:30, 19 December 2024)
- ML20046B878 + (15:00:31, 19 December 2024)
- ML20046B875 + (15:00:33, 19 December 2024)
- ML20046B874 + (15:00:34, 19 December 2024)
- ML20046B873 + (15:00:35, 19 December 2024)
- ML20046B872 + (15:00:36, 19 December 2024)
- ML20046B869 + (15:00:37, 19 December 2024)
- ML20046B871 + (15:00:37, 19 December 2024)
- ML20046B867 + (15:00:38, 19 December 2024)
- ML20046B866 + (15:00:39, 19 December 2024)
- ML20046B865 + (15:00:40, 19 December 2024)
- ML20046B864 + (15:00:41, 19 December 2024)
- ML20046B863 + (15:00:42, 19 December 2024)
- ML20046B862 + (15:00:43, 19 December 2024)
- ML20046B861 + (15:00:44, 19 December 2024)
- ML20046B860 + (15:00:45, 19 December 2024)
- ML20046B859 + (15:00:46, 19 December 2024)
- ML20046B858 + (15:00:46, 19 December 2024)
- ML20046B857 + (15:00:47, 19 December 2024)
- ML20046B856 + (15:00:48, 19 December 2024)
- ML20046B855 + (15:00:50, 19 December 2024)
- ML20046B854 + (15:00:52, 19 December 2024)
- ML20046B853 + (15:00:53, 19 December 2024)
- ML20046B852 + (15:00:55, 19 December 2024)
- ML20046B851 + (15:00:58, 19 December 2024)
- 05000327/LER-1993-018, :on 930704,DG Started Due to Improper WO Planning.Restored Power to 1BB Shutdown Board & Stopped Running DGs + (15:01:00, 19 December 2024)
- ML20046B849 + (15:01:02, 19 December 2024)
- ML20046B848 + (15:01:04, 19 December 2024)
- ML20046B847 + (15:01:05, 19 December 2024)
- B14556, Responds to Staff 930401 Rai,Requesting Util Review Instrumentation Against Criteria of NEDO-31558 to Determine If Alternative Criteria Met + (15:01:10, 19 December 2024)
- ML20046B844 + (15:01:12, 19 December 2024)
- ML20046B842 + (15:01:12, 19 December 2024)