Forwards Insp Rept 50-293/93-13 on 930608-0712.Non-cited Violation Noted
ML20046B904
Person / Time
Site: Pilgrim
Issue date: 07/30/1993
From: Linville J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Boulette E
BOSTON EDISON CO.
Shared Package
ML20046B905 List:
References
NUDOCS 9308090007
Download: ML20046B904 (6)


See also: IR 05000293/1993013

Text

1

J

-

1

JUL 301993

'

'

'

u

,

l

Docket No. 50-293

Mr. E. Thomas Boulette, PhD

-'

Senior Vice President - Nuclear

Boston Edison Company

j

Pilgrim Nuclear Power Station

Rocky Hill Road

i

Plymouth, Massachusetts 02360

Dear Mr. Boulette:

SUBJECT: PILGRIM INSPECTION 93-13

This refers to the safety inspection conducted by Messrs. J. Macdonald, A. Cerne, and D. Kern,

of this office on June 8,1993 to July 12,1993 at the Pilgrim Nuclear Power Station, Plymouth,

Massachusetts. Areas relevant to the health and safety of t'.e public examined during this

inspection are ocscribed in the enclosed report. Our findings were based upon observations of

performance and independent evaluations of safety systems and quality records. The preliminary

results have been discussed with Mr. L. Schmeling and other members of your staff at the

conclusion of the inspection.

Overall, safe plant operations and good attention to detail were observed by our inspectors.

Prompt and appropriate operator response to the June 23,1993 unanticipated single control rod

!

insertion was noted.

However, inspector followup to this event identified evidence of

programmatic weakness in the implementation of the preventive maintenance deferral process.

Specifically, it appears that many preventive maintenance activities originally scheduled for

implementation during the recent refueling outage were deferred by outage management without

~

completion of all required technical impact reviews. Your attention to this matter to ensure all

improperly deferred activities are promptly identified and properly evaluated consistent with your

station procedures is warranted.

,

On May 4,1993 you submitted a Licensee Event Report documenting a violation of technical

l

specification smveillance requirements for the Control Room High Efficiency Air Filtration

System. As discussed in the enclosed report, the successful completion of subsequent testing

established system operability during the period of time covered by the lapsed surveillance

activity. It is noted that this problem was discovered by your Quality Assurance Department

during the conduct of an audit. Such identification of the omitted surveillance test, along with

the corrective measures directed toward both procedural and supervisory review enhancements,

provides evidence of an active quality verification program and the proper safety perspective of

your corrective actions. Consequently, in accordance with NRC policy on the exercise of

discretion for enforcement sanctions, this violation is not being cited.

!

9308090007 930730

,

PDR

ADOCK 05000293

G

PDR

,

l

-

-

.

-

1

i

JUL 3 01993

i

..

!

2

!

l

No reply to this report is necessary, and your cooperation with us is appreciated.

!,

Sincerely,

i

t

>

,

I

James Linville, Chief

Projects Branch No. 3

Division of Reactor Projects

'

i

Enclosure:

-- ;

1.

NRC Inspection Report No. 93-13

1

,

b

P

1

>

1

!

i

e

i

L

.

>

L

,

-

-. -

. -

_ - _ .

-__..

.

_.

..

_

'

,

'

JUL 3 01993

'

l

.

t

3

.

cc w/ encl:

E. Kraft, Vice President, Nuclear Operations and Station Director

L. Schmeling, Plant Manager

V. Oheim, Manager, Regulatory Affairs and Emergency Planning Department

D. Tarantino, Nuclear Information Manager

N. Desmond, Complimce Division Manager

R. Hallisey, Department of Public Health, Commonwealth of Massachusetts

R. Adams, Department of Labor and Industries, Commonwealth of Massachusetts

The Honorable. Edward M. Kennedy

'!

The Honorable John F. Kerry

,

'

The Honorable Edward J. Markey

The Honorable Terese Murray

The Honorable Peter V. Forman

,

B. Abbanat, Department of Public Utilities

l

Chairman, Plymouth Board of Selectmen

Chairman, Duxbury Board of Selectmen

Plymouth Civil Defense Director

,

Paul W. Gromer, Massachusetts Secretary of Energy Resources

Sarah Woodhouse, Legislative Assistant

A. Nogee, MASSPIRG

Regional Administrator, FEMA

Office of the Commissioner, Massachusetts Department of Environmental Quality

Engineering

l

Office of the Attorney General, Commonwealth of Massachusetts

l

T. Rapone, Massachusetts Executive Office of Public Safety

-;

Chairman, Citizens Urging Responsible Energy

l

'

Public Document Room (PDR)

i

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

i

K. Abraham, PAO (2) All Inspection Reports

NRC Resident Inspector

Commonwealth of Massachusetts, SLO Designee

bec w/ encl:

Region I Docket Room (with concurrences)

!

.:

1

9

1

1

I

_.

.-

.

.

-.

.,.

..

JUL 3 01993

'

.

.

3

cc w/ encl:

E. Kraft, Vice President, Nuclear Operations and Station Director

L. Schmeling, Plant Manager

V. Oheim, Manager, Regulatory Affairs and Emergency Planning Department

'

D. Tarantino, Nuclear Information Manager

N. Desmond, Compliance Division Manager

'

R. Hallisey, Department of Public Health, Commonwealth of Massachusetts

R. Adams, Department of Labor and Industries, Commonwealth of Massachusetts

The Honorable Edward M. Kennedy

The Honorable John F. Kerry

The Honorable Edward J. Markey

The Honorable Terese Murray

The Honorable Peter V. Forman

B. Abbanat, Department of Public Utilities

Chairman, Plymouth Board of Selectmen

Chairman, Duxbury Board of Selectmen

Plymouth Civil Defense Director

Paul W. Gromer, Massachusetts Secretary of Energy Resources

Sarah Woodhouse, Legislative Assistant

A. Nogee, MASSPIRG

i

Regional Administrator, FEMA

Office of the Commissioner, Massachusetts Department of Environmental Quality

i

Engineering

Office of the Attorney General, Commonwealth of Massachusetts

'

T. Rapone, Massachusetts Executive Office of Public Safety

Chairman, Citizens Urging Responsible Energy

Public Document Room (PDR)

,

'

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

l

K. Abraham, PAO (2) All Inspection Reports

NRC Resident Inspector

Commonwealth of Massachusetts, SLO Designee

j

i

,

i

_

. _. .-

.

__.

_ __

_ _ _ -

.

JUL 3 01993

-

.

,

t

.

j!

4

bec w/ encl:

l

Region I Docket Room (with concurrences)

bec w/enci (VIA F, MAIL):

W. Butler, NRR

R. Eaton, NRR

!

V. McCree, OEDO

j

d

!

i

i

k

i

!

F

i

,

.

!

RI:DRP*

RI:DRP*

RI:DRP*

'

Jmacdonald

Ekelly

J1inville

'

/ /93

/ /93

/ /93

  • SEE PREVIOUS CONCURRENCE

j

OFFICIAL RECORD COPY

A:93-13.TXT

)

i

i

r

e

.

.

-

-

-

-, -

.

._.

t

.

,

,

JUL 3 01993

.

4

bec w/ encl (VIA FeMAIL):

W. Butler, NRR

R. Eaton, NRR

V. McCree, OEDO

l

,

!

.,

e

%

RI:DRP

Ell

P

RI:DRP

ac nald

11M y /

J

a / 7/93

1 d/93

75e/93

OFFICIAL RECORD COPY

A:93-13.TXT

1

}

i

.

.

-

m

-

, r