Text
1
J
-
1
JUL 301993
'
'
'
u
,
l
Docket No. 50-293
Mr. E. Thomas Boulette, PhD
-'
Senior Vice President - Nuclear
Boston Edison Company
j
Pilgrim Nuclear Power Station
Rocky Hill Road
i
Plymouth, Massachusetts 02360
Dear Mr. Boulette:
SUBJECT: PILGRIM INSPECTION 93-13
This refers to the safety inspection conducted by Messrs. J. Macdonald, A. Cerne, and D. Kern,
of this office on June 8,1993 to July 12,1993 at the Pilgrim Nuclear Power Station, Plymouth,
Massachusetts. Areas relevant to the health and safety of t'.e public examined during this
inspection are ocscribed in the enclosed report. Our findings were based upon observations of
performance and independent evaluations of safety systems and quality records. The preliminary
results have been discussed with Mr. L. Schmeling and other members of your staff at the
conclusion of the inspection.
Overall, safe plant operations and good attention to detail were observed by our inspectors.
Prompt and appropriate operator response to the June 23,1993 unanticipated single control rod
!
insertion was noted.
However, inspector followup to this event identified evidence of
programmatic weakness in the implementation of the preventive maintenance deferral process.
Specifically, it appears that many preventive maintenance activities originally scheduled for
implementation during the recent refueling outage were deferred by outage management without
~
completion of all required technical impact reviews. Your attention to this matter to ensure all
improperly deferred activities are promptly identified and properly evaluated consistent with your
station procedures is warranted.
,
On May 4,1993 you submitted a Licensee Event Report documenting a violation of technical
l
specification smveillance requirements for the Control Room High Efficiency Air Filtration
System. As discussed in the enclosed report, the successful completion of subsequent testing
established system operability during the period of time covered by the lapsed surveillance
activity. It is noted that this problem was discovered by your Quality Assurance Department
during the conduct of an audit. Such identification of the omitted surveillance test, along with
the corrective measures directed toward both procedural and supervisory review enhancements,
provides evidence of an active quality verification program and the proper safety perspective of
your corrective actions. Consequently, in accordance with NRC policy on the exercise of
discretion for enforcement sanctions, this violation is not being cited.
!
9308090007 930730
,
ADOCK 05000293
G
,
l
-
-
.
-
1
i
JUL 3 01993
i
..
!
2
!
l
No reply to this report is necessary, and your cooperation with us is appreciated.
!,
Sincerely,
i
t
>
,
I
James Linville, Chief
Projects Branch No. 3
Division of Reactor Projects
'
i
Enclosure:
-- ;
1.
NRC Inspection Report No. 93-13
1
,
b
P
1
>
1
!
i
e
i
L
.
>
L
,
-
-. -
. -
_ - _ .
-__..
.
_.
..
_
'
,
'
JUL 3 01993
'
l
- .
t
3
.
cc w/ encl:
E. Kraft, Vice President, Nuclear Operations and Station Director
L. Schmeling, Plant Manager
V. Oheim, Manager, Regulatory Affairs and Emergency Planning Department
D. Tarantino, Nuclear Information Manager
N. Desmond, Complimce Division Manager
R. Hallisey, Department of Public Health, Commonwealth of Massachusetts
R. Adams, Department of Labor and Industries, Commonwealth of Massachusetts
The Honorable. Edward M. Kennedy
'!
The Honorable John F. Kerry
,
'
The Honorable Edward J. Markey
The Honorable Terese Murray
The Honorable Peter V. Forman
,
B. Abbanat, Department of Public Utilities
l
Chairman, Plymouth Board of Selectmen
Chairman, Duxbury Board of Selectmen
Plymouth Civil Defense Director
,
Paul W. Gromer, Massachusetts Secretary of Energy Resources
Sarah Woodhouse, Legislative Assistant
A. Nogee, MASSPIRG
Regional Administrator, FEMA
Office of the Commissioner, Massachusetts Department of Environmental Quality
Engineering
l
Office of the Attorney General, Commonwealth of Massachusetts
l
T. Rapone, Massachusetts Executive Office of Public Safety
-;
Chairman, Citizens Urging Responsible Energy
l
'
Public Document Room (PDR)
i
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
i
K. Abraham, PAO (2) All Inspection Reports
NRC Resident Inspector
Commonwealth of Massachusetts, SLO Designee
bec w/ encl:
Region I Docket Room (with concurrences)
!
.:
1
9
1
1
I
_.
.-
.
.
-.
.,.
..
JUL 3 01993
'
.
.
3
cc w/ encl:
E. Kraft, Vice President, Nuclear Operations and Station Director
L. Schmeling, Plant Manager
V. Oheim, Manager, Regulatory Affairs and Emergency Planning Department
'
D. Tarantino, Nuclear Information Manager
N. Desmond, Compliance Division Manager
'
R. Hallisey, Department of Public Health, Commonwealth of Massachusetts
R. Adams, Department of Labor and Industries, Commonwealth of Massachusetts
The Honorable Edward M. Kennedy
The Honorable John F. Kerry
The Honorable Edward J. Markey
The Honorable Terese Murray
The Honorable Peter V. Forman
B. Abbanat, Department of Public Utilities
Chairman, Plymouth Board of Selectmen
Chairman, Duxbury Board of Selectmen
Plymouth Civil Defense Director
Paul W. Gromer, Massachusetts Secretary of Energy Resources
Sarah Woodhouse, Legislative Assistant
A. Nogee, MASSPIRG
i
Regional Administrator, FEMA
Office of the Commissioner, Massachusetts Department of Environmental Quality
i
Engineering
Office of the Attorney General, Commonwealth of Massachusetts
'
T. Rapone, Massachusetts Executive Office of Public Safety
Chairman, Citizens Urging Responsible Energy
Public Document Room (PDR)
,
'
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
l
K. Abraham, PAO (2) All Inspection Reports
NRC Resident Inspector
Commonwealth of Massachusetts, SLO Designee
j
i
,
i
_
. _. .-
.
__.
_ __
_ _ _ -
.
JUL 3 01993
-
.
,
t
.
j!
4
bec w/ encl:
l
Region I Docket Room (with concurrences)
bec w/enci (VIA F, MAIL):
W. Butler, NRR
R. Eaton, NRR
!
V. McCree, OEDO
j
d
!
i
i
k
i
!
F
i
,
.
!
RI:DRP*
RI:DRP*
RI:DRP*
'
Jmacdonald
Ekelly
J1inville
'
/ /93
/ /93
/ /93
- SEE PREVIOUS CONCURRENCE
j
OFFICIAL RECORD COPY
A:93-13.TXT
)
i
i
r
e
.
.
-
-
-
-, -
.
._.
t
.
,
,
JUL 3 01993
.
4
bec w/ encl (VIA FeMAIL):
W. Butler, NRR
R. Eaton, NRR
V. McCree, OEDO
l
,
!
.,
e
%
RI:DRP
Ell
P
RI:DRP
ac nald
11M y /
J
a / 7/93
1 d/93
75e/93
OFFICIAL RECORD COPY
A:93-13.TXT