ML20046B862
| ML20046B862 | |
| Person / Time | |
|---|---|
| Site: | 05200002 |
| Issue date: | 08/03/1993 |
| From: | Wambach T Office of Nuclear Reactor Regulation |
| To: | Miraglia F, Murley T, Russell W NRC |
| References | |
| NUDOCS 9308060333 | |
| Download: ML20046B862 (3) | |
Text
. _
(N UGOg
.,1 4
UNITED STATES
+
'Lj NUCLEAR REGULATORY COMMISSION
'~ f WASHINGTON, D.C. 2055641001 8
August 3, 1993
\\.....,e Docket No.52-002 4;;.
MEMORANDUM FOR:
T. Murley G. Lainas R. Zimmerman F. Miraglia J. Roe B. Boger i
W. Russell J. Zwolinski C. Thomas J. Partlow E. Adensam F. Congel D. Crutchfield B.-Grimes E. Butcher W. Travers J. Wiggins W. Bateman, ED0 A. Gody B. D. Liaw A. Vietti-Cook S. Varga A. Thadani Operations Center-J. Calvo M. Virgilio C. Rossi THR'J :
R. W. Borchardt, Acting Director Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation FROM:
Thomas V. Wambach, Project Manager Standardization Project Directorate l
Associate Directorate for Advanced Reactors
~
and License Renewal Office of Nuclear Reactor Regulation l
SUBJECT:
DAILY HIGHLIGHT - FORTHCOMING MEETING WITH ABB-COMBUSTION ENGINEERING (ABB-CE) FOR SYSTEM 80+ (PROBABILISTIC RISK ASSESSMENT (PRA) ISSUES)
DATE & TIME:
August 9, 1993 (10 a.m. - 12 noon) i LOCATION:
U.S. Nuclear Regulatory Commission l
One White Flint North i
11555 Rockville Pike Rockville, Maryland 20852 Room 10-B-13 PURPOSE:
To discuss progress on issue closure for PRA (e.g., shutdown risk and seismic margin). To discuss PRA insights and Tier 1-and 2 information.
1
$5 $$$ W 9308060333 930803 DR -ADOCK 05200002 PDR
-. August 3, 1993 PARTICIPANTS *:
NRC ABB-CE T. Wambach S. Ritterbusch M. Franovich R. Weston A. El-Bassioni E. Siegman R. Palla R. Schneider N. Saltos original signed by: Stewart L. Magruder Thomas V. Wambach, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation cc: See next page i
- Meetings between the NRC technical staff and applicants.or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reaister 28058, 6/28/78.
Members of the public who wish to attend should contact me at (301) 504-1103.
DISTRIBUTION:
Docket File PDST R/F SBajwa, 12G18 TEssig PDR RBorchardt TVWambach TBoyce MXFranovich PShea OPA GBagchi, 7H15 EJordan, MNBB 3701 GGrant, EDO ACRS (11)
NSaltos, 10E4 NRR Mailroom, 12G18 P0' Dell, PTSB JMoore, 15818 RPerch, 801 MPratt, 7E4 SMagruder AEl-Bassioni, 10E4 0FC:
LA:PDST:ADAR PM:PDST:ADAR SC:PDST:ADAR A.
p NAME: PShe g TVWambMdItz TE[h fl
)
08/h3 08/ 3 /93 08h/93 DATE:
0FFICIAL DOCUMENT COPY:
CM0809.TVW l
i
1 o
'~
ABB-Combustion Engineering, Inc.
Docket No.52-002 cc:
Mr. C. B. Brinkman, Acting Director Nuclear Systems Licensing ABB-Combustion Engineering, Inc.
1000 Prospect Hill Road Windsor, Connecticut 06095-0500 Mr. C. B. Brinkman, Manager Washington Nuclear Operations ABB-Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 1
Mr. Stan Ritterbusch Nuclear Licensing ABB-Combustion Engineering 1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500 Mr. Sterling Franks U.S. Department of Energy NE-42 Washington, D.C.
20585
'~
Mr. Steve Goldberg Budget Examiner 725 17th Street, N.W.
Washington, D.C.
20503 Mr. Raymond Ng 1776 Eye Street, N.W.
Suite 300 Washington, D.C.
20006 Joseph R. Egan, Esquire Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.
Washington, D.C.
20037-1128 Mr. Regis A. Matzie, Vice President Nuclear Systems' Development ABB-Combustion Engineering, Inc.
1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500 1
J l
.