Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000324/LER-1982-078, Forwards LER 82-078/03L-0 + (10:04:43, 18 December 2024)
- 05000321/LER-1982-032, Forwards LER 82-032/03L-0 + (10:04:45, 18 December 2024)
- 05000338/LER-1982-022-03, /03L-0:on 820416 & 19,contents of Emergency Condensate Storage Tank Dropped Below Min Required Vol. Caused by Adding Water from Emergency Tank to Steam Generators Via Auxiliary Sys Following Reactor Trips + (10:04:47, 18 December 2024)
- ML20052H708 + (10:04:48, 18 December 2024)
- 05000324/LER-1982-074, Forwards LER 82-074/03L-0 + (10:04:49, 18 December 2024)
- 05000321/LER-1982-028-01, /01T-0:on 820424,primary Coolant Conductivity, Chlorides & Ph Found to Be Exceeding Tech Spec Limits. Cause Tentatively Attributed to Resin Intrusion & Other Impurities in Reactor Coolant.Investigation Continuing + (10:04:51, 18 December 2024)
- TAC:07716 + (10:04:52, 18 December 2024)
- ML20052H704 + (10:04:58, 18 December 2024)
- 05000321/LER-1982-033, Forwards LER 82-033/03L-0 + (10:05:02, 18 December 2024)
- ML20052H701 + (10:05:08, 18 December 2024)
- 05000338/LER-1982-022, Forwards LER 82-022/03L-0 + (10:05:10, 18 December 2024)
- ML20052H698 + (10:05:11, 18 December 2024)
- ML20052H696 + (10:05:17, 18 December 2024)
- 05000270/LER-1982-007-01, /01T-0:on 820428,during Final Reactor Bldg Insp, One Vertical Tendon in Secondary Shield Wall Was Found Broken.Caused by Stress Corrosion of post-tensioning Wires Near Stressing Washers Due to Water + (10:05:18, 18 December 2024)
- 05000321/LER-1982-028, Forwards LER 82-028/01T-0 + (10:05:20, 18 December 2024)
- ML20052H692 + (10:05:26, 18 December 2024)
- ML20052H691 + (10:05:27, 18 December 2024)
- 05000361/LER-1982-007, Ro:Submits Corrections to Equipment Tag Number Errors in LER 82-007 on 820407 + (10:05:28, 18 December 2024)
- 05000270/LER-1982-007, Forwards LER 82-007/01T-0.Detailed Event Analysis Encl + (10:05:31, 18 December 2024)
- 05000366/LER-1982-036-03, /03L-0:on 820414,while Loading Eight Fuel Bundles Around Source Range Monitors Prior to Cycle 3 Reload,Wrong Bundle Loaded.Caused by Personnel Error.Personnel Instructed in Proper Use of Coordinate Sys in Spent Fuel Pool + (10:05:35, 18 December 2024)
- ML20052H685 + (10:05:36, 18 December 2024)
- 05000302/LER-1982-031-03, /03L-0:on 820405,175-ft Wind Direction Channel Found Not Functioning Properly.Caused by Lost Vane & Instrument Drift.Vane Replaced & Instrument Recalibr + (10:05:37, 18 December 2024)
- PNO-II-82-051A, on 820420,degraded Tendons Discovered in Shield Wall.Jet Impingement Loads Concurrent W/Seismic Event Are Being Evaluated + (10:05:44, 18 December 2024)
- 05000366/LER-1982-036, Forwards LER 82-036/03L-0 + (10:05:46, 18 December 2024)
- ML20052H679 + (10:05:47, 18 December 2024)
- A02234, Offers No Comments on SEP Topics II-4 Re Geology & Seismology & II-4.B Concerning Proximity of Capable Tectonic Structures in Plant Vicinity.Topics Complete + (10:05:54, 18 December 2024)
- ML20052H675 + (10:05:56, 18 December 2024)
- 05000302/LER-1982-031, Forwards LER 82-031/03L-0 + (10:05:57, 18 December 2024)
- 05000327/LER-1982-053-03, /03L-0:on 820415,vital Battery Bank II Declared Inoperable When Cell 4 Connection Resistance Found Greater than 150 micro-ohms.Caused by Loose Bolt Connection.Bolt Torqued & Resistance Checked + (10:05:59, 18 December 2024)
- ML20052H670 + (10:06:01, 18 December 2024)
- ML20052H669 + (10:06:02, 18 December 2024)
- ML20052H667 + (10:06:03, 18 December 2024)
- 05000327/LER-1982-053, Forwards LER 82-053/03L-0 + (10:06:04, 18 December 2024)
- ML20052H664 + (10:06:11, 18 December 2024)
- ML20052H662 + (10:06:11, 18 December 2024)
- 05000296/LER-1982-015-03, /03L-0:on 820415,surveillance Functional Tests for Reactor Low Water Level SI4.1.A-7 & Pressure Suppression Chamber High Level SI4.2.B-27 Not Performed within Required 1-month Frequency.Scheduling Procedures Revised + (10:06:12, 18 December 2024)
- ML20052H660 + (10:06:16, 18 December 2024)
- 05000348/LER-1982-017-03, /03L-0:on 820413,FI-497 (Steam Generator 1C Feedwater Flow) Instrumentation Channel Declared Inoperable When Max Allowable Channel Check Error Was Exceeded.Caused by Faulty Transmitter Amplifier Card.Card Replaced + (10:06:18, 18 December 2024)
- ML20052H658 + (10:06:19, 18 December 2024)
- ML20052H657 + (10:06:25, 18 December 2024)
- 05000296/LER-1982-015, Forwards LER 82-015/03L-0 + (10:06:26, 18 December 2024)
- 05000348/LER-1982-015-03, /03L-0:on 820408,radiation Monitor 25A (Spent Fuel Storage Pool Area Gaseous activity-ventilation Sys Isolation) Declared Inoperable While Performing Test.Caused by Dirty Contacts on Mod Selector Switch.Contacts Cleaned + (10:06:28, 18 December 2024)
- ML20052H652 + (10:06:38, 18 December 2024)
- ML20052H651 + (10:06:38, 18 December 2024)
- ML20052H650 + (10:06:44, 18 December 2024)
- ML20052H648 + (10:06:45, 18 December 2024)
- ML20052H647 + (10:06:50, 18 December 2024)
- ML20052H646 + (10:07:00, 18 December 2024)
- AECM-82-192, Interim Deficiency Rept 2 Re Henry Pratt Butterfly Valves W/O Proper Angle Bracing in Standby Gas Treatment Sys, Initially Reported 820310.Mod to Raise Resonant Frequency of Valves to 33 Hz Completed.Also Reportable Per Part 21 + (10:07:06, 18 December 2024)
- ML20052H644 + (10:07:06, 18 December 2024)
- ML20052H642 + (10:07:08, 18 December 2024)