ML20052H657

From kanterella
Jump to navigation Jump to search
Testimony of E Lantz Re Oneill Contention II.E.3. Criticality in Undistorted Racks Will Not Exist as Long as Tech Spec Limit of 28.3 G U-235 Per Axial Centimeter of Fuel Assembly Installed in Racks Is Followed
ML20052H657
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 05/10/1982
From: Lantz E
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20052H638 List:
References
NUDOCS 8205210311
Download: ML20052H657 (10)


Text