ML20052H651

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Welding Deficiencies on Seismic I Hangers & Structural Steel,Initially Reported on 820402. Util Unable to Complete Evaluation Since Reinsp Not Completed.Also Reported Per Part 21
ML20052H651
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/30/1982
From: Chiangi N
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-82 10CFR-050.55E, 10CFR-50.55E, CQAD-82-773, NUDOCS 8205210306
Download: ML20052H651 (2)


Text

,

, - a.

Sp&L

~

u A r[NIRO p lpy..

1 Carolina Power & Light Company MiQ.y.

AU;q f

April 30, 1982 gg I'NY $

g y: 38 FILE SH N-2/18 CQAD 82-773 ITEM 77 Mr. James P. O'Reilly United States Nuclear Regulatory Conanission Region II 101 Marietta Street, Northwest Atlanta, Georgia 30303 i

SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 DOCKET NO. 50-400 WELDING DEFICIENCIES ON SEISMIC I HANGERS AND STRUCTURAL STEEL

Dear Mr. O'Reilly:

On April 2,1982, the NRC (Mr. C. Julian) was notified by Carolina Power &

Light Company (Mr. L. E. Jones) of an item considered potentially reportable per the provisions of 10CFR50.55(e) and 10CFR21. The NRC was informed that 1

certain Seismic I pipe hangers and structural steel supplied by Peden Steel, t

Raleigh, North Carolina, were found to have welding deficiencies.

The intent of this letter is to inform you that Carolina Power & Light Company has not been able to complete its evaluation concerning this matter since reinspections have not been completed to determine the scope of the problem.

j Due to the amount of reinspection involved, it is now anticipated that the completion of the reportability evaluation will be accomplished by December 15, 1982, at which time, the NRC will be informed of the results.

Completion of corrective action will depend on the results of the evaluations and extent of corrective action required. Once the item is deemed reportable, the NRC will be so notified, and the projected date of completion of corrective action and final report provided through submittal of an interim letter.

I 1

8205210306 820430 PDR ADOCK 05000400 I

OFFICI ALE 4)P.

S PDR

~

4 1 FayettevHie Street

  • P. O. Box 1551
  • Raleigh, N C. 27602 t

4 Q

e e

Mr. James P. O'Railly April 30, 1982 Thank you for your cooperation in this matter.

j Yours very truly,

,s

(

N. J. Chi gi - Manager Engineering Construction Quality Assuratnce/ Quality Control NJC/ges (206) cc:

Mr. G. Maxwell Mr. V. Stello (2) i J

I f