Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000328/LER-1982-047-03, /03L-0:on 820327,during SI-566,essential Raw Cooling Water Flow Verification Test,Flow Through Containment Spray Heat Exchanger 2B Discovered to Be 800 Gpm.Probable Cause Was Incorrect Procedure + (08:56:21, 18 December 2024)
- 05000324/LER-1982-062, Forwards LER 82-062/03L-0 + (08:56:23, 18 December 2024)
- 05000302/LER-1982-017-03, /03L-0:on 820307,reactor Bldg Pressure Indicator Fluctuated Between 10 & 20 Lb.Caused by Water in Junction Box & Flex Cable.Junction Box & Flex Cable Dried Out & Instrument Calibr & Sealed + (08:56:25, 18 December 2024)
- ML20053B979 + (08:56:26, 18 December 2024)
- 05000328/LER-1982-047, Forwards LER 82-047/03L-0 + (08:56:28, 18 December 2024)
- 05000302/LER-1982-017, Forwards LER 82-017/03L-0 + (08:56:30, 18 December 2024)
- ML20053B974 + (08:56:31, 18 December 2024)
- 05000302/LER-1982-015-03, /03L-0:on 820204,reactor Bldg Pressure Transmitter Isolation Valve V-1 Shut in Mode 5.Caused by Undocumented Valve Closing.Valve Opened + (08:56:33, 18 December 2024)
- ML20053B972 + (08:56:35, 18 December 2024)
- ML20053B970 + (08:56:36, 18 December 2024)
- ML20053B969 + (08:56:37, 18 December 2024)
- ML20053B968 + (08:56:38, 18 December 2024)
- ML20053B966 + (08:56:39, 18 December 2024)
- AECM-82-219, Forwards Responses/Clarifications Re Issues Discussed in Fsar,Addressing Revisions to FSAR Section 12.5.Incorporation of Revisions Will Be Made Pending Util & NRC Agreement on Procedures Required for post-OL FSAR Amends + (08:56:40, 18 December 2024)
- ML20053B964 + (08:56:42, 18 December 2024)
- 05000302/LER-1982-015, Forwards LER 82-015/03L-0 + (08:56:44, 18 December 2024)
- 05000361/LER-1982-012-03, /03L-0:on 820424,heater in Train B of Control Room Emergency Air Cleanup Sys Cycled on & Off.Caused by Erratic Functioning of Flow Control Switch & Pitot Tube. Switch Replaced & Pitot Tube Reoriented + (08:56:50, 18 December 2024)
- 05000302/LER-1982-019-03, /03L-0:on 820301,while Performing Housekeeping,Air Start Line to Number 5 Cylinder on Emergency Diesel Generator B Found Parted.Caused by Fatigue on Cylinder Air Start Line.Line Repaired + (08:56:52, 18 December 2024)
- 05000361/LER-1982-012, Forwards LER 82-012/03L-0.Detailed Event Analysis Submitted + (08:56:58, 18 December 2024)
- PLA-1102, Interim Deficiency Rept Re Capability of Ac Electric Distribution Sys to Support Two Unit Operation,Initially Reported 820420.Design Voltage Verification Tests Conducted. Final Rept in Sept 1982.Also Reported Per Part 21 + (08:56:59, 18 December 2024)
- IR 05000313/1982009 + (08:57:03, 18 December 2024)
- ML20053B952 + (08:57:04, 18 December 2024)
- ML20053B950 + (08:57:05, 18 December 2024)
- ML20053B948 + (08:57:06, 18 December 2024)
- 05000324/LER-1982-051-03, Primary Containment Atmospheric Hydrogen analyzer,2-CAC-AT-1263-1,indicated 0% to 1.8% Change in Hydrogen Concentration in Drywell.On 820325,3% Change Noted.Caused by Erratic Potentiometer + (08:57:08, 18 December 2024)
- 05000302/LER-1982-019, Forwards LER 82-019/03L-0 + (08:57:10, 18 December 2024)
- AECM-82-165, Final Deficiency Rept Re Nuts & Jam Nuts Not Threading Properly Onto Control Rod Drive Housing Lower Supports, Initially Reported 820205.Deficiency Determined Not Reportable.Ge Issued Rept to Cover Corrective Actions + (08:57:12, 18 December 2024)
- 05000324/LER-1982-051, Forwards Updated LER 82-051/03L-1 + (08:57:15, 18 December 2024)
- 05000325/LER-1982-047-03, During RHRSW Operability Test,Vibration of 3.2 Mils Measured for 1B RHRSW Pump.On 820420,during Suppression Cooling,Smoke Observed Emanating from Pump Bearing Housing + (08:57:18, 18 December 2024)
- ML20053B939 + (08:57:20, 18 December 2024)
- 05000325/LER-1982-047, Forwards Updated LER 82-047/03L-1 + (08:57:24, 18 December 2024)
- ML20053B931 + (08:57:29, 18 December 2024)
- L-82-205, Interim Deficiency Rept Re Potential Steam Generator 2A 1-inch Nozzle Malfunction,Initially Reported on 820217. Final Rept Will Be Submitted by 820617 + (08:57:30, 18 December 2024)
- 05000324/LER-1982-063-03, /03L-0:on 820326,routine Surveillnce Revealed That Primary Containment Atmospheric Oxygen Analyzer 2-CAC-AT-1263-2 Was Not Showing Expected Trend in Drywell Oxygen Concentration.Caused by Stuck Contacts + (08:57:33, 18 December 2024)
- ML20053B927 + (08:57:42, 18 December 2024)
- ML20053B926 + (08:57:43, 18 December 2024)
- 05000324/LER-1982-063, Forwards LER 82-063/03L-0 + (08:57:44, 18 December 2024)
- ML20053B923 + (08:57:47, 18 December 2024)
- ML20053B922 + (08:57:48, 18 December 2024)
- 05000302/LER-1982-022-03, /03L-0:on 820321,emergency Feedwater Ultrasonic Flow Indicator Not Functioning.Caused by Failed Power Supply.Ultrasonic Flow Transmitter Will Be Replaced W/ Conventional Flow Transmitter + (08:57:50, 18 December 2024)
- ML20053B920 + (08:57:55, 18 December 2024)
- ML20053B918 + (08:57:57, 18 December 2024)
- 05000302/LER-1982-022, Forwards LER 82-022/03L-0 + (08:57:58, 18 December 2024)
- 05000302/LER-1982-021-03, /03L-0:on 820219,while Using SP-221 (Startup Feedwater Valve Air Accumulator Leak Test) for Maint Trouble Identification,Feedwater Valve (FWV-39) Failed to Meet Surveillance Criteria.Cause Undetermined + (08:58:00, 18 December 2024)
- ML20053B912 + (08:58:02, 18 December 2024)
- 05000327/LER-1982-046-03, /03L-0:on 820205,surveillance Instruction 166.6 Not Performed on Steam Generator Blowdown Isolation Valve, Found During Review of Maint Requests on 820326.Caused by Misplaced Maint Request + (08:58:07, 18 December 2024)
- ML20053B910 + (08:58:14, 18 December 2024)
- ML20053B909 + (08:58:15, 18 December 2024)
- ML20053B908 + (08:58:16, 18 December 2024)
- ML20053B907 + (08:58:17, 18 December 2024)
- 05000324/LER-1982-049-03, /03L-0:on 820325,during Channel Calibr & Functional Test of ECCS Shroud Level Instrumentation,Level Switch Actuated Out of Tech Spec Tolerances.Caused by Drift of Instrument Mechanism.Instrument Recalibr + (08:58:19, 18 December 2024)