Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20058N572 + (12:48:06, 17 December 2024)
- ML20058N571 + (12:48:07, 17 December 2024)
- ML20058N570 + (12:48:07, 17 December 2024)
- ML20058N568 + (12:48:08, 17 December 2024)
- ML20058N567 + (12:48:09, 17 December 2024)
- ML20058N566 + (12:48:10, 17 December 2024)
- 05000443/LER-1993-015, :on 930908,determined That Procedures for Performing EDG TS SR 4.8.1.1.2 a.5 Did Not Verify That Engine Speed Was at Least 514 RPM Due to Oversight in Development of Sr.Lar Submitted + (12:48:12, 17 December 2024)
- ML20058N564 + (12:48:13, 17 December 2024)
- ML20058N563 + (12:48:14, 17 December 2024)
- ML20058N562 + (12:48:18, 17 December 2024)
- ML20058N561 + (12:48:19, 17 December 2024)
- 05000443/LER-1993-016, :on 930909,identified Condition That Could Have Prevented Fulfillment of Safety Function of EFW Sys Under Certain Design Basis Meteorological Conditions.Root Cause of Event Under Investigation + (12:48:21, 17 December 2024)
- ML20058N559 + (12:48:22, 17 December 2024)
- 05000293/LER-1993-022, :on 930910,simultaneous Loss of Preferred Offsite Power & Automatic Scram Resulting from Load Rejection Occurred.Caused by Load Rejection.Switchyard Walked Down for Evidence of Damage + (12:48:24, 17 December 2024)
- 05000461/LER-1990-014, :on 900712,determined That Tech Spec Surveillance 4.8.1.1.1.a Not Performed within 1 H After Diesel Generator Declared Inoperable.Caused by Operator Error.No Specific Corrective Action Required + (12:48:26, 17 December 2024)
- ML20058N556 + (12:48:27, 17 December 2024)
- B14630, Documents Util Understanding of Status of Listed SEP Topics at Plant + (12:48:28, 17 December 2024)
- SNRC-1746, Requests Interim Relief from Limiting Condition for Operation 3.7.1.2.b.3 Re Tech Spec for Plant Svc Water Sys - Shutdown + (12:48:29, 17 December 2024)
- ML20058N551 + (12:48:31, 17 December 2024)
- ML20058N550 + (12:48:33, 17 December 2024)
- ML20058N549 + (12:48:34, 17 December 2024)
- 05000213/LER-1993-016, :on 930920,determined That Potential Existed to Divert Inventory from Dwst.Issue of Thoroughness in Engineering Analyses & Evaluations Will Be Addressed by Reviewing Event W/Engineering Personnel + (12:48:35, 17 December 2024)
- ML20058N546 + (12:48:36, 17 December 2024)
- ML20058N544 + (12:48:37, 17 December 2024)
- ML20058N545 + (12:48:37, 17 December 2024)
- ML20058N543 + (12:48:38, 17 December 2024)
- 05000416/LER-1993-008, :on 930913,reactor Scram Occurred Due to Actuation & Injection of HPCS Sys,As Result of HPCS Low Water Level Channels C & G Generating Erroneous Level Signal.No C/As Necessary for HPCS Actuation + (12:48:40, 17 December 2024)
- SNRC-1740, Application for Amend to License NPF-82,revising Tech Specs Re Defueled SAR + (12:48:41, 17 December 2024)
- ML20058N538 + (12:48:42, 17 December 2024)
- ML20058N536 + (12:48:46, 17 December 2024)
- ML20058N534 + (12:48:47, 17 December 2024)
- SNRC-1743, Advises That Util Eliminated Positions of Outage & Mod Div Manager & Outage Engineer.Safety Significance of Changes Evaluated.No Impact Exist Because Util Contractually Prohibited from Operating Facility + (12:48:48, 17 December 2024)
- ML20058N532 + (12:48:49, 17 December 2024)
- ML20058N530 + (12:48:50, 17 December 2024)
- 05000338/LER-1991-019, :on 910904,discovered Improper Lhsi Relief Valve Blowdown Ring Setting Due to Inadequate Procedure. Properly Set Blowdown Ring on Relief Valve.Procedures Revised + (12:48:51, 17 December 2024)
- ML20058N528 + (12:48:53, 17 December 2024)
- ML20058N527 + (12:48:54, 17 December 2024)
- ML20058N525 + (12:48:55, 17 December 2024)
- ML20058N522 + (12:48:56, 17 December 2024)
- ML20058N521 + (12:48:57, 17 December 2024)
- ML20058N515 + (12:49:05, 17 December 2024)
- ML20058N518 + (12:49:05, 17 December 2024)
- ML20058N513 + (12:49:06, 17 December 2024)
- ML20058N509 + (12:49:08, 17 December 2024)
- ML20058N511 + (12:49:08, 17 December 2024)
- ML20058N507 + (12:49:09, 17 December 2024)
- ML20058N506 + (12:49:10, 17 December 2024)
- ML20058N505 + (12:49:10, 17 December 2024)
- ML20058N503 + (12:49:11, 17 December 2024)
- ML20058N502 + (12:49:12, 17 December 2024)
- 05000341/LER-1993-012, :on 930906,HPCI Sys Suction Swap from Condensate Storage Tank to Torus Occurred.Caused by Discrepancies Between HPCI & Torus Water Mgt Sys Instrument. Calibr Performed on Torus Water Mgt Sys + (12:49:13, 17 December 2024)