Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20059C623 + (08:10:49, 17 December 2024)
- ML20059C622 + (08:10:50, 17 December 2024)
- ML20059C617 + (08:10:50, 17 December 2024)
- ML20059C616 + (08:10:51, 17 December 2024)
- ML20059C615 + (08:10:51, 17 December 2024)
- ML20059C613 + (08:10:52, 17 December 2024)
- ML20059C611 + (08:10:53, 17 December 2024)
- ML20059C609 + (08:10:54, 17 December 2024)
- ML20059C607 + (08:10:55, 17 December 2024)
- ML20059C608 + (08:10:55, 17 December 2024)
- ML20059C602 + (08:10:56, 17 December 2024)
- ML20059C604 + (08:10:56, 17 December 2024)
- ML20059C600 + (08:10:57, 17 December 2024)
- ML20059C597 + (08:10:59, 17 December 2024)
- 05000219/LER-1990-011, :on 900723,unqualified Operators on Shift Due to Programmatic Inadequacies in Exam Process.Operators Involved Removed Immediately from Licensed Duty & Placed in Accelerated Requalification Program + (08:11:00, 17 December 2024)
- ML20059C595 + (08:11:01, 17 December 2024)
- DD-93-23, Directors Decision DD-93-23 Re M Daley & J M Block Requesting Per 10CFR2.206,that NRC Reconsider Civil Penalty Assessed Against Vynp for Operating Station Outside TS from 921015-930406.Request Denied + (08:11:02, 17 December 2024)
- ML20059C593 + (08:11:06, 17 December 2024)
- 05000309/LER-1990-005, :on 900725,improper Switch Alignment Rendered Functional Units Inoperable Due to Switch Mispositioning. Caused by Personnel Oversight During Maint.Calorimetric Adjustment Performed to Ensure Proper Output + (08:11:07, 17 December 2024)
- ML20059C589 + (08:11:09, 17 December 2024)
- 05000333/LER-1993-020-01, :on 930924,reactor High Pressure Scram Occurred Due to Partial Closure of Turbine Bypass Valve.Isolated & Corrected Bus Grounds + (08:11:11, 17 December 2024)
- ML20059C584 + (08:11:13, 17 December 2024)
- ML20059C579 + (08:11:14, 17 December 2024)
- ML20059C576 + (08:11:15, 17 December 2024)
- ML20059C574 + (08:11:16, 17 December 2024)
- ML20059C569 + (08:11:17, 17 December 2024)
- ML20059C564 + (08:11:19, 17 December 2024)
- ML20059C562 + (08:11:20, 17 December 2024)
- ML20059C559 + (08:11:21, 17 December 2024)
- 05000482/LER-1990-017, :on 900729,determined That Portion of Contents of Waste Gas Decay Tank 3 Discharged to Radwaste Bldg HVAC, Resulting in Tech Spec Violation.Caused by Procedural Inadequacy.Work Request Initiated + (08:11:24, 17 December 2024)
- ML20059C552 + (08:11:25, 17 December 2024)
- 2CAN109306, Documents Completion of Actions Associated W/Nrc Bulletin 88-011 to Ensure Pressurizer Surge Line Has Not Experienced Thermal Stresses Beyond Code Allowable Values Due to Thermal Stratification + (08:11:27, 17 December 2024)
- ML20059C548 + (08:11:28, 17 December 2024)
- ML20059C547 + (08:11:29, 17 December 2024)
- ML20059C544 + (08:11:30, 17 December 2024)
- ML20059C542 + (08:11:31, 17 December 2024)
- ML20059C540 + (08:11:32, 17 December 2024)
- ML20059C537 + (08:11:33, 17 December 2024)
- ML20059C536 + (08:11:34, 17 December 2024)
- RC-93-0266, Forwards Amend 32 to Physical Security Plan & Rev 7 of Safeguards Contingency Plan,Per 10CFR50.54(p).Plan Withheld, Per 10CFR73.21 + (08:11:35, 17 December 2024)
- ML20059C534 + (08:11:36, 17 December 2024)
- ML20059C529 + (08:11:37, 17 December 2024)
- ML20059C526 + (08:11:39, 17 December 2024)
- 05000313/LER-1993-004-02, :on 931004,red Train Volt Engineered Safeguards Bus & Volt Load Ctr Unintentionally de-energized.Caused by Procedural Deficiency.Procedure Revised + (08:11:41, 17 December 2024)
- ML20059C519 + (08:11:42, 17 December 2024)
- ML20059C514 + (08:11:43, 17 December 2024)
- ML20059C508 + (08:11:45, 17 December 2024)
- ML20059C507 + (08:11:46, 17 December 2024)
- ML20059C505 + (08:11:47, 17 December 2024)
- ET-NRC-93-4001, Forwards Proprietary Piping Diagrams for AP600 Automatic Depressurization Sys,Incontainment RWST & Core Makeup Tank, as Suppl to Westinghouse in Response to NRC 930402 RAI Re AP600 Design.Diagrams Withheld,Per 10CFR2.790 + (08:11:48, 17 December 2024)
- ML20059C503 + (08:11:49, 17 December 2024)