Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20063A929 + (03:12:50, 17 December 2024)
- ML20063A941 + (03:12:50, 17 December 2024)
- ML20063A912 + (03:12:51, 17 December 2024)
- ML20063A915 + (03:12:51, 17 December 2024)
- ML20063A885 + (03:12:52, 17 December 2024)
- NRC-93-0152, Forwards Rev 10 to Radiological Emergency Response Preparedness Plan. Rev Includes Changes That as of 940103, Implement Revised EPA, Manual of Protective Action Guides & Protective Actions for Nuclear Incidents, EPA 400-R-92-001 + (03:12:52, 17 December 2024)
- ML20063A875 + (03:12:53, 17 December 2024)
- ML20063A878 + (03:12:53, 17 December 2024)
- ML20063A865 + (03:12:54, 17 December 2024)
- ML20063A873 + (03:12:54, 17 December 2024)
- L-94-000, Forwards Central Files & Non-Central Files Version of EPIP, Including Rev 30,35 to EPIP 4.0,5.0 & Rev 3 to Index, Respectively,Rev 14,20,10,5,1,8 & 20 to EPIP 1.1,1.1.1, 1.1.2,12,5.1 & 9.2,respectively.CF Version Withheld + (03:12:56, 17 December 2024)
- ML20063A849 + (03:12:56, 17 December 2024)
- 1CAN019405, Forwards ISI Summary Rept Ano,Unit 1 Outage 1R11. Rept Provides Insp Results of Class 1 & 2 Pressure Retaining Components & Supports for Period 920509-931019 + (03:12:57, 17 December 2024)
- ML20063A840 + (03:12:58, 17 December 2024)
- ML20063A836 + (03:12:58, 17 December 2024)
- ML20063A809 + (03:12:59, 17 December 2024)
- NG-93-5097, Forwards Response to NRC Concerns Expressed in Re License Amend Request RTS-246 Submitted by Util + (03:12:59, 17 December 2024)
- ML20063A804 + (03:13:00, 17 December 2024)
- HL-4477, Forwards Rev 12B to FSAR for Ei Hatch Nuclear Plant Units 1 & 2 & Rev 9B to Ei Hatch Nuclear Plant Units 1 & 2 Fire Hazards Analysis + (03:13:01, 17 December 2024)
- ML20063A798 + (03:13:01, 17 December 2024)
- 05000352/LER-1993-017, :on 930705,discovered Condition Prohibited by TS in Special Rept for Inoperable Seismic Monitoring Sys Not Submitted in TS Time Period.Caused by Misinterpretation of TS Limiting Conditions.Procedures Revised + (03:13:03, 17 December 2024)
- ML20063A756 + (03:13:04, 17 December 2024)
- ML20063A739 + (03:13:05, 17 December 2024)
- 05000317/LER-1981-014-03, /03L-0:on 810227,diesel Generator 12 Started Automatically.Generator Stop & Start Failure Alarm Received.Caused by Insufficient Contact Wipe Provided by Diesel Start Switch + (03:13:08, 17 December 2024)
- ML20063A726 + (03:13:09, 17 December 2024)
- 05000317/LER-1981-014, Forwards LER 81-014/03L-0 + (03:13:10, 17 December 2024)
- 05000254/LER-1993-023-02, :on 931216,discovered Engineered Safety Feature Actuation Occurred.Caused by Main Turbine Control Logic Relay Failure.Relays Tested & Replaced.Station Investigating Options for Reliability & Adding Redundancy + (03:13:13, 17 December 2024)
- 05000317/LER-1981-015, Forwards LER 81-015/03L-0 + (03:13:14, 17 December 2024)
- 05000298/LER-1993-038, :on 931214,unplanned Automatic Reactor Scram & ESF Actuations Occurred Due to Feedwater Controller Failure. Caused by Age Degradation.Master Controller Replaced + (03:13:19, 17 December 2024)
- 05000298/LER-1993-039, :on 931214,discovered Two Instrument Line Orifices Not Installed Due to Original Contruction Deficiencies.Caused by Mod Error.Orifices Installed & Tested + (03:13:21, 17 December 2024)
- ML20063A689 + (03:13:22, 17 December 2024)
- 05000362/LER-1993-006-01, :on 931213,reactor Protection Sys Actuation Occurred During Mode 3.Caused by Manual Trip of RCP 3P002. No Corrective Actions Necessary + (03:13:24, 17 December 2024)
- ML20063A685 + (03:13:25, 17 December 2024)
- ML20063A683 + (03:13:26, 17 December 2024)
- PY-CEI-NRR-1741, Changes to Emergency Public Info Organization...Instruction Manual, Including Rev 20 to JPC-App B,Temporary Change 2 to Rev 9 to Instruction 9 & Temporary Change 2 to Rev 8 to Instruction 8 + (03:13:26, 17 December 2024)
- ML20063A675 + (03:13:27, 17 December 2024)
- RBG-39896, Requests Review & Approval of Proposed Change to Plant Asiatic Clam Control Program,Per TS 6.8.4.d.Proposed Change Based on Improvements to SWS & Asiatic Clam Monitoring Experience Since Improvements Made + (03:13:27, 17 December 2024)
- ML20063A665 + (03:13:31, 17 December 2024)
- JSP-015-94, Requests Schedule Extension to Complete GL 89-10 Activities for 70 MOVs in Util GL 89-10 Program.Proposed Schedule Would Extend Original Completion Date of 940628 to End of Sixth Refueling Outage Scheduled to Begin During Oct of 1996 + (03:13:32, 17 December 2024)
- ML20063A662 + (03:13:32, 17 December 2024)
- ML20063A661 + (03:13:33, 17 December 2024)
- ML20063A658 + (03:13:34, 17 December 2024)
- ML20063A656 + (03:13:35, 17 December 2024)
- ML20063A655 + (03:13:36, 17 December 2024)
- ML20063A653 + (03:13:37, 17 December 2024)
- ML20063A652 + (03:13:38, 17 December 2024)
- ML20063A651 + (03:13:39, 17 December 2024)
- ML20063A648 + (03:13:40, 17 December 2024)
- ML20063A647 + (03:13:40, 17 December 2024)
- ML20063A646 + (03:13:41, 17 December 2024)
- ML20063A645 + (03:13:42, 17 December 2024)