Notifies That 820819 Meeting Rescheduled to 820831 in Bethesda,Md.Purpose of Meeting Is to Introduce Project Mgt Personnel & Discuss Licensing Issues Impacting Util Resources & Licensing Documents Submittal.Agenda Encl
ML20063A885
Person / Time
Site: Beaver Valley
Issue date: 08/23/1982
From: Woolever E
DUQUESNE LIGHT CO.
To: Doolittle E
Office of Nuclear Reactor Regulation
References
NUDOCS 8208250100
Download: ML20063A885 (9)


Text

0

,f d

'Af (412) 787 - 5141 (412)923 - 1960 Telecopy (412) 787-2629 Nuclear Construction Division August 23, 1982 Robinson Plaza, Building 2, Suite 210 Pittsburgh, PA 15205 United States Nuclear Regulatory Commission Division of Licensing Washington, DC 20555 ATTENTION: Ms. E. Doolittle Project Manager

SUBJECT:

Beaver Valley Power Station Unit No. 2 Docket No. 50-412 Agenda for DLC/NRC Meeting on 8/31/82

Dear Ms. Doolittle:

As per your request, the Duquesne Light Company (DLC) meeting planned for 8/19/82 is rescheduled. Enclosed is a copy of"the meeting agenda now scheduled for August 31, 1982.

Should additional questions arise regarding this meeting, these may be directed to Mr. E. F. Kurtz, Manager, Regulatory Affairs (412-787-5141).

DUQUESNE LIGHT COMPANY By .

E. {,/ Woblever Vice President FLS/wjs Enclosure cc: G. Walton, NRC Resident Inspector gooI 4

8208250100 820823 PDR ADOCK 05000412 A PDR

t

  • BEAVER VALLEY POWER STATION - UNIT NO. 2 DOCKET NO. 50-412 DLC/NRC MEETING AGENDA LOCATION: NRC Office, Bethesda, MD DATE: Tuesday, August 31, 1982 TIME: 9:30 A.M.

ATTENDEES: E. J. Woolever DLC V.P. NCD R. J. Washabaugh DLC Project Manager - BV-2 J. A. Hultz DLC/0E Deputy Project Manager - Lic./Eng.

E. F. Kurtz DLC Mgr. Regulatory Affairs H. M. Siegel DLC Mgr. NCD Engineering W. H. Bohlke S&W Project Manager - BV-2 W. J. Parker S&W Asst. Project Engineer - BV-2 AGENDA

SUMMARY

PURPOSE:

Introduction of Project Management Personnel and initial discussion of licensing issues impact,ing DLC resources and licensing documents submittal.

INTRODUCTION (Attachment A):

A. Introduction of key BVPS-2 Project Personnel and organization.

B. Brief presentation of Project Status and Licensing schedule, goals and commitments.

ISSUES FOR DISCUSSION (Attachment B):

A. PRA vice Class 9 Accident Analysis -- DLC proposes a deferment of Class 9 accident analysis in the initial ER submittal in order to prepare a more responsive and plant specific assessment which requires performing a Probabalistic Safety Study employing PRA techniques.

B. Human Factors Engineering -- DLC is establishing a program to review current guidance and monitor the regulatory environment of this area.

DLC has performed a human factors evaluation of the BVPS-2 Emergency Shutdown Panel. However, pending NRC finalization of guidelines in RG 1.70 or NUREG 0800, DLC proposes a deferment of this analysis results from the initial FSAR submittal.

C. SRP Conformance Review -- Due to the scope of impact on the FSAR resources and effort of the recent change to 10CFR50.34 requiring identification of SRP conformance/ deviations, DLC proposes a deferment of this material from its initial FSAR submittal. This will be pro-vided 90 days after initial FSAR submittal.

D. Technical Specifications -- DLC proposes a deferment of TS issue from the initial FSAR submittal due to the need to assure a maximum of reasonable operational consistency with BVPS-1. A working copy would be available to the NRC.

!. , i f

r. j i

l ATTACHMENT A  !

IJ

[. INTRODUCTION / PROJECT STATUS (BVPS-2 Docket No. 50-412):

i A. PROJECT ORGANIZATION AND PERSONNEL INTRODUCTION:

! 1. Introduction of attendees.

I 2. - Presentation of DLC Organization Chart (Attachment A-1)

B. PROJECT STATUS AND COMPLETION GOALS:

1. Project Status:

BVPS-2 is a 3-LOOP Westinghouse NSSS PWR, 2660 MWt, 870 MWe.

The Construction Permit (CP).was issued May 1974.

~

a. Construction is approximately 57% complete as of August 1, 1982.
b. The FSAR is approximately 60% complete as of August 17, 1982.

j c. The ER is approximately 67% complete as of August 17, 1982.

Completion Goals:

2.

l DLC intends to submit the BVPS-2 FSAR/ER in the time " window" of L -1/1/83 - 3/31/83 which is in support of our construction completion

~

time " window"'of 1/1/86 - 3/31/86.

a. DLC assumes this licensing schedule based on recognition of current time periods associated with NRC review and licensing hearings.

l b. .DLC is assuming that the NRC considers the above schedule to be realistic and foresees no other external problem impacting support of issuance of DLC's Operating License in support of'BVPS-2's l construction completion.-

c. The Anti-Trust Report (ATR) Update and the Application for License, I

General Information Section (GIS) Update will be filed with the NRC .

on the following tentative dates:

ATR Update: Nov. - Dec. 1982 GIS Update: Jan. - Feb. 1983 L

l l

s L ,

- , - . ,, , a- _ , __ . - - , - . . . , . _ . . . . . - _

DUQUESNE LIGHT COMPANY BEAVER VALLEY POWER STATION - UNIT 2 PROJECT ORGANIZATION NUCLEAR CONS]RUCi]0N DIVISION VICE-PRESIDENI eire.nani sa E J WOOLEff R PROJECl MANAGER DEPUIY Pf OJECT MANAGERS seraians n.* .i r.. . .

lnJwastiastucH

[ k @j' 6 ,

I  :

usta A(,( R pariaf;f R mal #AGf R MANAGER MANAGER ENGillEERING CONSIRUCil0N 00st fit A550ffsta f ADuttal519Allvf SERVl(E5 REGut AIORf Af f AIRS

,...a. ie ear.. w. see eeressw. in R.J. 5Wl0(R5Al C f. IWlNG a G tu .It ovitse i F suRll H W $1ECIL H

~

M o

h m

I t

ATTACHMENT B FSAR/ER LICENSING ISSUES FOR DISCUSSION:

DLC in preparation of the FSAR/ER has recently completed a s tudy confirming project s tatus and resources as consistent with its current schedular goals.

Arising out of this s tudy, however, was identification of certain licensing

- issues - which po tentially impac t the schedule and DLC resources and, th e re fore ,

were identified as specific issues for discussion.

As general information, it should be noted diat DLC is preparing the FSAR and ER to the lates t available guidance.

Specifically, the FSAR is being prepared to:

a. Reg Gd 1.70, Rev 3
b. NUREG 0800, "The Standard Review Plan" The FSAR will, ~ therefore,' address the Action Items of NUREG 0737 and the Human Factors Engineering requirements in FSAR Chapter 18.

The ER is being prepared to:

a. Reg Gd 4.2, Rev 2 (with NRC draf t suplemental guidance)
b. NUREG 0555, " Environmental Standard Review Plans" It should be noted diat ER preparation also recognizes the DLC/NRC discussions of November 10, 1981.

The specific issues . identified for discussion at dhis meeting are:

a. PRA vice' Class 9 Accident Analysis ( Attachment B-1)
b. Human Factors Engineering ( Attachment B-2)
c. SRP (NUREG 0800) Conformance Review ( Attachment B-3)
d. Technical Specifications ( Attachment B-4) i l

i i

l E

.e e

ATTACHMENT B-1 ISSUE: PRA vice Class 9 Accident Analysis REQUIREMENT / ACTION:

An analysis of the impact of Class 9 Accidents on the environment is included in the ER as section 7.1. DLC proposes a deferment of d1is analysis from the initial ER submittal in order to prepare a more responsive and plant. specific assessment which requires performing a

. Probabilis tic Safety Study employing PRA techniques.

SCHEDULE:

The Class 9 Accident Analysis (ER section 7.1) will be submitted by Oc tober 1983.

The ccmpleted PRA report will be available in the firs t half of 1984.

BASIS:

To provide a more responsive as well as a more plant specific Class 9 Accident Analysis than is currently required, DLC has decided to commit the resources necessary to perform a PRA of BVPS-2. It should be noted da a t DLC does not consider BVPS-2 to be a "high density" plant as defined in SECY 80-283 and, th ere fore , is not required to perform a PRA. DLC intends for the PRA to. be a " full scope" vs. " limited" PRA with the additional objec tive that it become a "living" document diat may serve as the basis for long term safety review of the plant and be updated appropriately for plant design changes. As this commitment does represent significant additional resources and time, DLC requests Class 9 Accident Analysis deferral in accordance with above schedule which gives priority to the PRA only to die extent that suf ficient information be obtained to support the issue of die ER section on Class 9 Accident Analysis.

l l

a ATTACHMENT B-2 ISSUE: Human Factors Engineering REQUIREMENT / ACTION:

Noting that while Reg Gd 1.70 Rev. 3 does not contain requirements for an HFE assessment, NUREG 0800 does contain some criteria as FSAR Chapter 18.

DLC proposes a deferment of this item from the initial issue of the FSAR.

SCHEDULE:

To be determined based on NRC finalization of guidelines.

BASIS:

It is recognized _that while guidelines in NUREG 0800 are not finalized, regulatory guidance does exist. DLC is establishing a program to review current guidance and monitor the regulatory environment of HFE. Presently, DLC has performed a Human Factors Engineering evaluation on the Emergency Shutdown Panel for BVPS-2. DLC considers that the guidelines review and the exising evaluation will provide reasonable basis for the complete Human Factors Engineering evaluation program. A tentative schedule and brief scope of the program is planned for discussion at the next NRC/DLC interface meeting. The objective of such interface discussion is to assure efficient use of engineering resources and a Chapter 18 submittal consistent with NRC contant and schedular needs.

e

(

I l

e ATTACRMENT B-3

-ISSUE: SRP (NUREG 0800) Conformance Review REQUIREMENT / ACTION:

A' recent change. to 10 CFR 50.34 now requires the FSAR to contain

. identification of the applicant's extent of conformance to the S tandard-

-Review Plan. Due to the scope of impact on the BVPS-2' FSAR resources, DLC proposes a deferment of dhis material from the initial issue of die FSAR.

SCHEDULE:

DLC will issue the FSAR section (Section 1.9) which will contain the "Conformance Review" within 90 days af ter FSAR submittal.

BASIS:

Planning, scheduling and realignment of resources for this effort preclude inclusion of the "Conformance Review" in the initial submittal given the current s tage of the FSAR preparation and its scheduled submittal.

t D

.a O

ATTACHMENT B-4 ISSUE: Technical Specifications REQUIREMENT / ACTION:

Technical Specifications are contained within the Operating License as Chapter 16 of the FCAR. Due to the need to assure a maximum of reasonable operational consis tency with BVPS-1, DLC proposes a deferment of Technical Specification issue from the -initial FSAR submi ttal .

SCHEDULE:

The completed Technical Specifications' (Chapter 16) will be submitted prior

< to SER issue.

BASIS:

Due to many of dae recent design alterations resulting from both the normal design process and the regulatory requirements of recent years, much of dae plant design is either recently finalized or being finalized. Operating procedures and limits therefore, have ye t to be es tablished. Fur ther, DLC considers diat BVPS-2 should s trive for consis tency wi th BVPS-1 operations to the extent possible, particularly since BVPS-1 has " standardized Technical Specifications. . To achieve the desired consis tency, th ere fore ,

DLC intends, during the third quarter of dais year, to form a Technical Specification committee which will maintain a working copy of the Technical Specifications. This working copy would be available to the NRC upon request.