Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 0CAN029402, Advises That Util Proposing Changes to 930904 Submittal Re Encl Proposed Rev to Industrial Security Plan,Per 931214 Meeting.Proposed Changes Would Allow Flexibility to Determine Optimal Security Compensatory Measures + (02:44:26, 17 December 2024)
- 05000259/LER-1982-052, Forwards LER 82-052/03L-0 + (02:44:27, 17 December 2024)
- ML20063J522 + (02:44:27, 17 December 2024)
- LIC-94-0039, Omaha Public Power District Fort Calhoun Station Unit 1 Annual Rept for TS Section 5.9.4.A for Jan-Dec 1993, W/ + (02:44:28, 17 December 2024)
- ML20063J515 + (02:44:28, 17 December 2024)
- 2CAN029403, Monthly Operating Rept for Jan 1994 for Arkansas Nuclear One,Unit 2 + (02:44:29, 17 December 2024)
- ML20063J512 + (02:44:30, 17 December 2024)
- ML20063J510 + (02:44:31, 17 December 2024)
- ML20063J511 + (02:44:31, 17 December 2024)
- 3F0294-11, Responds to NRC Re Concerns Noted in Insp Rept 50-302/93-29.Disagrees W/Listed Characterization of Examples of Failure to Follow Procedures + (02:44:32, 17 December 2024)
- ML20063J500 + (02:44:32, 17 December 2024)
- ML20063J489 + (02:44:34, 17 December 2024)
- ML20063J479 + (02:44:35, 17 December 2024)
- ML20063J487 + (02:44:35, 17 December 2024)
- ML20063J465 + (02:44:36, 17 December 2024)
- ML20063J476 + (02:44:36, 17 December 2024)
- ML20063J461 + (02:44:37, 17 December 2024)
- ML20063J457 + (02:44:38, 17 December 2024)
- 05000374/LER-1994-001-01, :on 940118,reactor Scram Occurred During Main Turbine Shell Warming Process Due to Personnel Error.Entered Lgp 3-2,Reactor Scram & Procedure Carried Out to Completion + (02:44:40, 17 December 2024)
- 05000272/LER-1982-055-03, /03L-0:on 820801,during Surveillance Testing of Fire Suppression Sys,Number 1 Fire Pump Would Not Start from Automatic Initiation.Caused by Failed Battery Charger Fuse.Fuse Replaced & Battery Charged + (02:44:42, 17 December 2024)
- ML20063J452 + (02:44:43, 17 December 2024)
- ML20063J445 + (02:44:44, 17 December 2024)
- 05000272/LER-1982-055, Forwards LER 82-055/03L-0.Detailed Event Analysis Encl + (02:44:45, 17 December 2024)
- ML20063J425 + (02:44:45, 17 December 2024)
- ML20063J423 + (02:44:46, 17 December 2024)
- ML20063J395 + (02:44:46, 17 December 2024)
- ML20063J385 + (02:44:47, 17 December 2024)
- ML20063J367 + (02:44:47, 17 December 2024)
- ML20063J360 + (02:44:48, 17 December 2024)
- ML20063J361 + (02:44:48, 17 December 2024)
- ML20063J338 + (02:44:49, 17 December 2024)
- ML20063J352 + (02:44:49, 17 December 2024)
- ML20063J331 + (02:44:50, 17 December 2024)
- ML20063J318 + (02:44:51, 17 December 2024)
- ML20063J286 + (02:44:51, 17 December 2024)
- ML20063J265 + (02:44:52, 17 December 2024)
- ML20063J273 + (02:44:52, 17 December 2024)
- ML20063J252 + (02:44:53, 17 December 2024)
- ML20063J247 + (02:44:53, 17 December 2024)
- ML20063J243 + (02:44:54, 17 December 2024)
- ML20063J240 + (02:44:54, 17 December 2024)
- ML20063J237 + (02:44:55, 17 December 2024)
- ML20063J234 + (02:44:55, 17 December 2024)
- ML20063J232 + (02:44:56, 17 December 2024)
- ML20063J227 + (02:44:57, 17 December 2024)
- ML20063J228 + (02:44:57, 17 December 2024)
- ML20063J220 + (02:44:58, 17 December 2024)
- ML20063J216 + (02:44:58, 17 December 2024)
- L-20-017, Annual Report of Individual Monitoring of Radiation Exposure for 2019 + (02:44:59, 17 December 2024)
- ML20063J215 + (02:44:59, 17 December 2024)
- ML20063J203 + (02:45:00, 17 December 2024)
- 05000328/LER-1982-103-03, /03L-0:on 820728,while in Mode 1,pressurizer Relief Tank Level Channel Declared Inoperable Due to Failure to Meet Surveillance Requirements.Caused by Malfunction in Loop Transmitter Section.Tech Spec Changes Approved 820803 + (02:45:02, 17 December 2024)