Submits Info Re IE Bulletins 80-14 & 80-17.Completion of Mods to Scram Discharge Sys Will Resolve Design Deficiencies in Manner Specified in Ser.Actions Taken Will Be Discontinued Upon Completion of Sys Mods
ML20063J522
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 08/20/1982
From: Larson C
NORTHERN STATES POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-SSINS-6820 IEB-80-14, IEB-80-17, NUDOCS 8209020447
Download: ML20063J522 (1)


Text

!Mt B MSEE NORTHERN STATES POWER COMPANY August 20, 1982 Mr. James G. Keppler Director, Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 I.E. Bulletin Nos. 80-14 and 80-17 The following information is submitted with respect to I.E. Bulletin Nos. 80-14 and 80-17 and its supplements. Upon completion of the modifications to the Scram Discharge System, continuation of the " interim" or "short-term" requirements of IEB 80-14, IEB 80-17, and the Generic Safety Evaluation Report of the BWR Scram System (SER), will not result in a meaningful increase in safety. The forthcoming modifications to the system will resolve the design deficiencies in the manner specified as Acceptable Compliance in the SER.

Therefore, the actions taken in response to I.E.Bulletins 80-14 and 80-17 will be discontinued upon system modification.

This will include, but is not limited to, removing all of the SDV header ultrasonic level sensing instrumentation and re-installing the internals of the check valves in the SDV vent lines.

l l

Yours truly, WYw&m C. E. Larson>