Northem States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401 1927 Telephone (612) 330-5500 February 8, 1994 Monticello Technical Specifications Section 6.7.A.3 US Nuclear Regulatory Commission Attnt Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report January, 1994 Attached is the Monthly Operating Report for January, 1994 for the Monticello Nuclear Generating Plant.

O, Horer O Anderson Director Licensing and Management Issues c:

Director, Office of Resource Management Regional Administrator-III, NRC i

NRR Project Manager, NRC j

NRC Resident Inspector State of Minnesota - Kris Sanda Attachment i

l 9402230314 940131

- gy f

PDR ADDCK 05000263 l

M,t. v o - v PDR

~

~

.,L OPERATING DATA REPORT DOCKET NO.

50-263 DATE 2-:1-94 COMPLETED BY H.

H.

Paustian-TELEPHONE 612/295-5151 OPERATING STATUS

] Notes

]

1. Unit Name :

Monticello

]

_]

2. Reporting period:

January

]

]

3. Licensed Thermal Power (MWt):

1670

]

]

4. Nameplate Rating (Gross MWe):

569

]

]

5. Design Electrical Rating (Net MWe) :

545.4

]

]

6. Maximum Dependable Capacity (Gross MWe): __564

]

]

7. Maximum Dependable Capacity (Net MWe):

536

]

]

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

.9.

Power Level To Which Restricted, If Any (Not MWe):

N/A

10. Reasons For Restrictions, If Any: __N/A l

t THIS MONTH YR.-TO-DATE CUMULATIVE

11. Hours In Reporting Period 744 744 198025
12. Number Of Hours Reactor Was Critical 744.0 744.0 160119.7
13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
14. Hours Generator On-Line 744.0 744.0 157344.7 15.' Unit Reserve Shutdown Hours 0.0 0.0 0.0 i
16. Gross Thermal Energy Generated (MWH) 1240399 1240399 242505179
17. Gross Electrical Energy Generated (MWH) 421485 421485 81976148
18. Net Electrical Energy Generated (MWH) 406580 406580 78425373
19. Unit Service Factor 100.0%

100.0%

79.5%

l

20. Unit Availability Factor 100.0%

100.0%

79.5%

21. Unit Capacity Factor (Using MDC Net) 102.0%

102.0%

73.9%

22. Unit Capacity Factor (Using DER Net) 100.2%

100.2%

72.6%

23. Unit Forcnd Outage Rate 0.0%

0.0%

3.6%

24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
Refueling Outage - 9/15/94 - 39 days
25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A
26. Units In Test Status (Prior to Commercial Operation) : N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY I

COMMERCIAL OPERATION i

)

k i

I j

AVERAGE DAILY UNIT POWER LEVEL s

DOCKET NO.

50-263-UNIT Monticello DATE 2-1-94

~~-

COMPLETED BY H.

H.

Paustian TELEPHONE 612/295-5151 i

MONTH OF January DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 547.

17 548.

2 549.

18 543.

l 3

547.

19 546.

4 548.

20 547.

5 548.

21 547.

6 547.

22 547.

i 7

546.

23 548.

8 551.

24 546.

9 544.

25 547.

l 10 548.

26 546.

[

11 547.

27 549.

12 547.

28 547.

13 544.

29 548.

14 550.

30 547.

15 545.

31 546.

16 531.

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each i

day in the reporting month..

Compute to the nearest whole megawatt.

i i

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-263 i

DATE 2-1-94 COMPLETED BY H. H. Paustian TELEPHONE 612/295-5151 L

E MONTH JAN 01-1-94 to Power operation, j

01-31-94 I

t t

1 i

i j

Note: Power operation defined as essentially 100% of

. rated power except for weekend load drops for specified surveillance testing.

I l

+:

UNIT SHIRDOUNS AND POVER REDUCTIONS D00GT No. 50-263

+

UNIT NAME Honticello DATE 2-01-94 COMPLETED BY ~11. H. Paustian REPORT MONTH _ January _

TELEPHONE;612/295-5151 No.

Date Ty(peDuration Reason Method LER System Comp.

Cause & Corrective 1)

(hours)

(2) of No.

Code Code Action to Shutdown (4)

(5)

Prevent Recurrence (3)

None l

l 1

2 3

4 F: Forced Reason:

Method:

S: Scheduled A-Equipment Failure (Explain) 1-Manual.

Draft IEEE Standard l

805-1984(P805-D5) l B-Mamtenance or Test 2-Manual Scram C-Refueling.

D-Regulator Restriction 3-Automatic Scram 5

i l

E-Operator Trainin 4-Other (Explain)

IEEE Standard 803A-1983 F-Administrative. g & License Examination l

l G-Operational Error (Explain)

B-Other (Explain)

-