Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000361/LER-1982-158, Forwards LER 82-158/03L-0.Detailed Event Analysis Submitted + (01:37:09, 17 December 2024)
- ML20064J078 + (01:37:09, 17 December 2024)
- B14770, Proposed Tech Specs Supporting one-time Extension to 18- Month Surveillances + (01:37:10, 17 December 2024)
- ML20064J069 + (01:37:11, 17 December 2024)
- ML20064J061 + (01:37:12, 17 December 2024)
- ML20064J068 + (01:37:12, 17 December 2024)
- ML20064J056 + (01:37:13, 17 December 2024)
- ML20064J054 + (01:37:14, 17 December 2024)
- ML20064J053 + (01:37:15, 17 December 2024)
- LD-94-018, Suppls Submitted by Epri,Forwarding Rept on Technical Aspects of Emergency Planning for Alwrs + (01:37:16, 17 December 2024)
- ML20064J051 + (01:37:16, 17 December 2024)
- 05000395/LER-1982-054-03, /03L-0:on 821208,loose Part Detection Sys Failed Daily Channel Check.Caused by Microprocessor Failure. Microprocessor Replaced + (01:37:19, 17 December 2024)
- ML20064J048 + (01:37:20, 17 December 2024)
- ML20064J046 + (01:37:21, 17 December 2024)
- 05000387/LER-1982-067-01, /01T-0:on 821224,grab Samples Not Taken Every 4 H While Main Condenser Offgas Hydrogen Monitor Inoperable. Caused by Lack of Communication Between Operations & Chemistry Group.Incident Reporting Procedure Changed + (01:37:22, 17 December 2024)
- ML20064J040 + (01:37:23, 17 December 2024)
- ML20064J038 + (01:37:24, 17 December 2024)
- 05000395/LER-1982-054, Forwards LER 82-054/03L-0.Detailed Event Analysis Encl + (01:37:29, 17 December 2024)
- ML20064J034 + (01:37:29, 17 December 2024)
- 05000362/LER-1982-006, Ro:On 821217,incident Involving Emergency Safety Features Actuation Signal Occurred.Written Followup Rept W/Interim LER 82-006 Will Be Submitted by 821228 + (01:37:30, 17 December 2024)
- ML20064J028 + (01:37:31, 17 December 2024)
- ML20064J027 + (01:37:32, 17 December 2024)
- 05000416/LER-1982-164-03, /03L-0:on 821212 & 13,two Fire Doors in Auxiliary Bldg Blocked Open for Planned Maint Activities & to Support Plant Testing.Testing Completed,Hoses Removed & Doors Closed + (01:37:34, 17 December 2024)
- ML20064J018 + (01:37:35, 17 December 2024)
- ML20064J012 + (01:37:36, 17 December 2024)
- 05000387/LER-1982-067, Forwards LER 82-067/01T-0 + (01:37:37, 17 December 2024)
- ML20064J008 + (01:37:38, 17 December 2024)
- ML20064J005 + (01:37:38, 17 December 2024)
- ML20064J002 + (01:37:39, 17 December 2024)
- ML20064J001 + (01:37:40, 17 December 2024)
- 05000333/LER-1982-056-03, /03L-0:on 821215,LPCI Inverter a Tripped When Power Transferred to Maint Supply,Per Tech Spec 3.9.F. Redundant Sys Verified Operable.Caused by Failed Gate Timing Control Card.Card Returned to Vendor for Analysis & Repair + (01:37:46, 17 December 2024)
- 05000416/LER-1982-164, Forwards LER 82-164/03L-0 + (01:37:48, 17 December 2024)
- ML20064H970 + (01:37:50, 17 December 2024)
- 05000333/LER-1982-056, Forwards LER 82-056/03L-0 + (01:37:51, 17 December 2024)
- ML20064H964 + (01:37:51, 17 December 2024)
- ML20064H959 + (01:37:52, 17 December 2024)
- RC-94-0075, Application for Amend to License NPF-12,consisting of TS Change TSP 930012,deleting TS SR 4.8.4.1.a.3 Which Mandates Periodic Retesting of Penetration Protection Fuses & Bases B 3/4.8.4 Will Also Delete Refs to Subj Fuses + (01:37:53, 17 December 2024)
- 05000324/LER-1982-137-03, /03L-0:on 821206,during Operability Test of Remote Shutdown Panel,Rhrsw D/P Transmitter 2-E11-POT-N002BX Did Not Respond to Test Input Signal.Caused by Failed Transmitter Differential Pressure Unit.Transmitter Replaced + (01:37:58, 17 December 2024)
- PM-82-134, RO 50-366/1982-007:on 821230,while Performing Peak Shock Annunciator & Recorder Functional Test Procedure,Triaxial Response Spectrum Recorder Found Inoperable.Caused by Damaged Switches.Component Repaired by Manufacturer + (01:37:59, 17 December 2024)
- ML20064H943 + (01:38:00, 17 December 2024)
- 05000361/LER-1982-151-03, /03L-0:on 821128,while Performing Monthly Channel Check Surveillance,Temp Indication TI-0111BX for Reactor Coolant Hot Leg Read More than 48 F Lower than TI-0911X1. Caused by Setpoint Drift.Indicator Recalibr + (01:38:01, 17 December 2024)
- B14776, Requests Relief from ASME Boiler & Pressure Vessel Code Section XI Requirements Per 10CFR50.55a(g)(6)(i),in Response to GL 90-05.Description of Actions Taken by Util to Make Interim Repairs to Leak in Subj Piping Encl + (01:38:02, 17 December 2024)
- 05000348/LER-1978-087-03, /03L-0 on 781221:vibration Readings Taken on River Water Pump 4 Exceeded Acceptable Limits.Work on Pump Bedplate,Adjustment of Impeller Lift & Pump/Motor Realignment Restored Vibration to W/In Acceptable Range + (01:38:04, 17 December 2024)
- 05000348/LER-1978-085-03, /03L-0 on 781120:train a River Water(Rw)Pump 9 Secured Due to Vibration.Tech Specs Req at Least 2 Independent RW Loops to Be Operable.Caused by Bearing Damage Due to Fouling of Lube/Cooling Piping + (01:38:06, 17 December 2024)
- ML20064H925 + (01:38:07, 17 December 2024)
- 05000368/LER-1978-019-03, /03L-0 on 781129:Chilled Water Return Containment Isolation valve,2CV3850-2,was Taken Out of Svc to Repair Control Room Communication Breaker Contacts.Breaker Was Changed to Type AB Contacts + (01:38:09, 17 December 2024)
- RC-94-0076, Application for Amend to License NPF-12,consisting of TS Change TSP 940001,revising AOT for RHR Suction Relief Valves as Specified in LCO for TS 3.4.9.3, Overpressure Protection Sys. Change Parallels Guidance of GL 90-06,GI-94 + (01:38:10, 17 December 2024)
- RC-94-0074, Responds to Violation Noted in Insp 50-395/94-03 Re Service Water Booster Pump Area Air Handling Units Must Be Isolated for SW Inlet Temps Less than 48F.Both Trains of Chill Water to Svc Water Booster Air Pump Handling Units Isolated + (01:38:10, 17 December 2024)
- 05000296/LER-1982-062-03, /03L-0:on 821211,during Rod Pattern Adjustment, Calculated R Factor Less than R Factor Used to Set Average Power Range Monitor Scram Rod Blocks.Caused by Control Rod Pattern Adjustment in Nonequilibrium Xenon Conditions + (01:38:12, 17 December 2024)
- 05000348/LER-1978-086-03, /03L-0 on 781221:both Trains of Component Cooling Water Were Discovered to Be cross-connected at Charging Pump 1B.FNP-1-STP-23.7 Was Rev to Show Alignment of Charging Pump 1B to Either Train + (01:38:14, 17 December 2024)
- ML20064H918 + (01:38:15, 17 December 2024)