Similar Documents at Byron |
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217H5221999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Byron Station, Units 1 & 2.With ML20212B9261999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Byron Station,Units 1 & 2.With ML20210R3431999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Byron Station, Units 1 & 2.With ML20209H3711999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Byron Station, Units 1 & 2.With ML20195J8001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Byron Station,Units 1 & 2.With ML20206R6991999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Byron Station Units 1 & 2.With ML20205P7001999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Byron Station,Units 1 & 2.With ML20204C7671999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Byron Station,Units 1 & 2.With ML20199E6371998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Byron Station,Units 1 & 2.With ML20198D1501998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20195F8321998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20154L5501998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20197C9051998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20151Z9651998-08-31031 August 1998 Revised MOR for Aug 1998 for Byron Nuclear Power Station. Rept Now Includes Page 9 Which Was Omitted from Previously Issued Rept ML20237B4841998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Byron Nuclear Power Station Units 1 & 2 ML20236R1531998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20248M3071998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Byron Nuclear Station,Units 1 & 2 ML20247J9091998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20216D5881998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20248L1531998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20202G1881998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20198P2461997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20197F1201997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20199D1491997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Byron Nuclear Power Station Units 1 & 2 ML20211P8861997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20217A9031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20211P9061997-08-31031 August 1997 Corrected Page 8 of Monthly Operating Rept for Aug 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20210L4061997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20149D9441997-06-30030 June 1997 Monthly Operating Repts for June 1997 Byron Nuclear Power Station,Units 1 & 2 ML20210L4111997-05-31031 May 1997 Corrected Page 6 of Monthly Operating Rept for May 1997 for Byron Nuclear Power Station,Unit 1 ML20141C3081997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20141E2491997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20141C3491997-04-30030 April 1997 Corrected Pp 4 & 10 of Monthly Operating Rept for Apr 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20140D7511997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20141C3281997-03-31031 March 1997 Corrected Page 4 of Monthly Operating Rept for Mar 1997 for Byron Nuclear Power Station,Unit 1 ML20141C3131997-02-28028 February 1997 Corrected Pp 4 & 6 of Monthly Operating Rept for Feb 1997 for Byron Nuclear Power Station,Unit 1 ML20136H5811997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20134L8651997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Byron Nuclear Power Station ML20133M2391996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20132C4521996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20134N0561996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20129A6861996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Byron Nuclear Power Station Units 1 & 2 ML20117N5051996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20134N0861996-08-31031 August 1996 Revised Monthly Operating Rept for Aug 1996 for Byron Unit 2 ML20134N0631996-07-31031 July 1996 Revised Monthly Operating Rept for Jul 1996 for Byron Unit 1 ML20116M6481996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Bs NPP Units 1 & 2 ML20115E2141996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Byron Nuclear Power Plant Units 1 & 2 ML20117M3851996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Byron Nuclear Power Station ML20117G6261996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Byron Nuclear Power Station Units 1 & 2 ML20101R6151996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Byron Nuclear Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H5221999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Byron Station, Units 1 & 2.With ML20217P6351999-09-29029 September 1999 Non-proprietary Rev 6 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212B9261999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Byron Station,Units 1 & 2.With ML20210R3431999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Byron Station, Units 1 & 2.With ML20210E2251999-07-21021 July 1999 B1R09 ISI Summary Rept Spring 1999 Outage, 980309-990424 ML20209G1751999-07-0808 July 1999 SG Eddy Current Insp Rept,Cycle 9 Refueling Outage (B1R09) ML20207H7941999-06-30030 June 1999 Rev 0 to WCAP-15180, Commonwealth Edison Co Byron,Unit 2 Surveillance Program Credibility Evaluation ML20207H8071999-06-30030 June 1999 Rev 0 to WCAP-15178, Byron Unit 2 Heatup & Cooldowm Limit Curves for Normal Operations ML20207H7851999-06-30030 June 1999 Rev 0 to WCAP-15183, Commonwealth Edison Co Byron,Unit 1 Surveillance Program Credibility Evaluation ML20207H7771999-06-30030 June 1999 Rev 0 to WCAP-15177, Evaluation of Pressurized Thermal Shock for Byron,Unit 2 ML20209H3711999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Byron Station, Units 1 & 2.With ML20207H7561999-06-28028 June 1999 Pressure Temp Limits Rept (Ptlr) ML20207H7621999-06-28028 June 1999 Pressure Temp Limits Rept (Ptlr) ML20195J8001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Byron Station,Units 1 & 2.With ML20207B6481999-05-25025 May 1999 SER Accepting Revised SGTR Analysis for Byron & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations ML20206R6991999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Byron Station Units 1 & 2.With ML20195C7961999-04-28028 April 1999 Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A) M980023, Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A)1999-04-28028 April 1999 Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A) ML20205P7001999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Byron Station,Units 1 & 2.With ML20205B5091999-03-26026 March 1999 SER Accepting Relief Requests 12R-24,Rev 0 & 12R-34,Rev 0, Related to Second 10-year Interval Inservice Insp for Byron Station,Units 1 & 2 ML20205C5101999-03-21021 March 1999 Revised Safety Evaluation Supporting Improved TS Amends Issued by NRC on 981222 to FOLs NPF-37,NPF-66,NPF-72 & NPF-77.Revised Pages Include Editorial Corrections ML20204G3831999-03-19019 March 1999 Safety Evaluation Accepting Second 10-yr Interval ISI Request for Relief 12R-11 M990004, Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function1999-03-17017 March 1999 Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function ML20206A8831999-03-17017 March 1999 Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML20204H9941999-03-0303 March 1999 Non-proprietary Rev 4 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations ML20204C7671999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Byron Station,Units 1 & 2.With ML20199G8271998-12-31031 December 1998 Rev 1 Comm Ed Byron Nuclear Power Station,Unit 1 Cycle 9 Startup Rept ML20205M7061998-12-31031 December 1998 Unicom Corp 1998 Summary Annual Rept. with ML20202F6181998-12-31031 December 1998 Cycle 8 COLR in ITS Format & W(Z) Function ML20206B4001998-12-31031 December 1998 Annual & 30-Day Rept of ECCS Evaluation Model Changes & Errors for Byron & Braidwood Stations ML20199E6371998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Byron Station,Units 1 & 2.With ML20202F6021998-12-31031 December 1998 Cycle 9 COLR in ITS Format & W(Z) Function ML20196K6731998-12-31031 December 1998 10CFR50.59 Summary Rept for 1998 ML20207H7731998-11-30030 November 1998 Rev 0 to WCAP-15125, Evaluation of Pressurized Thermal Shock for Byron,Unit 1 ML20207H8011998-11-30030 November 1998 Rev 0 to WCAP-15124, Byron Unit 1 Heatup & Cooldown Limit Curves for Normal Operation ML20198D1501998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20196A4191998-11-19019 November 1998 Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB ML20195F8321998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Byron Nuclear Power Station,Units 1 & 2.With 05000454/LER-1998-018, Corrected LER 98-018-00:on 980912,inoperable Unit 1 DG Was Noted.Caused by Low Lube Oil Pressure Condition.Immediately Entered Into Lcoar for AC Sources TS 3.8.1.1,Action a1998-10-0909 October 1998 Corrected LER 98-018-00:on 980912,inoperable Unit 1 DG Was Noted.Caused by Low Lube Oil Pressure Condition.Immediately Entered Into Lcoar for AC Sources TS 3.8.1.1,Action a ML20207H7671998-10-0505 October 1998 Rv Weld Chemistry & Initial Rt Ndt ML20154L5501998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20197C9051998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20151Z9651998-08-31031 August 1998 Revised MOR for Aug 1998 for Byron Nuclear Power Station. Rept Now Includes Page 9 Which Was Omitted from Previously Issued Rept ML20238F6551998-08-28028 August 1998 SE Authorizing Licensee Request for Relief NR-20,Rev 1 & NR-25,Rev 0 Re Relief from Examination Requirement of Applicable ASME BPV Code,Section XI for First ISI Interval Exams ML20237E2331998-08-21021 August 1998 Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical Rept ML20237B3361998-08-14014 August 1998 B2R07 ISI Summary Rept,Spring 1998 Outage, 961005-980518 ML20237B4841998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Byron Nuclear Power Station Units 1 & 2 1999-09-30
[Table view] |
Text
]' C:mm:nw1Cith Edis n
/ Byron Nuclear Station O y 4450 North German Church Road J x ./ Byron, lil6nois 61010 March 9, 1994 LTR: BYRON 94-0089 FILE: 2.7.200 (1.10.0101)
Director, Office of Management Information and Program Control United States Nuclear Regulatory Commission Washington, D.C. 20555 ATTU: Document Control Desk Gentlemen:
Enclosed for your information is the Monthly Performance Report covering Byron Nuclear Power Station for the period February 1 through February 28, 1994.
Sincerely,
/ M G. K. Schwartz Station Manager Byron Nuclear Power Station GKS/RC/ng cc: i J.B. Martin, NRC, Region III
]
NRC Resident Inspector Byron )
IL Dept. of Nuclear Safety )
l Nuclear Licensing Manager Nuclear Fuel Services, PWR Plant Support j D.R. Eggett, Station Nuclear Engineering )
INPO Records Center J.B. Hickman USNRC F. Yost Utility Data Institute, Inc.
80280 940228 Qk l R ADOCK osooo434 PDR j/ g (9928te!/WPF/020394 /1) U/ l 210006
N f .
l
- )
i i
BYRON NUCLEAR POWER STATION UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT ..
COMMONWEALTH EDISON COMPANY ~
NRC DOCKET NO. 050-454 NRC DOCKET NO. 050-455 LICENSE NO..NPF-37 LICENSE NO. NPF+66 l
5 (9928MM/WPF/020394 /2)
-_ _ . . . . - . - - -. .. . . . . .-- .~. . . . . - -
a I. Monthly Reoort for BvIgn UNIT 1 for the month of February 1911 A. Summarv of Ooeratinct Exnerience for Unit 1 The Unit began this reporting period in Mode 1 (Power Operations).
The power level varied due to load following requirements.
J l
i l
l l
l (9928MM/WPF/020394 /3) 1
- -- - . . ~ , . . . _, __, , __ , , _ , . _ _ . . . , _
,)
~. - _ . - . .-,
B. OPEPATINQ_ DATA REPORT DOCKET NO. 050 454 UNIT: Byron One
. DATE: 03/09/94 COMPILED.BY: R. Colglazier TELEPHONE: (815)234-5441 x2282 OPERATING STATUS
- 1. Reporting Period: February, 1994. Gross Hours: 672
- 2. Currently Authorized Power Level 3411 (MWt)
Design Electrical Rating: 1175 (MWe-gross)
Design Electrical Rating: 1120 (MWe net)
Max Dependable Capacity: 1105 (MWe-net)
- 3. Power Level to Which Restricted (If Any) : None
- 4. Reasons for Restriction (If Any): N/A THIS MONTH YR TO DATE CUMULATIVE *
- 5. Report Period Hrs. 672 1416 74,113
- 6. Rx Critical Hours 672 1416 62,226.5 7 Rx Reserve Shutdown Hours 0 0 38 8, Hours Generator on Line 672 1416 61,548,1 1
- 9. Unit Reserve Shutdown Hours 0 0 0
- 10. Gross Thermal Energy (2001) 2,271,777 4,758,410 187,819,509 -s i
- 11. Gross Elec. Energy (MWH) 775,698 1,627,490 63,446,035
- 12. Net Elec. Energy (bnal) 741,827 1,556,381 60,119,716
- 13. Reactor Service Factor 100 100 83.96
- 14. Reactor Availability Factor 100 100 84.01
- 15. Unit Service Factor 100 100- 83.05 -!
- 16. Unit Availability Factor 100 100- 83.05
]
- 17. Unit Capacity Factor (MDC net) 99.90 99.47 73.41 ]
- 18. Unit Capacity Factor (DER net) 98.56 98.14 72.43 i
- 19. Unit Forced Outage Hrs. 0 0 1,498,2
- 20. Unit Forced Outage Rate 0 0 2.38
- 21. Shutdowns Scheduled Over Next 6 Months: 0 0 0
- 22. If Shutdown at End of Report Period, Estimated Date of Startup: None
- 23. Units in Test Status (Prior to Commercial Operation) : None
- Note - The cumulative numbers do not reflect power generated prior to commercial service.
I (9928MM/WPF/020394 /4 )
l
,- - . - ~ . _ . _ - _ , - - - D
. l C. AVERAGE DAILY UNIT POWER LEVEL
, DOCKET NO.: 050 454 UNIT Byron One DATE: 03/09/94 COMPILED BY: R. Colglazier TELEPHONE: .(815)234-5441 x2282 MONTH: February, 1994 DAY AVERAGF DAILY POWER LEVEL (MWe -Ne t)
- 1. 1103 MW 16. 1111 MW
- 2. 1098 MW 17. 1104 MW
- 3. 1101 MW 18 1100 MW 4 1098 MW 19. 1094 MW 5, 1093 MW 20, 1110 MW
- 6. 1102 MW 21, 1117 MW
- 7. 1104 MW 22, 1119 MW
- 8. 1099 MW 23, 1111 MW
- 9. 1106 MW 24. 1109 MW 10, 1096 MW 25, 1106 MW
- 11. 1091 MW 26. 1109 MW
- 12. 1092 MW 27. 1103 MW
- 13. 1095 MW 28. 1104.MW
- 14. 1102 MW 29.
- 15. 1114 MW 30.
l
- 31. !
INSTRUC TIONS On this form list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot'a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit there may ;
be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.) l In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
(9928MM/WPF/020394/5)
9
- Report Period February, 1994 UNIT SHUTDOWNS / REDUCTIONS -
(UNIT 1) **************************
Ng. Date Tvoe Hours Peason Method LER Number System Conconent Cause & Corrective Action to Prevent Recurrence NO SHIJrDOWNS OR MATOR REDUCTIONS FOR UNIT ONE
- TYPE Reason Method System & CceDonent F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report
& License Examination 9-Other (LER) File ~ (NUREG-0161)
(9928MM/WPF/020394 /6)
.- . . . . . - - - . . . . . - ~ . . . . . . - . - - .. - . . ~ . .- . . . ~ . . -.
t E. UNIOUE REPORTING REOUIRE14ENTS (UNIT 1) for the month of February 1994
'l. Safety / Relief valve operations for Unit One.
VALVES NO & TYPE PLANT DECCRIPTION DATE ACTUATED ACTUATION CONDITIQU Ol' EVENT None
- 2. Licensee generated changes to ODCM,.
None
- 3. Indications of failed fuel.
No. Fuel Reliability Indicator: FRI = 7,3 E-6 pCi/CC l
l I
l
-l 1
I l
(9928MM/WPF/020394/7) ,
F. LICENSEE EVENT REPORTS (UNIT 1)
The following is a tabular summary of all Licensee Event Reports'for Byron Nuclear Power Station,. Unit One, occurring during the reporting period, February 1, 1994 through February 28, 1994. This information in provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73. f Occurrence Licensee Event Reoort Number Date Title of OccurreDER
- 454: 94-001 02/01/94 LER 94-001 Several Valves may t not stroke under full dP conditions due to Torque ;
Switch settings.
i P
p
{
l P
(9928MM/WPF/020394/8)
. . . . ._. =. _- . . - . . - . -- -- - - _ . - _ . . - -- -
3 l
l
, 1 II. Monthly Reoort for Byron UNIT 2 ufor the' month of February 1994
'A . ' Summary of Ooeratino Excerience for Unit 2 The Unit began this reporting period in Mode 1 (Power Opcrations).
4 h
P I
F t
t S
(9928MM/WDF/020394 /9)'
- - . . . .=__ ~ - _ _ .
D B. OPERATING DATA REPORT DOCKET NO.: 050-455
, UNIT: Byron Two i DATE: 03/09/94 I COMPILED BY: R. Colglazier ,
TELEPHONE: (815)234 3441 '
1 x2282 OPERATING STATUS i
- 1. Reporting Period: February, 1994. Gross Hours: 672
- 2. Currently Authorized Power Level: 3411 (MWt)
Design Electrical Rating: 1175 (MWe-gross) ,
Design Electrical Rating: 1120 (MWe-net) l Max Dependable Capacity: 1105 (MWe-net)
- 3. Power Level to Which Restricted (If Any) None t 4 Reasons for Restriction (If Any) : N/A THIS MONTif YR TO DATE CUMULATIVE *
- 5. Report Period Hrs. 672 1416 57,217
- 6. Rx Critical Hours 672 1416 49,221.9 l 7 Rx Reserve Shutdown Hours 0 0 0 .
- 8. liours Generator on Line 672 1416 48,621.6
- 9. Unit Reserve Shutdown Hours 0 0 0'
- 10. Gross Thermal Energy (tent) 2,241,085 4,691,193 140,763,120
- 11. Gross Elec. Energy (MWH) 770,428 1,614,560 47,797,834
- 12, Net Elec. Energy (MWH) 736,895 1,544,315 45,327,542
- 13. Reactor Service Factor 100 100 86.03
- 14. Reactor Avail *.bility Factor 100 100 86.03
- 15. Unit Service Factor 100 100 84.98 j
- 16. Unit Availability Factor 100 100- 84.98
- 17. Unit Capacity Factor (MDC net) 99.24 98.70 71.69 l
- 10. Unit Capacity Factor (DER net) 97.91 97.38 0.73
- 19. Unit Forced Outage Hrs. 0 0 1,343.4 I l
- 20. Unit Forced Outage Rate 0 0 2.69 j
- 21. Shutdowns Scheduled Over Next 6 Months: 0 0 0 i
- 22. If Shutdown at End of Report Period, Date of Startup: None
- 23. Units in Test Status (Prior to Commercial Operation): None i
- Note - The cumulative numbers do not reflect power l generated prior to commercial service. !
(9928MM/WPF/020394 /10)
,.I i
, -, , , - - -- n-,,--- - . . . - - - ,+ --. -
l 1
C. AVEEAGE DAILY UNIT POWER L]LTL DOCKET NO.: 050-455 1
, UNIT: Byron Two DATE: 03/09/94 COMPILED BY: R. Colglazier TELEPHONE: (815)234-5441 l x2282 MONTH: February, 1994 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
- 1. 1114 MW 16. 1112 MW
- 2. 1107 MW 17, 1105 MW
- 3. 1110 MW 18. 1056 MW
- 4. 1090 MW 19. 1083 MW l
- 5. 1100 MW 20. 855 MW
^
- 6. 1107 MW ___ 21. 1118 MW
- 7. 1112 MW 22. 1122 MW ,
- 8. 1104 MW 23. 1l112 MW -
- 9. 1107 MW __ 24. 1113 MW
- 10. 1099 MW 25. 1112 MW
- 11. 1096 MW 26. 1115 f?
- 12. 1096 MW 27, 110.9 MW
- 13. 1100 MW 28, 1100 MW
- 14. 1101_MW 29.
e
- 15. 1116 MW 30.
31.
INSTRUCTIONS On this form list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole' megawatt. These figures will be used to plot a graph for each reporting month. Note that when maximum-dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line' )
(or the restricted power level line.) In such cases the average daily unit. I power output sheet should be footnoted to explain the apparent anomaly. 1 i
l 1
(9928MM/WPF/020394 /11)
e-
- Report Period February, 1994 UNIT SHUTDOWNS / REDUCTIONS *
(UNIT 2) **************************
. Ng, Date Tyne Hours Reason Method LER Number System Comoonent Cause & Corrective Action To Prevent Recurrence 2 02/20/94 S 15 A 5 FW Valve Reduced Load To Replace Nitrogen Solenoid On 2FWOO9A 1
- i TYPE Method Reason System & Comconent F-Forced A-Equip Fad lure F-Admin 1-Manual Exhibit F & H' S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of-
~
D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load -Licensee Event-Report
& License Examination 9-Other (LER) File (NUREG-0161)
(9928Md/WPF/020394/12)
__ , - . . _ . . . . . - _. - -_ - ,- .-. _ , . . . . _ , - . . . . - _ . . . _ . _ - _. .- ~
4 . .
F E. UN_IOUE REPORTING REOUIREEENTS (UNIT 2) for the month gf February 1991
- 1. Safety / Relief valve operations for Unit Two.
VALVES NO & TYPE PLANT DESCRIPTION ,
DAIS ACTUKd" Q ACTUATION CONDI'CLQH OF EVENT Hone
- 2. Licensee 3enerated changes to ODCM. ,
None
- 3. Indicationa of failed fuel.
No. Fuel Reliability Indicator: FRI = 4.5 E 5 pCi/CC i f
9
?
s 1
9 l
t i
i I
l 9
1 (9928MM/WPF/020394 /13) ,
7-
?
F. LICENSEE EVENT REEPRTS CUNIT 2) ,
The following is a tabular. summary of all Licensee Event Reports for i Byron Nuclear Power Station, Unit Two, occurring during the reporting period, February li 1994 through February 28, 1994. This information lii provided-
- pursuant to the reportable occurrence reporting requirements as set forth in -
10CFR 50,73.
t l Occurrence I Licensee Event Recort Numbgr Data Title of Occurrence ;
02/19/94 LER 94-001 Tech Spec Room 455: 94-001 Temperature taken at wrong location - missed surveillance ,
)
'I
?
.i t
h b
1 h
,. (9928MM/WPF/020394 /14 )
5: