Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000311/LER-1982-096-03, /03L-0:on 820831,containment Fan Coil Unit 23 Declared Inoperable When Operator Received Indication of Low Svc Water Flow.Caused by Silt Buildup in Cooling Coils.Flow Control Valve Cycled & Unit Tested Satisfactorily + (00:53:22, 17 December 2024)
- 3F0990-04, Informs of Continuing Activities at Facility to Clearly Define & Resolve post-accident Hydrogen Control Issues. Concludes That Sys Fully Capable of Performing Intended Function + (00:53:24, 17 December 2024)
- TXX-9031, Submits Annual Rept of Changes in Peak Cladding Temps.No Changes in ECCS Calculations Occurred During Last 12 Months. Update Will Be Provided W/Unit 2 FSAR Amend for Optimized Fuel Assemblies + (00:53:24, 17 December 2024)
- 05000348/LER-1982-037-03, /03L-0:on 820905,A Train Auto Trip Logic for High Steam Generator Differential Pressure Declared Inoperable When Failed Cord Indication Received by Automatic Tester. Caused by Failure of Universal Card.Card Replaced + (00:53:26, 17 December 2024)
- 05000338/LER-1982-058-03, /03L-0:on 820826,manipulator Crane Area Monitor RM-RMS-162 Failed to Meet Acceptance Criteria of Periodic Calibr & Declared Inoperable.Caused by Instrument Drift Greater than 3% Response Requirement.Assembly Replaced + (00:53:28, 17 December 2024)
- 05000311/LER-1982-096, Forwards LER 82-096/03L-0.Detailed Event Analysis Encl + (00:53:30, 17 December 2024)
- 05000338/LER-1982-058, Forwards LER 82-058/03L-0 + (00:53:30, 17 December 2024)
- 05000348/LER-1982-052-03, /03L-0:on 820831,during Control Room Emergency Ventilation Performance Test,B Train Emergency Air Cleanup Sys Failed to Meet Acceptance Criteria.Caused by Failure of Charcoal Filter to Meet Efficiency Requirements + (00:53:32, 17 December 2024)
- ML20065E642 + (00:53:34, 17 December 2024)
- ML20065E629 + (00:53:35, 17 December 2024)
- ML20065E609 + (00:53:39, 17 December 2024)
- ML20065E616 + (00:53:39, 17 December 2024)
- ML20065E603 + (00:53:41, 17 December 2024)
- ML20065E600 + (00:53:42, 17 December 2024)
- 05000318/LER-1994-002-01, :on 940305,inadvertent ESF Actuation Occurred Due to Less than Adequate Self Verification.Expectations to Restart self-verification Process If Interrupted Reemphasized + (00:53:43, 17 December 2024)
- ML20065E571 + (00:53:44, 17 December 2024)
- ML20065E566 + (00:53:47, 17 December 2024)
- 05000311/LER-1982-092-01, /01T-0:on 820908,svc Water Leak Discovered on Containment Fan Coil Unit 21.Caused by Erosion of Motor Cooling Coils.Motor Cooler Replaced & Fan Coil Tested Satisfactorily + (00:53:49, 17 December 2024)
- ML20065E547 + (00:53:50, 17 December 2024)
- ML20065E550 + (00:53:50, 17 December 2024)
- 05000498/LER-1993-023-01, :on 931231,non-emergency ESF Actuation of Sdg 12 Occurred.Caused by Electrical Arcing Between Sdg Panel & Test Equipment.Test Equipment & Diesel Circuitry Checked for Malfunction & Degradation + (00:53:55, 17 December 2024)
- PY-CEI-NRR-1217, Application for Amend to License NPF-58,adding Action Statement to Address Inoperable Containment Airlocks Interlock Mechanism in Tech Spec 3.6.1.3 + (00:53:56, 17 December 2024)
- ML20065E517 + (00:53:57, 17 December 2024)
- ML20065E510 + (00:53:58, 17 December 2024)
- 05000327/LER-1982-107-01, /01T-0:on 820911,annulus Door (A65) & Access Door (A64) Left Open,Causing Both Trains of Emergency Gas Treatment Sys to Be Declared Inoperable.Caused by Inoperability of Interlocks on Doors + (00:53:59, 17 December 2024)
- ML20065E493 + (00:54:00, 17 December 2024)
- 05000327/LER-1982-107, Forwards LER 82-107/01T-0 + (00:54:02, 17 December 2024)
- ML20065E466 + (00:54:02, 17 December 2024)
- ML20065E446 + (00:54:03, 17 December 2024)
- ML20065E431 + (00:54:04, 17 December 2024)
- ML20065E429 + (00:54:05, 17 December 2024)
- ML20065E418 + (00:54:07, 17 December 2024)
- ML20065E421 + (00:54:07, 17 December 2024)
- ML20065E410 + (00:54:08, 17 December 2024)
- ML20065E396 + (00:54:09, 17 December 2024)
- 05000366/LER-1982-083-03, /03L-0:on 820825,w/plant in Hot Shutdown,Reactor Bldg to Suppression Chamber Vacuum Breaker Had No Closed Indication & Declared Inoperable.Caused by Loose Limit Switch Mount Bracket & Out of Adjustment Actuator + (00:54:10, 17 December 2024)
- ML20065E386 + (00:54:12, 17 December 2024)
- ML20065E384 + (00:54:13, 17 December 2024)
- 05000366/LER-1982-083, Forwards LER 82-083/03L-0 + (00:54:15, 17 December 2024)
- ML20065E375 + (00:54:15, 17 December 2024)
- ML20065E369 + (00:54:16, 17 December 2024)
- ML20065E368 + (00:54:17, 17 December 2024)
- ML20065E365 + (00:54:18, 17 December 2024)
- ML20065E358 + (00:54:19, 17 December 2024)
- ML20065E354 + (00:54:20, 17 December 2024)
- ML20065E341 + (00:54:21, 17 December 2024)
- L-82-299, Ack Receipt of & Responds to Violations Noted in IE Insp Rept 50-335/82-17 on 820511-14.No Proprietary Info. Corrective Actions:Vendor Requested to Expedite Issuance of Steam Generator Insp Info + (00:54:22, 17 December 2024)
- ML20065E324 + (00:54:23, 17 December 2024)
- ML20065E334 + (00:54:23, 17 December 2024)
- ML20065E318 + (00:54:24, 17 December 2024)
- ML20065E315 + (00:54:25, 17 December 2024)
- ML20065E312 + (00:54:25, 17 December 2024)