ML20065E410
| ML20065E410 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 09/27/1982 |
| From: | Leasburg R VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | Clark R, Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20065E416 | List: |
| References | |
| 542, NUDOCS 8210010103 | |
| Download: ML20065E410 (3) | |
Text
_
w VIRGINIA EI ECTRIC AND PowsR COMPANY Hacnxonn, VIRGINIA 20261 R. II. Ls Ann uno September 27, 1982 Vaca Paansosnr Ns:ca. sam OrsmAraome Mr. Harold R. Denton, Director Serial No. 542 Office of Nuclear Reactor Regulation N0/WDC:acm Attn:
Mr. Robert A. Clark, Chief Docket No. 50-339 Operating Reactors Branch No. 3 License No. NPF-7 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Centlemen:
AMENDMENT TO OPERATING LICENSE NPF-7 NORTH ANNA POWER STATION UNIT NO. 2 PROPOSED OPERATING LICENSE AMENDMENT Pursuant to 10 CFR 50.90, the Virginia Electric and Power Company requests an amendment to Operating License NPF-7 for North Anna Power Station, Unit No. 2.
The proposed change to the Operating License is enclosed.
License Condition 2.C(15)(h)(4) currently states, "The fuel oil storage and transfer system shall be modified to include the installation of a separate high level alarm for each day tank, the installation of independent pressure switches for each pump which will be set to stop the pumps on high day tank
- level, and the submittal of Technical Specifications verifying proper operation of all transfer pump control switches and day tank high level alarms. The modifications shall be completed no later than the October, 1982 Fall maintenance outage."
The proposed change is to complete. License Condition 2.C(15)(h)(4) by the end of the second refueling outage.
License Condition 2.C(15)(h)(2) currently states, "The lube oil system shall be modified to the manufacturer's recommendations for providing contircious lubrication of the lower portions of the engine.
The modifications shall further provide for partial filling of the upper lube oil supply header and lube oil booster / accumulator system which will force oil into the upper lube oil header during engine startup.
The modifications shall be completed' no later than the October, 1982 Fall maintenance outage." The proposed change is to complete License Condition 2.C(h)(15)(2) by the end of the second refueling outage.
The proposed amendment is provided in Attachment 1.
A discussion of the proposed changes is provided in Attachment 2.
This request has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff.
It has-been determined that this request does not involve an unreviewed safety question as defined in 10 CFR 50.59.
0210010103 820927 PDR ADOCK 05000339 4 h(
().
P PDR O
\\ b
Vinotw A ELECTRIC AND Powna CoxPANY TO Harold R. Denton We have evaluated this request in accordance with the criteria in 10 CFR 170.22.
Since this request involves a safety issue which the staff should be able to determine does not pose a significant hazard consideration for Unit 2, a Class III license amendment fee is required for Unit 2.
Accordingly, a voucher check in the amount of $4000 is enclosed in payment of the required fees.
Very tr ly yours, k
R.11. Leasburg Attachments 1.
Proposed Operating License Amendment 2.
Discussion of Proposed Operating License Amendment 3.
Voucher Check No. 80266 for $4000 cc:
Mr. James P. O'Reilly Regional Administrator Region II
l COMMONWEALTH OF VIRGINIA )
)
CITY OF RICHMOND
)
The foregoing document was acknowledged before me, in and for the City and Commonwealth aforesaid, today by R. H. Leasburg, who is Vice President-Nuclear Operations, of the Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this
??
day of. J As, 19 ? a..
My Commission expires:
A-24 19 p f.
(2,w d. 7h ' n Notary Public (SEAL)
-