Text
-
Action: StelI V ~~
,.f..ns eg%
UNITE D STATES Cys: Gossick NUs dAR REGULATORY COMMISSION j ",,e,'g ( h Rehm
~ j o"
' 'E WASHIN GT ON, D.C. 20555
- % N p/ !
r 5. a..../
July 2, 1979 f
ICE OF THE
..wissioN E R Memorandum for Lee V. Gossick Executive Director for Operations From:
Richard T. Kennedy,.,, 4-0
Subject:
FAILURE OF BACKUP CORE C00LIliC-SYSTEMS AT HATCH Uti!T 2 -- PtiO-79-139 Ati: PHO-79-195 5
Ey riemorandsm dated June 7, I requested by no later than June 15 a report from the staff on the first of the two subject occurrences.
The fact that the same equipment has failed again at the same facility, though perhaps due to a cifferent mechanism, heightens my concerns.
As requested previously, l'would appreciate receiving a report on this matter as soon as possible.
Please advise rc.e by no later than July 3 as to when I can expect to receive such a report, cc:
Chairman Hendrie Com.issioner Gilinsky Com.issioner Bradford Cem.issioner Ahearne A. Kenneke, OPE C. Kammerer, OCA L. Bickwit, OGC J. Fouchard, OPA
- 5. Chilk, SECY O
0210010105 820628 PDR FDIA UDELLB2-261 PDR
. s ig:-.
2.
- f.,-
Ef;CLOSUPE 2
..hme Z8,1979 In Reply Rafar To:
RII:JPO 50-321 SG-355
~
Georgia Power Cons:any Atta:
J. H. Miller, Jr.
Executive Yice President 270 Peachtree Stre6t Atlanta, Georgia 30303 Getl e=en:
Subject:
Confirsation of k; tion This refers to F. J. Long's telephone conversation of June 28,1979, with k*. E. Ehrensperger, Vice President, Engineerins/ Construction, regarding the failure of the High Pressure Coclant Injection (HPCI) and the Reactor Core Isolation Coolant (RCIC) syste=s to perfom as d2U;;ned follwing a reactor trip cc June 27, 1979. With regard to catters discussed, it is our under-ssanding that both Hatch Plant units are shut dw. and that, prior to restart of either unit, the fo11 wing actions riil be cc:eleted tc the satisftetion of the XRC:
Investigate the HPCI aM RCIC failures mM t 1:e corrective actio::s 1.
As a mini:::.=, year investigatics will irclude:
es necessary.
Datarnination of cause of the June 27, 1979, f ailur (s).
a.
A reenluation of previccs failures or abmmal p:rforrances I
b.
associatad with the RCIC aM HPCI syste::s.
Enluation of ceint:cner,ce and repef r activities eM c'hr A:
plant practices which my affect the perfor-.anca of these snte=s.
c.
Establish cmprehensive retesting requir 22ots t6ich verify that the l
2.
EPCI and RCIC syste=s perfom ts designed.
Discussion of the results of your icvestigatics aM retesting progrce l
3.
with this office.
O f
O j )3 t') b !
{ lG A
?.:
_~
[
Georgia Power Company June 28, 1979 Please infort this office innediately if your underst ndtr; ef this satter is different free that stated above.
Sincerely, James P. O'Reilly Director cc:
M. Macry, Plant Manager Post Office Box 442 Euley, Georgia 31513 C. E. Belflower Site SA Supervisor Post Office Bcx 442 Buiey, Georgia 31513.
W. E. Ehrensperger Yice President. Engireriog/Cen:trvction
(
270 Peachtree Street Atlanta, Georgia 30303 bec:
N. C. Moseley, PSI bec:
Local Public tbecent boc:
D. Thompson, XC05 Washincton Public Da: ment b:e Principal Staff Centrai Files Muclear Safety Ir.foration Center U. S. Nuclear Regulatory Ccmission Technical Inforatior Center R. F. Rogers, Resident Inspector IE M il :.nd File Pest Office Box 710 Region 11 Reading Rocru Baxley, Georgia 31513 State of Georgia Hugh S. Jordan, Executive Secretary Georgia Public Pcwer Cc=nission 244 Washington Street, S.W.
Atlanta, Georgia 30334 e