Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20252A248 + (17:05:44, 16 March 2025)
- EPID:L-2020-LLO-0006 + (17:05:50, 16 March 2025)
- ML20252A171 + (17:05:53, 16 March 2025)
- ML20249C845 + (17:06:05, 16 March 2025)
- ML20249C843 + (17:06:07, 16 March 2025)
- ML20249C826 + (17:06:12, 16 March 2025)
- IR 05000482/1998099 + (17:06:16, 16 March 2025)
- TAC:MA1205 + (17:06:50, 16 March 2025)
- ML20249C736 + (17:07:23, 16 March 2025)
- ML20249C733 + (17:07:32, 16 March 2025)
- ML20249C724 + (17:07:37, 16 March 2025)
- ML20249C721 + (17:07:39, 16 March 2025)
- 05000333/LER-1998-005, :on 980529,declared HPCI Inoperable Due to Observed Lower than Normal Output Signal on Flow Controller. Replaced Flow Controller & Declared HPCI Sys Operable on 980530 + (17:07:47, 16 March 2025)
- ML20249C716 + (17:07:56, 16 March 2025)
- IR 05000245/1998207 + (17:09:48, 16 March 2025)
- IR 05000285/1998009 + (17:09:49, 16 March 2025)
- ML20249C685 + (17:09:56, 16 March 2025)
- 05000373/LER-1997-026-01, :on 970715,inadequate Channel Functional Test of Refueling Interlocks Was Discovered.Caused by Procedural Deficiencies.Procedure to Perform Logic Sys Functional Test on Rod Block Logic Will Be Developed + (17:10:03, 16 March 2025)
- 05000306/LER-1998-003-02, :on 980526,discovered Inadequate App R Fire Barriers & Unsealed Fire Barrier Penetrations.Caused by Lack of Adequate Separation of Safe Shutdown Equipment.Firewatch Has Been Established as Compensatory Measure + (17:10:06, 16 March 2025)
- NUREG-0619, Informs That Staff Finds PP&L 980330 Request for Relief from Requirements of Section 4.3 of NUREG-0619,exams of Feedwater Nozzle Bore & Inner Radius for Another Operating Cycle to Be Acceptable + (17:10:09, 16 March 2025)
- IR 07100219/2012024 + (17:10:16, 16 March 2025)
- ML20249C642 + (17:10:28, 16 March 2025)
- ML20249C640 + (17:10:33, 16 March 2025)
- 05000354/LER-1998-004-03, :on 980522,EDG B Declared Inoperable.Caused by Contamination W/Lubrication Oil in Delivered Fuel Oil. EDG Drained,Cleaned,Refilled & Sampled + (17:10:34, 16 March 2025)
- TXX-9815, Forwards Response to Request for Addl Info Re Section 3.6 of Proposed TS Changes in NRC Ltr .Suppl to Ltr to NRC Will Be Provided at Later Date + (17:10:40, 16 March 2025)
- NUREG-1520, Recommends That 980504 Avlis Licensing Process License Application Be One Document W/O Part I/Part II Distinction. Staff Recommended Example of Application & Environ Rept Format,Encl + (17:10:45, 16 March 2025)
- 0CAN069804, Forwards Scenario Package for ANO 1998 Radiological Emergency Preparedness Exercise (REX-98) IAW 60-day pre-exercise Schedule Specified by NRC IP 82302,Exhibit 1. Encl Withheld Until 980819,date of Exercise + (17:10:49, 16 March 2025)
- ML20249C572 + (17:11:43, 16 March 2025)
- ML20249C570 + (17:11:46, 16 March 2025)
- IR 05000440/1998012 + (17:11:49, 16 March 2025)
- ML20249C556 + (17:12:23, 16 March 2025)
- ML20249C555 + (17:12:25, 16 March 2025)
- 05000352/LER-1998-010, :on 980526,identified Two Surveillance Tests Associated W/Rc Recirculation Sys Flow Units A/C & B/D Calibr,Respectively.Caused Attributed to Personnel Error. Units Satisfactorily Tested + (17:12:38, 16 March 2025)
- ML20249C551 + (17:12:48, 16 March 2025)
- ML20249C544 + (17:12:50, 16 March 2025)
- IR 05000352/1998002 + (17:12:51, 16 March 2025)
- IR 05000461/1998007 + (17:12:53, 16 March 2025)
- 05000423/LER-1998-031, :on 980519,incomplete Testing of P-4 Interlock Function Was Noted.Caused by Human Error & Inadequate Procedure Development.Revised Procedure, Ssps Refueling Tests + (17:13:12, 16 March 2025)
- ML20249C525 + (17:13:17, 16 March 2025)
- ML20249C523 + (17:13:19, 16 March 2025)
- TXX-9816, Requests That Southern Technical Services Co Be Removed from NRC Distribution Lists Effective 980626.Util No Longer Obtains Svcs of Company + (17:13:22, 16 March 2025)
- ML20249C513 + (17:13:26, 16 March 2025)
- 05000457/LER-1997-005-01, :on 971106,violation of TS Due to SI Rvs Lifting & Failing to Reseat.Caused by Sys Design Deficiency. Revised Procedures & Evaluated Setpoint Tolerance + (17:13:32, 16 March 2025)
- 05000336/LER-1998-013-01, :on 980526,shutdown Cooling Sys Was Over Pressurized by Inadvertent Hpsip Start.Caused by Inadequate Evaluation in Original Plant Design.Appropriate Actions Were Taken to Ensure Sys Complies W/Design & Licensing Basis + (17:13:35, 16 March 2025)
- IR 05000334/1998001 + (17:13:37, 16 March 2025)
- IR 05000334/1997011 + (17:13:38, 16 March 2025)
- 05000220/LER-1998-012-01, :on 980521,determined That Fire Dampers Installed in Supply & Return Ducts to Auxiliary CR Would Fail Closed as Result of Loop.Caused by Inadequate Evaluation.Modified Affected Fire Dampers + (17:13:40, 16 March 2025)
- IR 05000219/1997011 + (17:13:47, 16 March 2025)
- ML20249C483 + (17:13:52, 16 March 2025)
- L-98-128, Forwards Typed,Final TS Pages for LARs 256/126.Summary Descriptions of Editorial Changes Are Also Provided + (17:13:59, 16 March 2025)
- 05000423/LER-1997-054-01, Forwards LER 97-054-01,re Event Which Occurred at Millstone Unit 3 on 971029.Commitments Made within Ltr,Encl + (17:14:06, 16 March 2025)