Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- B13693, Clarifies 900226 Proposed Rev to Tech Spec 3/4.6 to Permit Containment Pressure to Increase to 14.0 Psia During Modes 1 Through 4 to Reduce Potential for Personal Injury When Entering Containment + (23:58:05, 16 December 2024)
- HL-1397, Forwards Response to IE Bulletin 79-14, Seismic Analysis for As-Built,Safety-Related Piping Sys. Summary Rept Encl + (23:58:06, 16 December 2024)
- ML20065T058 + (23:58:06, 16 December 2024)
- PLA-1290, Forwards Monthly Operating Rept for Aug 1982 + (23:58:07, 16 December 2024)
- ML20065T047 + (23:58:07, 16 December 2024)
- 0CAN088205, Advises That Revision 1 to Contingency Plan Procedure 9 Not Completed.Delay Due to Incorporation of NRC Recommendations Re Inclusion of Agreements of Addl Offsite Support Agencies.Revision Expected by 820917 + (23:58:08, 16 December 2024)
- LIC-90-0980, Forwards Public Version of Epips,Including Rev 1 to FC-EPF-9, OSC 24-H Staffing Schedure, Rev 1 to FC-EPF-10, TSC & Control Room 24-H Staffing Schedule & Rev 1 to FC-EPF-14, Emergency Response.... W/901217 Release Memo + (23:58:08, 16 December 2024)
- 0CAN098210, Suppl 820802 Response to IE Bulletin 82-02, Degradation of Threaded Fasteners in RCPB of PWR Plants. Bolted Closure Leaks Not Complete.Results of Review Will Be Provided by 821108 + (23:58:15, 16 December 2024)
- ML20065T018 + (23:58:22, 16 December 2024)
- ML20065T020 + (23:58:22, 16 December 2024)
- 0CAN098214, Summarizes Interim Actions Taken by Util in Response to IE Bulletin 80-06.Development of Procedures & Guidelines Supporting Regulatory Response Program Being Expedited + (23:58:23, 16 December 2024)
- ML20065T012 + (23:58:24, 16 December 2024)
- ML20065T009 + (23:58:31, 16 December 2024)
- 2CAN098207, Provides Summary Evaluation of Design & Performance of Core During Cycle 3 Operation at 100% Rated Core Power. No Unreviewed Safety Questions Exist + (23:58:32, 16 December 2024)
- ML20065T008 + (23:58:32, 16 December 2024)
- 0CAN038201, Forwards Decription of Design Changes Which Required Safety Evaluation & Were Completed in 1981 + (23:58:40, 16 December 2024)
- 05000318/LER-1981-017, Forwards LER 81-017/03L-0 + (23:58:47, 16 December 2024)
- 05000311/LER-1982-107, Forwards LER 82-107/03L-0.Detailed Event Analysis Encl + (23:58:55, 16 December 2024)
- 05000311/LER-1982-110, Forwards LER 82-110/03L-0.Detailed Event Analysis Encl + (23:58:55, 16 December 2024)
- ML20065S977 + (23:59:03, 16 December 2024)
- ML20065S973 + (23:59:04, 16 December 2024)
- ML20065S974 + (23:59:04, 16 December 2024)
- 0CAN098202, Summarizes 820908 Telcon Re IE Bulletin 82-01,Revision 1, Suppl 1.Bulletin Requires Radiograph Sets of Welds Associated W/Pipe Walls Less than 1/2 Inch & Applies Only to Unit 2 + (23:59:05, 16 December 2024)
- ML20065S971 + (23:59:05, 16 December 2024)
- RBG-13-164, Responds to NRC Re Violations Noted in IE Insp Rept 50-458/82-03.Corrective Actions:Review of All Warehouse Records Performed to Determine If Other Equipment Requiring Maint Had Gone Undetected + (23:59:15, 16 December 2024)
- 05000311/LER-1982-116, Forwards LER 82-116/03L-0.Detailed Event Analysis Encl + (23:59:32, 16 December 2024)
- LIC-90-0983, Responds to NRC Re Violations Noted in Insp Rept 50-285/90-38.Corrective Actions:Hydrostatic Pressure Test Will Be Performed on Applicable Sections of Piping During 1991 Refueling Outage to Establish Pressure of 395 Psig + (23:59:49, 16 December 2024)
- ML20065S935 + (23:59:57, 16 December 2024)
- LIC-90-0982, Forwards Response to Generic Ltr 90-06, PORV & Block Valve Reliability;Addl Low Temp Overpressure Protection for Lwrs. Both PORV & Block Valves Tested in Inservice Test Program + (23:59:58, 16 December 2024)
- ML20065S924 + (00:00:19, 17 December 2024)
- ML20065S917 + (00:00:20, 17 December 2024)
- ML20065S912 + (00:00:36, 17 December 2024)
- 05000272/LER-1982-075, Forwards LER 82-075/03L-0.Detailed Event Analysis Encl + (00:00:37, 17 December 2024)
- ML20065S903 + (00:00:45, 17 December 2024)
- 05000373/LER-1982-121, Forwards LER 82-121/01T-0 + (00:00:52, 17 December 2024)
- ML20065S897 + (00:00:53, 17 December 2024)
- 05000318/LER-1981-020, Forwards LER 81-020/03L-0 + (00:00:54, 17 December 2024)
- 05000272/LER-1982-072, Forwards LER 82-072/03L-0.Detailed Event Analysis Encl + (00:01:02, 17 December 2024)
- ML20065S888 + (00:01:02, 17 December 2024)
- ML20065S878 + (00:01:09, 17 December 2024)
- ML20065S869 + (00:01:22, 17 December 2024)
- 05000318/LER-1981-021, Forwards LER 81-021/03L-0 + (00:01:23, 17 December 2024)
- 05000265/LER-1982-017, Forwards LER 82-017/03L-0 + (00:01:24, 17 December 2024)
- ML20065S864 + (00:01:24, 17 December 2024)
- ML20065S861 + (00:01:25, 17 December 2024)
- ML20065S859 + (00:01:25, 17 December 2024)
- ML20065S850 + (00:01:33, 17 December 2024)
- ML20065S856 + (00:01:33, 17 December 2024)
- ML20065S843 + (00:01:34, 17 December 2024)
- ML20065S848 + (00:01:34, 17 December 2024)
- 05000331/LER-1982-065, Forwards LER 82-065/03L-0 + (00:01:35, 17 December 2024)