ML20065T008

From kanterella
Jump to navigation Jump to search
Advises of Change Re Onsite Emergency Response Organization to Be Reflected in Revision 2 to Radiological Emergency Response Plan
ML20065T008
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/28/1982
From: Tauber H
DETROIT EDISON CO.
To: Kintner L
Office of Nuclear Reactor Regulation
References
EF2-60-310, NUDOCS 8211020136
Download: ML20065T008 (1)


Text

Vc res Engincenng and constNct:en Deholt Edison EEEF">>e October 28, 1982 EF2 - 60,310 Mr. L. L. Kintner U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Licensing Washington, D. C. 20555

Dear Mr. Kintner:

Reference:

Enrico Fermi Atomic Power Plant, Unit 2 NRC Docket No. 50-341

Subject:

Radiological Emergency-Response Plan Section B Onsite Emergency Organization Table B.1 Staffing for Fermi 2 Emergency Response Organization The augmentation times of 30/90 listed in the last two columns of Table B.1 under Alert or Above and Site Area or General Emergency will be changed to 30/60(a) with a change in Footnote (a) to read:

(a)

The 30/60 augmentation criteria is a goal for staffing the ERFs on a timely basis as stated in Subsection B.1.2 on Page B-2 and as iden-tified in Supplement 1 to NUREG-0737 This change will be reflected in Revision 2 to the Plan.

Sincerely, f/

cc:

Mr. B. Little 8211020136 021028 PDR ADOCK 05000341 F

PDR l