ATTACHMENT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50/395 UNIT NAME V.C. Summer I DATE 09-08-82 COMPLETED BY G. J. Taylor TELEPHONE (803) 345-5209 Virgil C. Summer Nuclear Station Unit No.1 received its Operating License on August 6, 1982. Initial Fuel Load commenced at 1120 hours0.013 days <br />0.311 hours <br />0.00185 weeks <br />4.2616e-4 months <br /> on August 10 and was completed at 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br /> on August 13. This was followed by Reactor Vessel Head assembly and entry into Mode 5 on August 17, 1982. Rod Drive Mechanism Timing tests were performed on August 26.

At 1625, August 27, an inadvertent safety injection occurred on Steamline High Differential Pressure due to testing being performed on one channel, and another channel being lost due to de-energizing the associated 120V AC bus during inverter transfer operation. As a result of the safety injection, one of the pressurizer power operated relief valves, which was in the cold overpressure mode of operation, opened as required. This caused the pressurizer relief tank to be overfilled, thus resulting in its rupture disc being ruptured with approximately 3000 gallons of water being relieved to the Reactor Building Sump.

Rod Drop Time Measurements at No Flow conditions were performed on August 28.

Rod Drop Time Measurements at Full Flow conditions commenced on August 28 and were concluded on August 29.

Incore Movable Detector System checkout commenced August 31.

CK05hhhk PDR

ATTACINENT II OPERATING DATA REPORT DOCKET NO.

50/395 UNIT V. C. Summer I DATE 09-08-82 G. J. Taylor COMPLETED BY TELEPHONE (803) 345-5209 OPERATING STATUS August 1982 GROSS HOURS IN REPORTING PERIOD: 612

1. REPORTING PERIOD:

2775 max. DEPEND. CAPACITY (MWe Net): N/A

2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 900 DESIGN ELECTRICAL RATING (MWe-Net):

N/A - 5% MWe

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
4. REASONS FOR RESTRICTION (lF ANY):

The Operating License allows operations up t THIS MONTH YR TO DATE CUMULATIVE 5% MWe for Low Power Testing

5. NUMBER OF HOURS REACTOR WAS CRITICAL ... .........

0

. 6. REACTOR RESERVE SHUTDOWN HOURS . . .

0 0 0

7. HOURS GENER ATOR ON LINE . . . . . . ............ . ...

0 0 0

8. UNIT RESERVE SHUTDOWN HOURS ........... . .. ....

0 0 0

9. GROSS THERMAL ENERGY GENERATED (MWH) ... .... .

0 0 0

10. GROSS ELECTRICAL ENERGY GENERATED (MWH) . . . . .. . .
11. NET ELECTRICAL ENERGY GENERATED (MWH) ... ... ...

N/A N/A N/A

12. REACTOR SERVICE FACTOR . . . . . .....................
13. REACTOR AVAILABILITY FACTOR , . . . . . .......... .....

N/A N/A N/A

14. UNIT SERVICE FACTOR . .... ...... .......... ....

!^

15. UNIT AVAILABILITY FACTOR . ... .................

N/A N/A N/A

16. UNIT CAPACITY FACTOR (Using MDC) . ... .... ....

N/A N/A N/A

17. UNIT CAPACITY FACTOR (Usmg Design MWel . ............ .

N/A N/A N/A

18. UN6T FORCED OUTAGE RATE . ....... ... .. .....
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACHl:

D-3 Steam Generator Modification - November,-1982 thru January,1983

20. IF SHUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:

N/A

21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED

~

\

INITI AL CRITICALITY g7/82 INITIAL ELECTRICITY 11/1/82 COMMERCI AL OPER ATION

ATTACINENT III DOCKET NO. 50/395 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME v.C. summer I 09-08-82 I) ATE COMPLLTED BY G. J. Taylor AUGUST. 1982 TELEPIlONE (803) 345-5209 l REPORT MONTil METHOD OF

TYPE SHUTTING DOWN F
FORCED DURATION THE REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER (2) CORRECTIVE ACTIONS / COMMENTS 1 820806 S 612.0 B 4 -

Initial Plant Startup

?

I i.

ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL 4

DOCKET NO. 50/395 UNIT v. c, summer I DATE 09-08-82 COMPLETED BY G. J. Taylor i TELEPHONE (803) 345-5209

/

l MONTH AffCf!RT 1987 DAY AVERAGE I Y P WER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

I 17 0 18 . 0 3 0 1g 0 4 0 0

' 21 0 0 0 6 n 7 23 0 8 0 0 24 9 0 0 3

10 0 0 26 11 0 g 0 12 0 0 28 13 0 0 -

29 14 0 g ,_

31 0 ,

16 o l