/ OPERATING DATA REPORT
.I I
y
, d.
s f.
/
t
"~
Q' I~
DOCKET NO. 50 166
' '.p **
DATES i1-10-80_.
T..c y P. R. Underwood
- E y'
. COMPLETED BY 912-367-7781 t
t i x
)
TELEPftONE 1
N e
T 3
1.
1 OPERATING stall)5 s
l Notes Cumulative totals in Hatch 2
- 1. Unit Name:
numbers 17. and 18. reflect;
,1
- 10-80 an adjustment of 130 MWe.
? ' 2. Reptrting Pe'riod: _
2436 3.' Ltrensed Thermal Power (MWt):
This adjustment is due to
' I 817.0 a typographical error in m 4. f4raeplete Rating (Gross MWel:
784.0 2.
09-80 report.
- 5. Design Electrial Rating (Net MWeJ:
805.7
~"
- 6. Maximum Dependable Capacity (Gross MWy _
772.7
- 7. blaximum Dependable Cap.p-ity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Re
/
e es(
.y
- 9. Powee LevelTo W5:ich Restricted.If Any (Net MWe):
I
, 10. Reasons For Restrictions. If.Ory!-
^
i
=
g
,g
' This Month Tr to'-Date Cumulative s
I~
745 7320 10153 P
8230.7
- 11. Hours ta Reportin5 eriod 717.1 5567.2 _
0.0
- 12. Niamber Of Houn Resetor Was Critical 0.0 5271.0 7685.5 0.0 _
~
- 13. Reactor Reserve Shuidswri Hours 697.6 0.0 0.0 14.' Hours Generator On Line 0.0 11601014 17095076
't}
- 15. Unit Reserve Shutdownhours i
1494254 5666610
- 16. CrossThermal Energy GeneratedjMWH) 483290
._,0 3830650
- 17. Gross Electrical Energy Generated (MWHI 3650398 5407535 461051 J
- I
- 18. Net Electrical Energy Generated (MWH) 72.0 75.7 93.6 y
75.7
- 19. Unit Service Factor 93.6 72.0
' 21. Unit Capacity Factor (Using MDC Net).
80.1 64.5 68.9
- 20. Unit Availability Factor 63.6 67.9 78.9
+w 11.8_
~ 22. Unit Capacity Factor IU>ing DER Net) 6.4 12.4 _
23, Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each):
s_
~
25.,if Shut thiwn At End Of Report Period. Estimated Date of Startup:
Achiesed Forecast
~ '6. Units in Test Status IPrior in Commercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COM\\tERCIAL OPER ATION 8211020146 801110 V'lil)
PDR ADOCK 05000366 i
-R PDR e
- ~-m--n,
AVERAGE DAILY UNIT POWER LEVEL 9
DOCKET NO.
50-366 UNIT
- Hatch 2 DATE 11-10-80 COMPLETED BY P. R. Underwood 912-367-7781 TELEPHONE.
i a
MONTH 10-80 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe. Net) 1 10f3 17 694 2
548 18 665 3
605 39 745 4
741 20 747 5
768 21 746 771 22 673 7
780 23 510 8
754 8
24 9
118 25 474 10
' "S43 26 761 1I 524 27 706 12 709 28 737 13 740 29 731 14 678 730 30 IS 719 33 670 16 709 i
INSTRUCTIONS l
On this format. list the average daily unit power leve' :n MWe Net for each day in the reporting inonth. Compute io the nearest whole inegawatt.
(W77) 1 I
- ~....... ~..
DOCKET NO.
Sn-166 j
UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT N A\\lE _l'Ltd _2 I
DAT E di-1"-"O 1} gp COM LE D P
10-80 REPORT MONTH "L.
a Licensee Eg E ".,
Cause & Currective
u
=
.! E
}.$ E E-Action to
[}
Nos.
Date 1
3g g&
Event u '2 j
Prevent Recurrence N
$E 5
ji%
Report #
$0 40 801001 F
10.5 A
5 t{A HC HTEXCH Unit on startup ramp from p'revious shutdown #80-38 41.
801001 F
11.1 A
1 NA HA VLAVEX Rx scram due to TSV closure which i
tripped turbine on HWL j
42 801001 F
13.4 A
5 NA HA VAL EX Unit on startup ramp'from above shut-down #80-41 i
NA RB.
CONRb0 Reduced load in order to perform a l
43 801003 F
15.5 0
5.
rod pattern adjustment 44 801008 F
6.3 A
5 NA CH HTE)(CH Reduction of load because of problems with feedwater heaters I
45 8001009 F
15.7 A
1 NA HH PUMPXX Rx scram due to condenser booster pump trip on low suction which tripped l
the RFPs 3
4
~
I 2
Method:
Exhibit G Instructione F: Forced Reason:
S: Scheduled A lhuipment Failure (Explain) 1 Manual for Preparation of Data B4taintenance of Test 2 Manual Scram.
Entry Sheets for Licensee 3 Automatic Scram.
Event Report (LER) File INUREG-C-Refueling D Regulatory Restriction 4 -Continuations 0161)
E Operatur Training & Ucense Examination 5-Load Reduction 5
F Administtative 9-Other (Explain)
Exhibit I Same Sourse G4perational Error (Explain)
(9/77) liether(Explain)
~
O I
ET UNIT SilUTDOWNS AND POWER REDUCTIONS DATE _ ' l-14-: 0 COMPLETED BY P.J t tndminti REPORT MONT11 10-80 TELEPilONE 912.%/-//81 r.
h Cause & Currective / l b=
EE "5
E3 Licensee Eg E".,
3s5 Event u'!
E"E Action to N.i.
Date
{
- 7. g AU Psevent Recurrence
$5 5
gi$ g Report #
a 46 8b1009 F
49.8 A
5 NA HC HTEXCH Unit'on startup ramp from above shut-down #80-46 47,
801017 F
8.6 D
5 NA RB CONR00 Reduced load in order to perform a
~
rod pattern adjustment 48
, 801022 F
14.6 A
5 NA HC HTEXCH Reduced load to investigate possible tube failure in condenser
~
49 801023 F
5.6*
A 5
NA HF.
HTEXCH Reduced load to repair leak in water-box 50 80'1024 F
20.6 A
3 NA HF HTEXCH Unit off line and shutdown to repair leak in waterbox 51 801025 F
23.6 A
5 NA HF HTEXCH Unit on startup ramp from above shut-down #80-50 4
d' 3
I 2
Method:
Exhibit G. insituctions F: Forced Reason:
I Manual for Preparation of Data A L ulpment Failure (Explain) i 2 Manual Scram.
Entry Sheets for Licensee S: Scheduled B Maintenance or Test Event Report (LERI Fife (NUREG-3.Automati: Scram.
C. Refueling 4 -Continuations 0161)
D Regulatury Restriction E-Operatur Training & Ucense Examina:Iun 5-Ioad Peduction 5
F. Administrative 9-Other (Explain)
Exhibit I.Same Source G4perational Error (Explain)
(9/77) liether(Expl In)
DOCKET NO.
50-166 I
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME HAh 2 DATE lMl "O COMPLETED BY P. 11 Imo m nod REPORT MONTH 10-80 TELEPilONE 919-367-7781 l
i Cause & Currective /
.! ?
]Yk Licensee k%
l u
'8 Action to N.6 Dale
{
g=
g&
Event A}
ju o$
jifs Report #
j Prevent Recurrence i
j 52 801031 S
5.3 C
5 NA ZZ ZZZZZZ Reduced load to shutdown for refuel-outage i
I l
A t
..a l
2 3
4 F: Forced Reason:
Method:
Exhibit G Instructions S: Scheduled A Equipment Failure (Explain)
I-Manual for Preparation of Data B. Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction 4 -Continuations Ol6I)
Eoperator Training & Ucense Examination 5-Load Reduction 5
F Administrative 9-Other (Explain)
Exhibit 1 Same Source Goperallonal Ervor(Explain}
(9/71)
Hethet(Emplain)
F NARRATIVE REPORT UNIT 2 m
Oct. 1st Unit on startup ramp from previous
- shutdown,
- 80-38.'.
Oct. 1st At 10:30 Rx scram due to TSV closure which tripped the turbine on HWL Oct 1st Unit on startup ramp from above shutdown; Rx critical at 16:23 and generator on line at 21:37; unit returned to 80% rated conditions at 11:00 on 801002 Oct 3rd Reduced load in order to perform a rod pattern adjustment Oct. 8th Reduced load at 21:45 because of problems with the FWHs Oct. 9th At 04:03, Rx scram due to condenser booster pump t
trip on low suction which tripped the RFPs Oct. 9th Unit on startup ramp from above shutdown; Rx critical-at 13:18 and generator on line at 19:45; unit returned to 80% conditions at 21:30 on 801011 Oct. 17th Reduced load in order to perform a rod pattern adjustment Oct. 22nd Reduced load in order to investigate possible i
tube failure in condenser; no leak found; un'it returned to 80% conditions at 10:00 on 801023 l
Oct. 23rd Reduced load to repair leak in waterbox Oct. 24th Unit off line at 01:07 in order to repair leak in waterbox; Rx in H/S at 02:15 Oct. 24th Unit on startup ramp from above shutdown; Rx critical at 15:00 and generator on line at 21:40; unit returned to 80% conditions at 21:15 on 801025 Oct. 31st Reduced load going to shutdown for a scheduled refueling outage There was no single release of radioactivity, or single radiation exposure which accounts for more than 10% of the allowable annual values during October of 1980.
e
--i----.
HATCH 2 SAFETY - RELATED MAINTENANCE REQUESTS
~
TO BE REPORTED FOR OCTOBER 1980 m
NUMBER DATE COMPLETED DESCRIPTION au-sza2 10-27-80 RHR/SW pump seal water line had e
developed leak; placed line back in proper fitting and tightened to stop leak 80-4177 10-23-80 IRM/APRM recorder motor and bad amplifiers were replaced to place recorder back in service 80-4182 10-24-80 Repaired PSW Div II pressure indicator; replaced output transmitter and calibrated 80-4129 10-24-80 Replaced alarm point card and white bulbs in the turbine oil tank level hi-low ' alarm; alarm lights had been found burnt out 80-4178' 10-22-80 High flow d/w floor drain sump annunciator was not functioning properly.
Replaced bad alarm card and verified proper operation 80-4139 10-23-80 High flow d/w floor sump annun-ciator would not test properly; replaced point card and verified operation 80-4058 10-20-80 Chemical waste sample tank "A"
discharge valve to floor drain demin was found to be stuck and not working proper; repaired valve and verified operation 80-3966 10-20-80 Suspected D/G "2A" jacket coolant temp low annun. lights were out;
- however, upon investigation they.
l were functioning properly l 3325 10-20-80 Replaced nitrogen supply storage j
I tank safety relief valve because previous valve was found lifted 80-4002 10-13-80 Repaired loose connection on N11-R602B; Loose connection was causing erratic readings
\\
t 4
m v.
,r.my, v.
,w
80-3951 10-15-80 Celibrated Hil-P601 because instrument was abnormally alarming
'80-3948 10-14-80 Main steam 3rd stg. SJAE "A"
flow 3 low
- 1 arm was not testing
- properly; replaced point card and verified operation 80-3947 10-15-80 Control b1dg after cooler B001A disch. temp. high alarm would not reset; found card not making good contact; repositioned card ad verified alarm operations 80-2952, 10-11-80 Valve T48-F323J failed to open prop'erly during test; replaced solenoid and air line tubing 80-3632 10-13-80 Calibrated containment H02 2
analyzer and verified operation 80-3874 10-13-80 calibrated RWOU "B" dP guage b
80-3847 10-13.-80 2B RWCU pump was found blowing steam and water; pump was disassembled and the bearing and mechanical seals were replaced; pump was rebuilt and placed back in service 80-2864 10-9-80 Adjusted torque limit switch on main steam line drain MOV.
80-2770 10-7-80 Replaced lead and lag switch on motor starter. for rec.laim pump; i
verified pump operation 80-3658 10-4-80 Replaced 1st level multiplexer card in "A"
rod block monitor; monitor had been erratically going inop; verified operation 80-3935 10-8-89 Replaced alarm card on gen "B"
aux lockout alarm; verified operation 80-3857 10-3-80 Found valve on HCU-26-51 leaking; replaced valve 80-3330 10-4-80 Repaired fuel pool gate seal; replaced them and installed a
check valve on the a,ir supply to them
\\
i e
80-3824 10-7-80 Inspected alignment of diesel generator "A"
pe r _ Fairbanks Morse Company 80-3825 10-7-80 Inspected alignment of.
diesel 9, generator "C"
per Fairbanks Horse Company 80-1266 9-29-80 Performed wiring change to RCIC vacuum and condensate pump motors pe-r DCR 80-26 80-3835 9-30-80 Added 2
additional supports and removed 1
existing support to/from PSW Div I supply piping per DCR 80-342 80-4060 10-20-80 Removed safety-relief valve to verify setpoint; replaced valve after check 80-4141 10-28-80 Removed valve operator and tightened face plate to alleviate looseness in precoat inlet isolation valve 80-4202 10-26-80 Replaced limit switches on "E"
~
. valve on "A" RWCU demin 80-4199 10-29-80 Found condensate flush valve for WSPS "B"
leaking by; replaced set screw and repositioned stem so valve would set properly 80-4224 10-29-80 Valve T48-F324 0-rings were repaired; cleaned 0-ring surfaces and replaced 0-Rings 80-2852 10-30-80 Replaced 2 gate driver cards in LPCI inverter 4
e e
=
- e
=