Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20067A896 + (16:38:55, 16 December 2024)
- 05000440/LER-1991-003, :on 910106,performance of Inadequate Procedure Resulted in Main Steam Line Drain Isolations.Caused by Procedure Deficiency.Instruction Revised to Include or Ref Steps to Bypass MSL Radiation Monitors + (16:38:56, 16 December 2024)
- ML20067A874 + (16:38:57, 16 December 2024)
- ML20067A860 + (16:38:58, 16 December 2024)
- ML20067A855 + (16:38:59, 16 December 2024)
- ML20067A859 + (16:38:59, 16 December 2024)
- ML20067A854 + (16:39:00, 16 December 2024)
- ML20067A850 + (16:39:00, 16 December 2024)
- ML20067A848 + (16:39:01, 16 December 2024)
- ML20067A843 + (16:39:02, 16 December 2024)
- ML20067A847 + (16:39:02, 16 December 2024)
- ML20067A840 + (16:39:03, 16 December 2024)
- 05000373/LER-1982-137-03, /03L-0:on 821026,both Reactor Recirculation Pumps Received Downshift Signal.Pump 1A Downshifted,But Pump 1B Did Not Pick Up in Slow Speed & Drifted to Stop,Resulting in Tripping of Pump 1A.Caused by Feedwater Low Flow Transi + (16:39:05, 16 December 2024)
- ML20067A837 + (16:39:09, 16 December 2024)
- ML20067A836 + (16:39:10, 16 December 2024)
- ML20067A833 + (16:39:11, 16 December 2024)
- 05000373/LER-1982-137, Forwards LER 82-137/03L-0 + (16:39:15, 16 December 2024)
- 05000373/LER-1982-138-03, /03L-0:on 821026,LITS-1B21-N026A Level Switch Failed to Perform Design Function.Caused by Misalignment of Micro Switch W/Actuating Device Preventing Proper Operation. Switch Realigned + (16:39:17, 16 December 2024)
- 05000373/LER-1982-138, Forwards LER 82-138/03L-0 + (16:39:18, 16 December 2024)
- ML20067A800 + (16:39:18, 16 December 2024)
- ML20067A780 + (16:39:19, 16 December 2024)
- RBG-34407, Forwards Rev 0 to Topical Rept EA-CA-91-0001-M, Steady State Core Physics Methods for BWR Design & Analysis for Review & Approval.Rept Submitted,Per 900712 & 1218 Meetings W/Nrc + (16:39:23, 16 December 2024)
- 05000316/LER-1982-088-03, /03L-0:on 821029,containment Sample Isolation Valve ECR-21 Would Not Cycle.Caused by Defective Solenoid Coil.Coil Replaced + (16:39:26, 16 December 2024)
- 05000316/LER-1982-088, Forwards LER 82-088/03L-0 + (16:39:27, 16 December 2024)
- ML20067A728 + (16:39:28, 16 December 2024)
- 05000412/LER-1994-001-01, :on 940115,CR Received Channel D RWST lo-lo Level Bistable Indication as Result of Transmitter Sensing Lines Freezing Due to Low Ambient Temps.Load Reduction Commenced,Per TS 3.0.3 + (16:39:29, 16 December 2024)
- ML20067A712 + (16:39:30, 16 December 2024)
- 05000328/LER-1982-125-03, /03L-0:on 821029,essential Raw Cooling Water Effluent Line Radiation Monitor O-RM-90-134/141 Found Inoperable Due to Sample Flow Loss.Caused by Normal Wear of Motor Coupling in Monitor Pump.Coupling Replaced + (16:39:32, 16 December 2024)
- 05000328/LER-1982-125, Forwards LER 82-125/03L-0 + (16:39:33, 16 December 2024)
- ML20067A695 + (16:39:33, 16 December 2024)
- ML20067A686 + (16:39:34, 16 December 2024)
- ML20067A687 + (16:39:34, 16 December 2024)
- 05000324/LER-1982-129-03, /03L-0:on 821028,while Verifying Rod Drive Coupling for Rod 18-07,rod Overtravel Annunciator Received. Cause Unknown.Rod Will Be Inspected for Irregularities During Next Scheduled Control Rod Drive Rebuilding Outage + (16:39:36, 16 December 2024)
- ML20067A683 + (16:39:37, 16 December 2024)
- 05000324/LER-1982-129, Forwards LER 82-129/03L-0 + (16:39:39, 16 December 2024)
- ML20067A671 + (16:39:39, 16 December 2024)
- LD-94-009, Forwards Amend U to C-E SSAR-Design Certification + (16:39:40, 16 December 2024)
- ML20067A660 + (16:39:44, 16 December 2024)
- ML20067A652 + (16:39:47, 16 December 2024)
- ML20067A647 + (16:39:51, 16 December 2024)
- ML20067A646 + (16:39:51, 16 December 2024)
- ML20067A644 + (16:39:53, 16 December 2024)
- ML20067A641 + (16:39:54, 16 December 2024)
- 05000296/LER-1982-052-03, /03L-0:on 821103,CAM 3-RR-90-256 (Drywell Atmosphere Monitor) Became Inoperable.Caused by Sample Pump Failure Due to Normal End of Svc Life.Schwitzer Series 325 Vacuum Pump Rebuilt & Returned to Svc + (16:39:56, 16 December 2024)
- ML20067A638 + (16:39:56, 16 December 2024)
- ML20067A634 + (16:39:57, 16 December 2024)
- ML20067A633 + (16:39:58, 16 December 2024)
- ML20067A626 + (16:39:59, 16 December 2024)
- 05000296/LER-1982-052, Forwards LER 82-052/03L-0 + (16:40:00, 16 December 2024)
- ML20067A623 + (16:40:01, 16 December 2024)
- 05000334/LER-1994-001, :on 940109,required Plant Shutdown Occurred Due to Inoperable Train of Recirculation Spray Hxs.Caused by Inaccurate Indications.Unit Was Shutdown & a Train Heat Exchangers Cleaned + (16:40:02, 16 December 2024)