ML20067A671
| ML20067A671 | |
| Person / Time | |
|---|---|
| Site: | Bellefonte |
| Issue date: | 11/24/1982 |
| From: | Mills L TENNESSEE VALLEY AUTHORITY |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8212020149 | |
| Download: ML20067A671 (2) | |
Text
f*
9 TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 374ot 400 Chestnut Street Tower II November 24, 1982 BLRD-50-438/82-75 3
BLRD-50-439/82-69 a
z
,f 0 9
U.S. Nuclear Regulatory Commission Region II h
'2 Attn:
Mr. James P. O'Reilly, Regional Administrator
~
101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Y
Dear Mr. O'Reilly:
BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - FAILURE TO PERFORM ANALYSIS CHECKS ON IS0 METRICS AND LOAD TABLES - BLRD-50-438/82-75, BLRD-50-439/82 FIRST INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector R. V. Crlenjak on October 26, 1982 in accordance with 10 CFR 50.55(e) as NCR BLN CEB 8215. Enclosed is our first interim report. We expect to submit our next report by March 22, 1983 If you have any questions concerning this matter, please get in touch with R. H. Shell at FIS 858-2688.
Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Licensing Enclosure cc:
Mr. Richard C. DeYoung, Director (Enclosure)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Q
es --
- ,91 agh2ggghfo$$%$
f s
An Equal Opportunity Employer
.~.
ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 FAILL'RE TO PERFORM ANALYSIS CHECKS ON IS0 METRICS NCR BLN CEB 8215 i
BLRD-50-438/82-75, BLRD-50-439/82-69 10 CFR 50.55(e)
FIRST INTERIM REPORT f
j Description of Deficiency I
Problems N4-1KE-F, N4-2KE-F, N4-1NK-B, and N4-2NK-B, isometrics drawings t
and load tables were signed out and issued before the analysis check was performed. On problems N4-1KE-F and N4-2KE-F, the analysis check has now I
been performed and several analysis errors have been found which are significant. Problems N4-1NK-B and N4-2NK-B have not been checked at this 4
time. The cited isometrics and load tables are used in the design of essential raw cooling water pipe supports and reactor coolant drains and vents system supports.
Interim Progress On problems N4-lKE-F and N4-2KE-F, the discrepancies have not been resolved because the related analysis error (documented on NC,R BLN CEB 8209) has not
.been resolved. When a resolution is obtained on the related deficiency then the checking deficiency of this NCR will be addressed and resolved.
Problems N4-1NK-B and N4-2NK-B are being scheduled for checking at this time.
TVA is evaluating this deficiency to determine if prograianatic deficiencies exist and need to be addressed.
i w
e e
O t
l i
-