Interim Deficiency Rept Re Discrepancies in Dynamic Analysis in Small Bore Piping.Initially Reported on 821026.Audit of Simplified Dynamic Analysis Procedures Continuing.Next Rept Will Be Submitted by 830228
ML20067A728
Person / Time
Site: Zimmer
Issue date: 11/19/1982
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, QA-2120, NUDOCS 8212020225
Download: ML20067A728 (2)


Text

-

a f

aga, - !-$

"3

~

4e ze m, THE CINCINNATI GAS & ELECTRIC COMPANY

-=

CIN CINN ATI,O HIO 4 52of November 19, 1982 QA-2120 E. A. BORGM ANN SENIOR VvCE PRESIDENT U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention:

Mr. J. G. Keppler Regional Administrator RE:

WM. H. ZIMMER NUCLEAR POWER STATION UNIT I 10CFR50.55(e) - ITEM M-66, DISCREPANCIES IN DYNAMIC ANALYSIS IN SMALL BORE PIPING DOCKET NO. 50-358, CONSTRUCTION PERMIT NO.

CPPR-88 W.O. #57300 JOB E-5590 FILE NO. NRC-8, M-66 Gentlemen:

This letter constitutes an interim report concerning the subject condition initially reported to the Commission on October 26, 1982 as a potentially reportable deficiency under 10CFR50.55(e). At that time, it was identified that possible misapplications of the Simplified Dynamic Analysis (SDA) pro-cedures were being reviewed.

After being notified of the possible misapplications CC&E initiated an audit of the SDA criteria, development and appli-cations. The audit disclosed ths-some requirements of the S&L quality assurance program were nor complied with.

Contrary to the S&L Quality Assurance Procedure implementing 10CFR Part 50, Appendix B Criterion III, support calculations for the SDA procedure were not reviewed and approved as required.

Engineering justifications for all parameters used to support these calculations were not available. At this time, the significance of this condition is indeterminate as extensive engineering analyses are required to provide a definitive evaluation.

Stop Work Order #82-07 has been issued for SDA design and for installations designed using SDA.

Audits of the SDA support work will be continued until all facets of the SDA development cal-culations are available and are verified.

The audits related to 71 27 8212O20225 821119 gDRADOCK 05000358 NOV 2 6 E62 PDR

4

  • h Mr. J. G. Keppler Regional Administrator November 19, 1982 QA-2120 Page 2 this concern will be completed as the associated engineering act-ivities are completed. A follow-up report will be submitted by February 28, 1983.

We trust the above will be found acceptable as a final report under 10CFR50.55(e).

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By E. A. BORGMANN SENIOR VICE PRESIDENT FKP:ple cc: NRC Of fice of Inspection & Enforcement Washington, D.C.