Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20070F030 + (14:46:52, 16 December 2024)
- ML20070F018 + (14:46:52, 16 December 2024)
- ML20070F017 + (14:46:53, 16 December 2024)
- ML20070F012 + (14:46:53, 16 December 2024)
- ML20070F009 + (14:46:54, 16 December 2024)
- ML20070F006 + (14:46:55, 16 December 2024)
- ML20070F003 + (14:46:55, 16 December 2024)
- ML20070E998 + (14:46:56, 16 December 2024)
- ML20070E996 + (14:46:56, 16 December 2024)
- ML20070E984 + (14:46:57, 16 December 2024)
- ML20070E979 + (14:46:58, 16 December 2024)
- ML20070E970 + (14:47:01, 16 December 2024)
- 05000338/LER-1982-069-03, /03L-0:on 821110,in Mode 5,pressurizer PORV Previously Blocked Open Found Closed.Caused by PORV Block Not Adequately Secured During Installation.Block Reinstalled + (14:47:03, 16 December 2024)
- ML20070E960 + (14:47:05, 16 December 2024)
- U-601803, Forwards Rev 21 to Illinois Power Nuclear Program QA Manual. Rev Evaluated by Util as Not Reducing Quality Program Commitments + (14:47:05, 16 December 2024)
- ML20070E947 + (14:47:06, 16 December 2024)
- ML20070E944 + (14:47:06, 16 December 2024)
- 05000338/LER-1982-069, Forwards LER 82-069/03L-0 + (14:47:07, 16 December 2024)
- 05000382/LER-1991-001-03, :on 910203,steam Generator 2 Low Pressure Setpoint Determined to Be Out of Tolerance & Channel B Not Placed in Bypassed or Tripped Condition within 1 H.Caused by Personnel Error.Personnel Counseled + (14:47:09, 16 December 2024)
- ML20070E912 + (14:47:10, 16 December 2024)
- ML20070E918 + (14:47:10, 16 December 2024)
- 05000455/LER-1990-002-02, :on 900714,feedwater Isolation Signal from Train B Reactor Trip Generated When Reactor Trip Closed. Caused by Cell Switch Which Houses 33a Contacts.Reactor Trip Breaker Replaced + (14:47:12, 16 December 2024)
- 05000369/LER-1982-077-03, /03L-0:on 821105,eight Procedure Change Cards of Each Reactor Protection Sys Channel Omitted from Overlap Testing.Caused by Inadequate Procedures.Omitted Cards Calibr & Procedural Changes Approved + (14:47:14, 16 December 2024)
- 05000336/LER-1990-016, :on 901009,inadvertent ESAS Actuation of Containment Purge Isolation Sys Occurred.Caused by Loose Ground Wire in Control Room Cabinet S14D.Ground Wire Termination Tightened + (14:47:16, 16 December 2024)
- ML20070E892 + (14:47:17, 16 December 2024)
- ML20070E901 + (14:47:17, 16 December 2024)
- 05000369/LER-1982-077, Forwards LER 82-077/03L-0 + (14:47:18, 16 December 2024)
- TXX-9105, Forwards RXE-91-001, Transient Analysis Methods for Comanche Peak Steam Electric Station Licensing Applications. Util Will Employ Methods to Analyze non-LOCA Described in Chapter 15 of FSAR + (14:47:18, 16 December 2024)
- 05000413/LER-1991-004, :on 910105,18-month Channel Calibr on RCS Radiation Monitor 1EMF48 Missed.Caused by Incorrect Computer Entry.Monitor Declared Inoperable,Channel Calibr Performed & Monitor Returned to Svc + (14:47:23, 16 December 2024)
- ML20070E864 + (14:47:24, 16 December 2024)
- ML20070E870 + (14:47:24, 16 December 2024)
- ML20070E850 + (14:47:25, 16 December 2024)
- ML20070E855 + (14:47:25, 16 December 2024)
- ML20070E845 + (14:47:26, 16 December 2024)
- 05000324/LER-1990-017, :on 901023,half Trip Signal,Half PCIS Group 1 Isolation Signal & Group 6 Isolation Occurred.Caused by Failure of Kepco Power Supply in Numac Lvps to Radiation Monitor B.Numac Lvps Replaced + (14:47:28, 16 December 2024)
- ML20070E836 + (14:47:32, 16 December 2024)
- ML20070E823 + (14:47:33, 16 December 2024)
- ML20070E830 + (14:47:33, 16 December 2024)
- ML20070E819 + (14:47:34, 16 December 2024)
- 05000440/LER-1994-015, :on 940609,plant Operator Reported That ESW Loop Keepfill Pressure Less than Required Due to Deficiency in SW Sys Design Change.Esw Keepfill Sys Aligned to Altenate Supply Until Final C/As Completed + (14:47:36, 16 December 2024)
- ML20070E780 + (14:47:42, 16 December 2024)
- ML20070E774 + (14:47:43, 16 December 2024)
- ML20070E778 + (14:47:43, 16 December 2024)
- ML20070E772 + (14:47:44, 16 December 2024)
- U-602310, Monthly Operating Rept for June 1994 for Clinton Power Station,Unit 1 + (14:47:45, 16 December 2024)
- ML20070E763 + (14:47:45, 16 December 2024)
- ML20070E759 + (14:47:46, 16 December 2024)
- ML20070E752 + (14:47:46, 16 December 2024)
- ML20070E744 + (14:47:47, 16 December 2024)
- ML20070E741 + (14:47:50, 16 December 2024)
- ML20070E727 + (14:47:51, 16 December 2024)
- ML20070E722 + (14:47:51, 16 December 2024)