OPERATING DATA REPORT zmm DOCKET NO.
50-321 OM DATE 12-10-82 2"
COMPLETED BY: AARON SMITH yh TELEPHONE (912) 367-7851, X-203 oa 00 OPERATING STATUS Notes: Problems with computer. Figures hand calculated for November
,o 1.
Unit Names E.
I. Hatch Nuclear Plant Unit 1 0
2.
Reporting Period: 11-82 GW 3.
Licensed Thermal Power (MWt): 2436 hh 4.
Nameplate Rating (Gross MWe): 809.3 ORJ 5.
Design Electrical Rating (Net MWe): 777.3 "U W O 6.
Maximum Dependable Capacity (Gross MWe): 801.2 EM,"
7.
Maximum Dependable Capacity (Net MWe): 761.7 8.
If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:
9.
Power Level to Which Restricted, If Any (Net MWe)
- 10. Reasons for Restrictions, If Any:
This Month Yr-to-Date Cumulative
- 11. Hours In Reporting Period 720 8015 60623
- 12. Number of Hours Reactor was critical 0
4575.6 42966.9
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 0
4332.1 40166.5
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 0 9470911 84248363
- 17. Gross Electrical Energy Generated (MWH) 0 3045760 27269490
- 18. Net Electrical Energy Generated (MWH)
-3096 2881201 25889969
- 19. Unit Service Factor 0
54.0 66.3
- 20. Unit Availability Factor 0
54.0 66.3
- 21. Unit capacity Factor (Using MDC Net)
-0.6 47.2 56.1
- 22. Unit Capacity Factor (Using DER Net)
-0.5 46.2 54.9
- 23. Unit Forced Outage Rate 0
23.6 19.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shutdown at End of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77)
AVERAGE DAILY UNIT POWER LEVEL 4
DOCKET NO.
50-321 DATE:
12-10-82 COMPLETED BY: AARON SMITH TELEPHONE (912) 367-7851, X-203 MONTH 11-82 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1
-5 17
-4 2
-5 18
-4 3
-4 19
-4 4
-4 20
-4 5
-5 21
-4 6
-5 22
-4 7
-5 23
-4 8
-5 24
-4 9
-5 25
-4 10
-5 26
-4 11
-4 27
-4 12
-4 28
-4 13-
-4 29
-4 14
-4 30
-4 15
-5 16
-4 (9/77)
?
e e
i OPERATING DATA REPORT DOCKET NO.
50-366 DATE 12-10-82 COMPLETED BY: AARON SMITH TELEPHONE (912) 367-7851, X-203 OPERATING STATUS Notes: Problems with computer. Figures hand calculated for Nov6mber 1.
Unit Names E.
I. Hatch Nuclear Plant Unit 2 2.
Reporting Period: 11-82 3.
Licens:d Thermal Power (MWt): 2436 4.
Nameplate Rating (Gross MWe): 817.3 5.
Design Electrical Rating (Net MWe): 784.0 6.
Maximum Dependable capacity (Gross MWe): 803.9 7.
Maximum Dependable Capacity (Net MWe): 770.9 8.
If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:
9.
Power Level to Which Restricted, If Any (Net MWe):
- 10. Reasons for Restrictions, If Any:
This Month Yr-to-Date Cumulative
- 11. Hours In Reporting Period 720 8015 28392
- 12. Number of Hours Reactor was. Critical 720 5166.7 20464.9
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 720 4891.7 19455.0
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 1,649,136 10,194,968 42,024,592
- 17. Gross Electrical Energy Generated (MWH) 563,190 3,385,050 13,757,560
- 18. Net Electrical Energy Generated (MWH) 539,992 3,212,051 13,092,576
- 19. Unit Service Yactor 100 61.0 68.5
- 20. Unit Availability Factor 100 61.0 68.5
- 21. Unit Capacity Factor (Using MDC Net) 97.3 51.9 59.8
- 22. Unit Capacity Factor (Using DER Net) 95.7 51.1 58.8
- 23. Unit Forced Outage Rate 0
20.6 12.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shutdown at End of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77)
k
)
AVERAGE DAILY UNIT POWER LEVEL
)
DOCKET NO.
50-366 DATE:
12-10-82 COMPLETED BY: AARON SMITH TELEPHONE (912) 367-7851, X-203
+
MONTH 11-82 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 676 17 785 2
753 18 782 3
730 19 767 4
777 20 428 5
786 21 738 6
774 22 781 7
790 23 783 8
790 24 750 e
9 790 25 592 10 788 26 708 11 783 27 723 12 779 28 758 13 755 29 778 14 787 30 779 15 791 16 789 (9/77) i es_-
n
50-321
[
DOCKET NO.
UNIT Sl!UTDOWNS AND POWER REDUCTIONS UNIT N AME 11atch 1 DATE 12-3-82 COMPLETED BY Mmn mith Novenber 912-367-7851. X-2203
-E TELEPHONE REPORT MONTH f
r
~.
l-
's = 5 51, Cause & Corrective Licensec Ev,,
g" Action to e
ci
.2'E g
g.s X i
u o-di'?
No.
Date
{
3g
,, g 5 Event j
t Prevent Recurrence u
0 l
H
$E dig Report #
g t
I 82-65 821008 S
1720 C
l
, NA RC FUELXX Norical deactor shutdown 'dior...,,;refbling s
i
.e
'}
outh.ge,.. ',
y l
d
+
=
- :. I. -
.... S.
.,. t; _
. j; s
1 *)*
.t-t,
,p.
3 i
l i,:
t
. t
. j 2
~
e s s... :..
. I d
0 l
4 I
'2 3
Exhibit G-Instructions Method:
for Preparation of Data F: Forced Reason:
14!anual S: Scheduled A Equipment Failure (Explain) 2-Manual Scram.
t
. Entry Sheets for Licensee C Rcfucting
~
4 -Continuations Event Report (LER) File (NUREG-B41sintenance of Test 3 AutomaticScram.
0161)
D Regulatory Restriction 5-Icad Ibduction
~. ' '..5 E-Operator Training & Ucense Examination F Administrative 9 Otl'er (1:hrnlain)
- Exhibit I.Same Sousce G Operational Error (Explain) i, (9/77)
H Other(Explain)-
a 3.
r 9
NARRATIVE REPORT UNIT 1 November Refueling outage.
e
+/
- e 1
W 50-366 DOCKET NO UNIT SHUTDOWNS AND POWER REDUC 110NS UNIT NAME h en 2 12-3-82 DATE A"
9"*
tbverber COMPLETED BY 912-367-7851, X-2203.
REPORT MONTH --
TELEPHONE g ),
Cause & Corrective g*
2 Event 71 1
Action to
.' ~
m e
g-
"R 3 y!* ~n, Licensee E,
v ee
.c N..
Date E-Report #
Eu ju
.c a$
2 Frevent Recurrence N
jf5 j e
82-63 821113 F.
9.0 A
5 IE1 EU1PXX Ioss of wrai.' ptrp'notor cooljng-
~
'82-64 821119 S.
11.0 B
5 RC
'D m0D.
Sequence. exchange *.
n CH-VCKXXX Seal,witery,eak into lube oil.IFP,
82-65 8f1120 F'
Q0 A
5
.~..
CTipstu.c.N;,lncore, 3
.y 82-66 82112i F
3.0 A
15 FA.
INSTBU.
1 l-G.,...
Ibd.
tterte, ustasnt.i. '. '..
82.6-7 82I.124
.S.
8sO:
'B 15'
. 4.h..
FC-.
nm00.-
pa 4
a-82-68 821127' S
4.0
.B
- 5 BC '
DUCD Weekly; t prhine test and rod pattern ad.,ju. s.t2nen.t..,'
2
.3 4
1 Method:
Exhibit G-Instructions F: Forced Reason:
I Manual i-for Preparation of Data 5: Scheduled A Diuipment Failure (Explain)
//
2 Manual Scram.
A
, Entry Sheets for Licensee B-Maintenance of Test 3 Automatic Scram.
Event Report (LERI File (NUREG-.
C-Refueling
. 4-Continuations 0161)
~
D. Regulatory Restrlction 5
5-Ioad Beduction E-Operator Training & Ucense Funstantin9
..*I G. Operational Error (Explain) '
.i,
- ' i='Other. f*wal*ini'
.~Adnunistrative p,-
EstelsB-EsawSenser
?
HOber(Emplain)
,' i.
c'.
c tem)
,3.
..>....,.,g.
,=,.
. ~.,.,
- 3
,; g
- ,a,.
u.
n v.
NARRATIVE REPORT UNIT 2 November 13th Loss of cond.
pump motor cooling at 0810 hours0.00938 days <br />0.225 hours <br />0.00134 weeks <br />3.08205e-4 months <br />.
November 13th Loss of cond. pump motor cooling corrected at 1710 hours0.0198 days <br />0.475 hours <br />0.00283 weeks <br />6.50655e-4 months <br />.
November 19th Rod sequence exchange at 2129 hours0.0246 days <br />0.591 hours <br />0.00352 weeks <br />8.100845e-4 months <br />.
November 20th Rod s e'q u e nc e exchange complete at 0829 hours0.00959 days <br />0.23 hours <br />0.00137 weeks <br />3.154345e-4 months <br />.
November 20th Seal water leak into lube oil at 0830 hours0.00961 days <br />0.231 hours <br />0.00137 weeks <br />3.15815e-4 months <br />.
November 20th Seal water leak into lube oil corrected at 1623 hours0.0188 days <br />0.451 hours <br />0.00268 weeks <br />6.175515e-4 months <br />.
November 21st C Tip stuck in core at 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br />.
November 21st C Tip unstuck at 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br />.
November 24th Rod pattern adjustment at 2055 hours0.0238 days <br />0.571 hours <br />0.0034 weeks <br />7.819275e-4 months <br />.
November 25th Rod pattern adjustment complete at 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />.
November 27th Weekly turbine test and rod pattern adjustment at 2020 hours0.0234 days <br />0.561 hours <br />0.00334 weeks <br />7.6861e-4 months <br />.
November 28th Weekly turbine test and rod patte.rn adjustment complete at 0031 hours3.587963e-4 days <br />0.00861 hours <br />5.125661e-5 weeks <br />1.17955e-5 months <br />.
\\
2
HATCH 2 SAFETY-RELATED MAINTENANCE REQUESTS
~
TO BE REPORTED FOR November 1982 NUMBER DATE COMPLETED DESCRIPTION 82-2324 07-14-82 Install two GE type CR 2940 contact. blocks to be used with S/A & S/B switches per P-E-80-871-24 Rev.
A.
Ref:
DCR 80-371.
82-4'511 09-18-82 Installed (2H11-P700) breaker in CAB at 24B as spare per H-23367.
Used an
- ITE, 20A, 277V AC Und.
Lab Inc.
circuit breaker.
Ref:
DCR 80-371.
82-4897 10-09-82 In D/G jacket coolant expansion tank fill line (2R43-G001) installed a 3000 lb.
S.W.
Union upstream of 2R43-F081C solenoid valve in the 3/4" demin water fill line to the D/G jacket coolant expansion tank. Pipe class HEE. Ref: DCR 82-135.
82-4898 10-09-82 In D/G jacket coolant expansion tank fill line
.(2R43-G001) installed a 3000 lb.
S.W.
Union upstream of 2R43-F081A solenoid valve in the 3/4" demin water fill line to the D/G jacket coolant expansion tank. Pipe class HEE. Ref: DCR 82-135.
82-4588 11-03-82 In turbine lube oil cond.
room fire prot.
deluge system.
Modified (2Z43) sprinkler piping add heads,
- hangers, valves as shown on the followin sketches; SM 82-129-(1,2,3 )g
-Rev.
A, SM 82-121-(5,6)-Rev.
B-(Per DCR 82-1221-1).
82-5082 10-08-82 HP modification 130' elevation (smoke detection system).
Removed smoke detector (2Z43-N036A),
rerouted-conduit, installed terminal box 2JM8142 terminated existing cable.
(Ref: DCR 80-284).
3
NUMBER DATE COMPLETED _
DESCRIPTION 81-4335 06-03-82 Low pressure alarm logic primary hot water alarms (2P44).
Installed three (3)
Agastat TDOE Type 7012AE Relays in panel 2H11-P700 per sketch B-E-80-371-9-Rev.
A B-E-80-371-10-Rev.
A.
(Ref: DCR 80-371).
o 81-4421 07-29-82 Low pressure alarm logic primary hot water alarms (2P44).
Routed conduits 2MR
- 3733, 2MR 3734,
& 2MR 3735 per sketches B-E-80-371-22-Rev.
'A, B-E-80-371-23-Rev.
A.
(Ref:
DCR 80-371).
82-2608 11-09-82 RHR service water plant service water (2L23,
- 2E11, 2P41).
Painted new pipe hangers installed. (Ref: DCR 82-027).
./
l l
4 l