Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20070K045 + (14:33:27, 16 December 2024)
- ML20070K027 + (14:33:28, 16 December 2024)
- ML20070K023 + (14:33:28, 16 December 2024)
- ML20070K019 + (14:33:29, 16 December 2024)
- NG-75-2264, Responds to NRC Re Violations Noted in IE Insp Rept 50-261/75-14.Corrective Actions:Quarterly Calibr of Survey Instruments Will Be Performed Per Health Physics Procedure HP-11 by 760131 & Procedure HP-1 Will Be Revised + (14:33:29, 16 December 2024)
- LIC-94-0139, Monthly Operating Rept for June 1994 for FCS Unit 1 + (14:33:30, 16 December 2024)
- ML20070K011 + (14:33:31, 16 December 2024)
- PY-CEI-NRR-1333, Monthly Operating Rept for Feb 1991 for Perry Unit 1.W/ + (14:33:31, 16 December 2024)
- ML20070K002 + (14:33:32, 16 December 2024)
- ML20070J997 + (14:33:32, 16 December 2024)
- ML20070J988 + (14:33:33, 16 December 2024)
- ML20070J987 + (14:33:33, 16 December 2024)
- ML20070J983 + (14:33:34, 16 December 2024)
- ML20070J985 + (14:33:34, 16 December 2024)
- ML20070J974 + (14:33:35, 16 December 2024)
- IR 05000413/2020010 + (14:33:37, 16 December 2024)
- 3F0391-03, Forwards Rev to Commitment in Response to Violations Noted in Insp Rept 50-302/86-20.Corrective actions:short-term Instruction Issued to Operations Personnel Directing Operators Not to Adjust Packing on safety-related Valves + (14:33:38, 16 December 2024)
- ML20070J942 + (14:33:38, 16 December 2024)
- L-75-595, Responds to NRC Re Violation Noted in IE Insp Repts 50-250/75-16 & 50-251/75-16.Corrective Actions:Overdue Inservice Insp Rept Transmitted to NRC on 751120 & Procedure Written to Describe Scheduling & Preparation of Repts + (14:33:39, 16 December 2024)
- ML20070J931 + (14:33:39, 16 December 2024)
- L-75-304, Responds to NRC Re Deviation Noted in IE Insp Repts 50-250/75-07 & 50-251/75-07.Corrective Actions:Fire Stops Installed in Cable Trays in Unit 4 Control Rod Drive Room & Entrance to Auxiliary Bldg Above Main Corridor Doors + (14:33:40, 16 December 2024)
- ML20070J927 + (14:33:40, 16 December 2024)
- ST-HL-AE-3691, Requests Deletion of SER (NUREG-0781) Requirements to Provide Administrative Aide on Each Operations Shift Crew, Per Deviations Noted in Insp Repts 50-498/90-36 & 50-499/90-36 + (14:33:41, 16 December 2024)
- ML20070J900 + (14:33:42, 16 December 2024)
- ML20070J914 + (14:33:42, 16 December 2024)
- ML20070J899 + (14:33:43, 16 December 2024)
- ML20070J896 + (14:33:44, 16 December 2024)
- ST-HL-AE-3718, Forwards 2RE01 Inservice Insp Summary Rept for Sys Pressure Tests at South Texas Project,Unit 2, Including Period from Commercial Operation (890619) to First Refueling Outage (901211).Index of Attachments Encl + (14:33:44, 16 December 2024)
- ML20070J885 + (14:33:45, 16 December 2024)
- ML20070J886 + (14:33:45, 16 December 2024)
- ML20070J884 + (14:33:47, 16 December 2024)
- ML20070J880 + (14:33:47, 16 December 2024)
- ML20070J872 + (14:33:48, 16 December 2024)
- ML20070J865 + (14:33:49, 16 December 2024)
- ML20070J868 + (14:33:49, 16 December 2024)
- ML20070J860 + (14:33:50, 16 December 2024)
- ML20070J858 + (14:33:51, 16 December 2024)
- ML20070J851 + (14:33:52, 16 December 2024)
- L-75-354, Responds to NRC Re Violation Noted in IE Insp Repts 50-250/75-08 & 50-251/75-08.Corrective Actions: Superseded Procedures for Surveillance Testing Removed & Latest Revision Placed in Control Room on 750526 + (14:33:52, 16 December 2024)
- ML20070J814 + (14:33:53, 16 December 2024)
- ML20070J831 + (14:33:53, 16 December 2024)
- ML20070J806 + (14:33:54, 16 December 2024)
- ML20070J809 + (14:33:54, 16 December 2024)
- ML20070J800 + (14:33:55, 16 December 2024)
- ML20070J797 + (14:33:59, 16 December 2024)
- ML20070J793 + (14:33:59, 16 December 2024)
- ML20070J788 + (14:34:01, 16 December 2024)
- ML20070J786 + (14:34:03, 16 December 2024)
- ML20070J783 + (14:34:03, 16 December 2024)
- RC-94-0185, Submits Proposed TS Change Request TSP 930015,Suppl 1, Changing Format of TS Tables 2.2-1, Reactor Trip Sys Instrumentation Trip Setpoints & 3.3-4, ESFAS Instrumentation Trip Setpoints, Per 940422 Telcon W/Nrc + (14:34:04, 16 December 2024)
- ML20070J778 + (14:34:04, 16 December 2024)
- ML20070J769 + (14:34:05, 16 December 2024)