o EGE 2" eDE' ggw%#s r wnm.ll.EllK
.s
' NUCLEAR OPERATING CORPORATION John A. Bailey Vice President opercions March 13,1991 NO 91-0081 l
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station F1-137 Washington, D. C.
20555
Subject:
Docket No. 50-4821 Febt uary,1991 Monthly Operating Report Gentlemen Attached is the Februry 1991, Monthly Operating Report for Wolf Creek Generating Station.
This submittal is being made in accordance with the requirements of Technical Specification 6.9.1.8.
Very truly youro, L a.,<W' John A. Bailey Vice President Operations JABlaem Attachment cci A. T. Howell (NRC), w/a R. D. Martin (NRC), w/a D. V.
Pickett (NRC), w/a M.
E. Skow (NRC), w/a t)o[r31$hl[ $1,h',fif,ks:-
m n
PO Box 411/ Burhngton, KS 66839 i Phone- (316) 364-8831
((
An Equal Opportunity Employer M F HC/ VET
/
i Attachment to NO 91-0081 WOLF CRIIK NUCIEAR OPIRATI!G CORKIRTIN NOLF CREEK GENERATI!G STATIM ICNDILY CPERATIlG REFGIT MORIH:
Pobnaiv YF#t 1991 Decket Ib. :
50-402 Pacility Operating License !b.: IFF.42 Poport Ib.
72 PnTanxi by:
Herlin G. Williams i
l
Att.actcent to NO 91-0081 t
SlWARY
'Iho follcwing report Alghlights the operatirg experimoe of Wolf Creek Generating Statico for the Inanth of February,1991. This report is being provided pursuant to Technical Specification 6.9.1.8.
I.
SIM%RY OF OPERATDG EXPERIDCE The unit operated continuously throughout the month of February 1991. The unit began the month at 90% power with power being further reduced to 80% on February 5.
These power levels are being mintained for fuel conservation purposes. Power ru mined at 80% for the ru minder of February with the exception of a sixteen hour period beginning late february 14, when power was ruiuced to 75% as a result of a min geerator stator cooling instrumentation prob 1 m.- 'Ihe instrumentatico probim was corrected and the unit returned to 80% pp.er February 15, 1991.
II. MMOR SAFETY REATED MAINTENA!CE ACTIVITIES 1.
Replacenont of hydraulic punp on min steam isolation valve AWV11.
2.
Replacement of u.wassor heads on control roca air conditierJ.ng unit SGK04A in support of PMR 2062.
a Wolf Creek Generating Station Monthly Operating Report February 1991 Page 1 of 5
, Attachment to NO 91-0081 OPERATI!G IATA RIMRT DOCK 12 NO.
50-482 WOLF CREEK GENERATDG STN1'ICN WOLF CREEK NUCLEAR OPERATIlG CXRPCRATIQi IRTE 03-01-91 CCHPIEI'ED BY M. Williams TELEPHONE 316-364-8831 OPERATIlO STATUS 1.
Reporting Period:
1%br-v, 1991 Gross Hours in Reporting Period: 672 3.
Currently Authorized Power Invel()Mt):,,,3111 Max. Depond. Capacity ()Me-Net) _1125 Design Electrical Rating ()Me-Net):
1170 3.
Power level to Wttich Restricted (If Any)(NWe-Net):
N/A 4.
Reasons for Instriction (If Any):
N/A
'Ihis Month Yr. to Data Cunnlative 5.
Number of Hours Roactor was Critical 672.0 1,416.0
_,18,811.5 6.
Reactor Reserve Shutdown Iburs 0.0 0.0 339.8 7.
Hours Generator cn Line 672.0 1,416.0 38,239.8 8.
thit Reserve Shutdown Iburs 0.0 0.0 0.0 9.
Gross 'Ihermal Energy Generated (MHH) 1,840.498 M 03,789 126,268,814
- 10. Gross Electrical Energy Generated (MHH) 639.50,2._
1,474,403 43,989,172 r
- 11. Net Electrical Energy Generated (MHH) 609.007 1,408.019 42,004,877
- 12. Reactor Service Factor 100.0 100.0 80.7 l
- 13. Reactor Availability Factor 100.0 100.0 81.4
- 14. Unit Service Factor 100.0 100.0 79.5
- 15. Unit Availability Factor 100.0 100.0 79.5
- 16. Unit Capacity Factor (Using MDC) 79.8 87.6 77.2
- 17. Unit Capacity Factor (Using Design MWe) 77.5 05.0 74.6
- 18. Unit Forced Outage Rate 0.0 0.0 3.9
- 19. Shutdowns Scheduled Over Next 6 Manths (Type, Date, and Duratica of each): N/A 20.
If Shut Down at End of Report Period, Estimated Date of Startup:
N/A
-Wolf Creek Generating Station Monthly Operating Report February 1991 Pags 2 of 5
Attachment to NO 91-0081 AVDUGE DAILY LD4IT IWD1 ILVIL D001T 10.
50-482 WOLF CREEK GDuRATI!G STATIG4 NOLF CREEK !ACLEAR OPDWTI1G OJtIURTIO1 Dtc'E 03-01-91 COGLUnD BY M. Williams TELEPIENE 116-364-8831 20m1 Febntag, 1991 DAY AVDVGE DAILY POhUt 11 VEL DAY AVDUGE DAILY POWER ILVIL (MWe-!bt)
(19b-Not) 1 1029 17 884 2
1029 18 883 3
1029 19 893 4
1029 20 883 5
973 21 884 6
887 2?
883 7
885 23 884 8
886 24 885 9
885 25 883 10 886 26 881 11 885 27 881 12 884 28 881 13 883 29 N/A 14 876 30 N/A 15 056 31 N/A 16 883 Nolf Ctwk Generating Station Monthly Operating Report February 1991 Pa p 3 of 5
)
UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO.
50-482
^
WOLF CREEK GENERATING STATION -3 WOLF CREEK NUCLEAR OPERATING CORPCRATION g
DATE 03-01-91 n
REPORT MONTH February. 1991 COMPLETED BY M. Williams 5
TELEPHONE 316-364-8831 c.
TYPE hr.itiODS Suuu1HG N
F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS / COMMENTS No Date S: SCHEDULED (HOURS)
(1)
OR REDUCING POWER (2)
O 3
89 SGenRT:
The unit operated throughout the month of February with no power: reductions that resulted in a greater than 20:
reduction in average daily power level as compared to the prer!.ous 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
- 1) REASON: A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EIAMINATION (2) METHOD:
1.
MANUAL B: MAINTENANCE OR TEST F: ADMINISTRATIVE Z.
PANUAL SCRAM C: REFutLING C:
OPERATIONAL ERROR (EIPLAIN) 3.
AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EIPLAIN) 4.
CONTINUED 5.
REDUCED LOAD 9.
OTHER Wolf Creek Generating Station Monthly Operating Report February 1991 Page 4 of 5
. _... _..... _ _ _. _ _ - _ _ _ _. _ _. - _ _ - _ _ ~ _. _.. _ _ _ _ _ _ _. _ _.. _ _ _ _ _ _..
d.techment to NO 91-0081 i
s r
e j
KLF CREEK NUCLEAR OPERATIE OCRPORATION h0LF CRCK GENERATI1G STATIM I
WIT NO.1 M0tml Febr ury. 1991 i
S39%RY OF OPERATIE F.KPERIEtCE r
Lirted below in chrtmological sequence is a sumary of operating experiences for this nonth i
which requixud load reduction or resulted in significant non-load related incidents.
-t DATE
. TIE EVENP February 1, 1991 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> Unit at 90% power.
February 5, 1991 1551 hours0.018 days <br />0.431 hours <br />0.00256 weeks <br />5.901555e-4 months <br /> Conmanced power decrease to 80% at request of Systm Operations.
1845 hours0.0214 days <br />0.513 hours <br />0.00305 weeks <br />7.020225e-4 months <br /> Unit at 80% power.
February 14, 1991 2045 hours0.0237 days <br />0.568 hours <br />0.00338 weeks <br />7.781225e-4 months <br /> Received turbine runback to 75% power as a result of unin generator stator cooling instnnentation l
probim.
February 15, 1991 1219 hours0.0141 days <br />0.339 hours <br />0.00202 weeks <br />4.638295e-4 months <br /> Stator coolino instrumentation restored, ccmmencing power increase to 80%.
1333 hours0.0154 days <br />0.37 hours <br />0.0022 weeks <br />5.072065e-4 months <br /> Unit at 80% power.
February 28, 1991 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> Unit at 80% power.
i l