Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000457/LER-1994-004-07, :on 940406,control Rod K2 Failed to Fully Insert During Trip & Remained Out of Core at Indicated 210 Steps Due to Procedural Deficiency.Corrective Action: Shutdown Margin Calculations Were Performed + (14:18:16, 16 December 2024)
- ML20070P424 + (14:18:17, 16 December 2024)
- ML20070P420 + (14:18:17, 16 December 2024)
- 1CAN039102, Withdraws Relief Request 31 Re Performance of Exercise & Stroke Time Testing for Decay Heat Cooler Bypass Valves CV-1432 & CV-1433 During Each Refueling Outage.Procedures Will Be Revised to Perform Testing During ASME Frequency + (14:18:18, 16 December 2024)
- ST-HL-AE-3723, Forwards South Texas Project Unit 1,Cycle 4 Core Operating Limits Rept, Rev 0 + (14:18:18, 16 December 2024)
- 05000327/LER-1991-003, :on 910218,centrifugal Charging Pump Declared Inoperable & Removed from Svc Due to Pump Degradation.Caused by Heavy Wear on Impeller Shoulders in Wear Ring Area.Pump Rotating Element Replaced + (14:18:20, 16 December 2024)
- BECO-91-040, Forwards Summary of Compliance W/Reg Guide 1.97,Rev 2 to Assist NRC in Review of Compliance W/Reg Guide 1.97,Rev 3, Per 9100115 & 0405 Ltrs + (14:18:25, 16 December 2024)
- 05000293/LER-1982-057-03, /03L-0:on 821213,during Routine Startup from Outage,Outboard MSIV AO 203-2C Did Not Close within Tech Spec Limit.Caused by Malfunctioning four-way Control Valve. Valve Replaced.Timing Dash Pot Adjusted + (14:18:27, 16 December 2024)
- ML20070P396 + (14:18:28, 16 December 2024)
- ML20070P394 + (14:18:28, 16 December 2024)
- ML20070P390 + (14:18:34, 16 December 2024)
- ML20070P388 + (14:18:36, 16 December 2024)
- B13742, Submits Corrections to 860930 Crdr Summary Rept of Human Engineering Discrepancies.Enhancements to Steam Generator wide-range Level Will Be Completed When Steam Generators Replaced During Cycle 11 Refueling Outage in 1992 + (14:18:37, 16 December 2024)
- ML20070P380 + (14:18:40, 16 December 2024)
- 05000293/LER-1982-057, Forwards LER 82-057/03L-0 + (14:18:41, 16 December 2024)
- 05000416/LER-1983-001, Forwards LER 83-001/01T-0 + (14:18:41, 16 December 2024)
- ML20070P372 + (14:18:42, 16 December 2024)
- 0CAN049413, Forwards Certificates of Insurance P94-045,X94143R & CX94-03M Issued by Nuclear Mutual Limited,Ani & Maelu & Nuclear Electric Insurance Limited,Respectively + (14:18:43, 16 December 2024)
- ML20070P369 + (14:18:43, 16 December 2024)
- 05000387/LER-1982-073-03, /03L-0:on 821213,drip Leg of Control Structure Chlorine Detector B Nonfunctional.Caused by Continuous Operation of Heat Tracing on Sample Line Drying Out Drip Leg.Mod to Move Sensor to Sample Line Initiated + (14:18:47, 16 December 2024)
- LIC-94-0092, Forwards Rev 6 to OPPD-NA-8301-NP,Rev 4 to OPPD-NA-8302-NP, Theoretical Manual & Users Manual for Axial Shape Analyzer..., Rev 6 to OPPD-NA-8301-P & Rev 4 to OPPD-NA-8302-P.OPPD-NA-8301-P & OPPD-NA-8302-P Withheld + (14:18:48, 16 December 2024)
- 05000482/LER-1994-003, :on 940331,discovered Unqualified Shift Technical Advisor Assigned on Shift Crew Due to Inadequate Review of Programmatic Requirements.Shift Engineers Removed Until Required Training Completed + (14:18:53, 16 December 2024)
- 05000413/LER-1991-008, :on 910219,determined That Control Room Ventilation Sys Could Not Satisfy GDC 19 Requirements Under Postulated Scenario.Caused by Design Deficiency.Intake Valves Deenergized to Remain Open + (14:18:55, 16 December 2024)
- 05000458/LER-1994-005, :on 940406,automatic Actuation of ESF Occurred Due to Electrical Transient.Caused by Failure of Offsite Protective Equipment.Offsite KD-10 Relays Replaced & New Set of HCB-1 Relays Installed + (14:18:57, 16 December 2024)
- ML20070P349 + (14:18:58, 16 December 2024)
- ML20070P348 + (14:18:58, 16 December 2024)
- 05000387/LER-1982-073, Forwards LER 82-073/03L-0 + (14:18:59, 16 December 2024)
- NRC-94-4113, Forwards AP600 Instrumentation & Control Sys Process Block Diagrams for Integrated Protection Cabinets & ESF Actuation Cabinets.Diagrams Withheld + (14:18:59, 16 December 2024)
- LD-94-032, Forwards Response to NRC Comments on ABB-CE Design Certification Matl Transmitted w/940324 Ltr + (14:19:00, 16 December 2024)
- ML20070P327 + (14:19:03, 16 December 2024)
- ML20070P334 + (14:19:03, 16 December 2024)
- ML20070P326 + (14:19:04, 16 December 2024)
- 05000368/LER-1991-007, :on 910223,fire Occurred in 480-volt ESF Motor Control Ctr Following Start of Turing Gear Motor.Caused by Incomplete Contact Between Bus Bars & Circuit Breaker Power Stabs.Design Change Under Evaluation + (14:19:06, 16 December 2024)
- 05000387/LER-1982-075-03, /03L-0:on 821215,diesel Generator C Tripped During Testing.Caused by Loose Jacket Water Cooler High Temp Switch.Temp Element Recalibr + (14:19:08, 16 December 2024)
- ML20070P320 + (14:19:09, 16 December 2024)
- NRC-94-4108, Forwards Nonproprietary & Proprietary Addl Info in Support of Westinghouse Response to RAI 952.43 on AP600 Design.Info Needed to Support Computer Model Development.Proprietary Info Withheld (Ref 10CFR9.17(a)(4)) + (14:19:09, 16 December 2024)
- 0CAN039108, Request for Revised Walkdown Schedule for Resolution of Unresolved Safety Issue A-46 + (14:19:10, 16 December 2024)
- 05000325/LER-1982-151-03, /03L-0:on 821214,diesel Low Lube Oil Pressure Trip Occurred.Caused by Diesel Low Lube Oil Pressure Start Time Delay Timing Out Before Pressure Greater than Low Trip Setpoint.Start Time Relay Calibr + (14:19:11, 16 December 2024)
- 05000498/LER-1991-005, :on 910218,opening of Fuel Handling Bldg Truck Doors During Fuel Movement Causes Tech Spec Violation.Caused by Incomplete Adminstrative Controls on Fuel Handling Bldg Door.Locks Placed on Truck Doors + (14:19:13, 16 December 2024)
- 05000324/LER-1991-004, :on 910218,invalid First Interval Hydrostatic Test Boundary on Reactor Pressure Vessel Identified.Cause Unknown.Technical Support in-service Insp Personnel Revising PT-80.1 + (14:19:16, 16 December 2024)
- 05000387/LER-1982-075, Forwards LER 82-075/03L-0 + (14:19:17, 16 December 2024)
- ML20070P303 + (14:19:17, 16 December 2024)
- ML20070P299 + (14:19:18, 16 December 2024)
- 05000325/LER-1982-151, Forwards LER 82-151/03L-0.Detailed Event Analysis Encl + (14:19:21, 16 December 2024)
- ML20070P275 + (14:19:22, 16 December 2024)
- 05000461/LER-1991-002, :on 910218,loss of Svc & Instrument Air Occurred Resulting in Manual Scram Insertion.Caused by Personnel Error.Surge Suppression Switch on Compressor Recalibrated + (14:19:23, 16 December 2024)
- 05000369/LER-1991-004-01, :on 910219,reactor Trip Occurred Due to Manual Opening of Reactor Trip Breaker.Caused by Mgt Deficiency & Possible Inappropriate Action.Emergency Procedure EP/1/A/5000/01 Implemented + (14:19:26, 16 December 2024)
- 05000277/LER-1991-006-01, :on 910220,scram Caused by de-energizing Intermediate Range Monitor.Caused by Failure to Follow Procedure.Individuals Involved Counseled on Requirements to Perform Safety Related Blocking Reviews + (14:19:33, 16 December 2024)
- 05000416/LER-1982-153-99, Channel a Wind Direction Sensor at Elevation 162 Ft Found Giving Suspect Indication. Cause Not Stated.Sensor Replaced,Tested & Confirmed Functioning + (14:19:37, 16 December 2024)
- 05000254/LER-1991-006, :on 910219,ESF Actuation Occurred Due to Unexpected Loss of Power to Channel B of Reactor Protection Sys,Causing Primary Containment Isolation.Caused by Mechanical Vibration.Power Reestablished + (14:19:39, 16 December 2024)
- 05000416/LER-1982-153, Forwards Updated LER 82-153/99X-1 + (14:19:40, 16 December 2024)
- Press Release-20-015, NRC Names New Deputy Executive Director for Operations; Region III Administrator + (14:19:40, 16 December 2024)