ML20070P420

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept 82-014 Re Failure of Reactor Shutdown Cooling Bypass Valves to Respond to Command Signals.Initially Reported on 820630.Review Continuing.Final Rept Expected by 830215
ML20070P420
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 01/17/1983
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, 82-014, 82-14, L-83-21, NUDOCS 8301260338
Download: ML20070P420 (1)


Text

.

e P. O. BOX 14000. JUNO BE ACH, FL 33408

"*^ ~ '" " "" " ~^""

3 3,, y ;

p l. 00 January 17, 1983 L-83-21 Mr. James P. O'Reilly Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

Re:

ST. LUCIE UNIT 2 DOCKET N0. 50-389, 50.55(e),82-014 VALVES WILL NOT RESPOND TO COMMAND SIGNALS On June 30, 1982, Florida Power and Light Co. (FPL) notified Region II Office of Inspection and Enforcement, in accordance with the rc-quirements of 10 CFR 50.55(e) of a potential deficiency regarding the failure of reactor shutdown cooling bypass valves to respond to command signals.

FPL is still reviewing this problem and will sub-mit a final report by February 15, 1983.

Very truly yours, d S hu n bert E.

h ig Vice President Advanced Systems and Technology REU/ok cc:

Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 l

OYFirig r30126033s e30117

_ 4 6~ A PDRADOCK05000g PEOPLE.. SERVING PEOPLE