Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000336/2005007 + (23:20:36, 15 January 2025)
- ML051590234 + (23:20:36, 15 January 2025)
- ML051590217 + (23:20:37, 15 January 2025)
- ML051590214 + (23:20:38, 15 January 2025)
- ML051590211 + (23:20:39, 15 January 2025)
- ML051590206 + (23:20:40, 15 January 2025)
- ML051590203 + (23:20:41, 15 January 2025)
- PLA-5907, Proposed Amendment No. 275 to Unit 1 Facility Operating License NPF-14 and Proposed Amendment No. 244 to Unit 2 Facility Operating License, and Proposed Operating License, Exigent Change to Technical Specification 3.8 + (23:20:41, 15 January 2025)
- NL-05-062, Proposed Change to IP2 Technical Specifications Regarding Pressurizer Water Level Requirements, Indian Point Unit No. 2 + (23:20:42, 15 January 2025)
- NL-05-063, Reactor Vessel Lower Head Inspection Results; Indian Point Unit 3 + (23:20:43, 15 January 2025)
- ML051590172 + (23:20:44, 15 January 2025)
- ML051590167 + (23:20:48, 15 January 2025)
- RS-05-070, Response to Request for Additional Information Regarding the Plant Loop Stop Isolation Valve + (23:20:49, 15 January 2025)
- SBK-L-05122, Cycle 11 Core Operating Limits Report + (23:20:50, 15 January 2025)
- L-PI-05-057, Revisions to Relief Requests Associated with the 4th Interval Inservice Testing Plan + (23:20:51, 15 January 2025)
- ML051590140 + (23:20:54, 15 January 2025)
- ML051590137 + (23:20:55, 15 January 2025)
- ML051590130 + (23:20:56, 15 January 2025)
- ML051590135 + (23:20:56, 15 January 2025)
- ML051590121 + (23:20:57, 15 January 2025)
- ML051590110 + (23:20:58, 15 January 2025)
- 05000306/LER-2005-001, Re Shutdown Required by Technical Specifications Due to Two Trains of Containment Cooling Inoperable + (23:21:00, 15 January 2025)
- NL-05-044, Reactor Vessel Upper Head Inspection Results; Indian Point Unit 3. Spring 2005 Refueling Outage (3R13) + (23:21:01, 15 January 2025)
- ML051590064 + (23:21:02, 15 January 2025)
- ML051590049 + (23:21:02, 15 January 2025)
- Press Release-III-05-030, NRC to Discuss 2004 Performance Assessment for Dresden Nuclear Power Plant + (23:21:03, 15 January 2025)
- ML051590016 + (23:21:04, 15 January 2025)
- ML051590030 + (23:21:04, 15 January 2025)
- ML051590004 + (23:21:05, 15 January 2025)
- ML051590003 + (23:21:06, 15 January 2025)
- ML051590002 + (23:21:06, 15 January 2025)
- ML051580640 + (23:21:07, 15 January 2025)
- ML051580629 + (23:21:07, 15 January 2025)
- ML051580600 + (23:21:08, 15 January 2025)
- ML051580590 + (23:21:09, 15 January 2025)
- ML051580507 + (23:21:10, 15 January 2025)
- ML051580487 + (23:21:11, 15 January 2025)
- ML051580480 + (23:21:13, 15 January 2025)
- NRC 2005-0049, Transmittal of Annual Monitoring Report - 2004 for Point Beach Nuclear Plant, Units 1 and 2 + (23:21:13, 15 January 2025)
- ML051580420 + (23:21:14, 15 January 2025)
- BSEP 05-0063, Relief Request VRR-15, Emergency Diesel Generator Service Water Check Valves + (23:21:15, 15 January 2025)
- ML051580386 + (23:21:15, 15 January 2025)
- ML051580381 + (23:21:16, 15 January 2025)
- BVY 05-061, Technical Specification Proposed Change No. 263 - Supplement No. 29 Extended Power Uprate - Steam Dryer Computational Fluid Dynamics + (23:21:18, 15 January 2025)
- ML051580371 + (23:21:18, 15 January 2025)
- ML051580337 + (23:21:21, 15 January 2025)
- NRC 2005-0067, Response to Request for Additional Information Regarding Request for Exigent Review of Heavy Load Analysis + (23:21:22, 15 January 2025)
- ML051580332 + (23:21:26, 15 January 2025)
- ML051580329 + (23:21:26, 15 January 2025)
- ML051580325 + (23:21:27, 15 January 2025)
- ML051580319 + (23:21:28, 15 January 2025)