Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20071E092 + (11:47:55, 15 December 2024)
- ML20071E101 + (11:47:55, 15 December 2024)
- ML20071E086 + (11:47:57, 15 December 2024)
- ML20071E075 + (11:47:58, 15 December 2024)
- ML20071E066 + (11:47:59, 15 December 2024)
- ML20071E063 + (11:48:00, 15 December 2024)
- ML20071E048 + (11:48:01, 15 December 2024)
- ML20071E049 + (11:48:01, 15 December 2024)
- ML20071E044 + (11:48:02, 15 December 2024)
- ML20071E045 + (11:48:02, 15 December 2024)
- ML20071E036 + (11:48:08, 15 December 2024)
- ML20071E031 + (11:48:12, 15 December 2024)
- ML20071E029 + (11:48:13, 15 December 2024)
- ML20071E016 + (11:48:17, 15 December 2024)
- ML20071E015 + (11:48:18, 15 December 2024)
- ML20071E002 + (11:48:20, 15 December 2024)
- ML20071E013 + (11:48:20, 15 December 2024)
- ML20071D997 + (11:48:21, 15 December 2024)
- ML20071D996 + (11:48:22, 15 December 2024)
- ML20071D994 + (11:48:23, 15 December 2024)
- ML20071D990 + (11:48:24, 15 December 2024)
- ML20071D989 + (11:48:24, 15 December 2024)
- ML20071D984 + (11:48:25, 15 December 2024)
- ML20071D980 + (11:48:26, 15 December 2024)
- ML20071D977 + (11:48:27, 15 December 2024)
- ML20071D969 + (11:48:28, 15 December 2024)
- GO2-83-188, Final Deficiency Rept Re Damage to Electrical Cable 2SM8- 0080 During Installation of Thermo Lag Fire Resistant Matl (Condition 235).Initially Reported on 830204.Damaged Cable Repaired.Condition Not Reportable Per 10CFR50.55(e) + (11:48:29, 15 December 2024)
- RBG-14-494, Final Deficiency Rept DR-81 Re Improper O-ring Matl Used in Control Bldg Chiller Pumps & Normal Svc Water Pumps Supplied by Gould.Initially Reported on 821228.O-ring Matl Determined Functional.Condition Not Reportable Under 10CFR50.55(e) + (11:48:29, 15 December 2024)
- ML20071D961 + (11:48:30, 15 December 2024)
- ML20071D962 + (11:48:30, 15 December 2024)
- ML20071D958 + (11:48:31, 15 December 2024)
- ML20071D946 + (11:48:32, 15 December 2024)
- ML20071D950 + (11:48:32, 15 December 2024)
- ML20071D936 + (11:48:33, 15 December 2024)
- ML20071D939 + (11:48:33, 15 December 2024)
- ML20071D932 + (11:48:34, 15 December 2024)
- ML20071D929 + (11:48:34, 15 December 2024)
- ML20071D927 + (11:48:36, 15 December 2024)
- ML20071D921 + (11:48:37, 15 December 2024)
- ML20071D914 + (11:48:39, 15 December 2024)
- ML20071D905 + (11:48:42, 15 December 2024)
- ML20071D904 + (11:48:46, 15 December 2024)
- ML20071D903 + (11:48:47, 15 December 2024)
- 05000315/LER-1982-111, Forwards LER 82-111/03L-0 + (11:48:48, 15 December 2024)
- 05000259/LER-1983-007, Forwards LER 83-007/03L-0 + (11:48:49, 15 December 2024)
- 0CAN038307, Forwards Addl Info Re Spent Fuel Storage Expansion Per 830201 Request.Seismic Analysis Performed Using Combined Weights of Fuel Assembly & Control Rod Assembly in Each Cell Location + (11:48:50, 15 December 2024)
- ML20071D873 + (11:48:50, 15 December 2024)
- 05000293/LER-1983-005, Forwards LER 83-005/01T-0 + (11:48:51, 15 December 2024)
- ML20071D850 + (11:48:52, 15 December 2024)
- 05000362/LER-1983-018, Forwards LER 83-018/03L-0 + (11:48:56, 15 December 2024)
- 05000321/LER-1983-014-01, /01T-0:on 830211,during Cold Shutdown for Refueling,Piping Support Hanger Found Installed on RBCCW Sys Rather than Plant Svc Water (Psw) Sys.Caused by Const Error. New Hanger Installed on Psw Sys + (11:49:03, 15 December 2024)
- ML20071D838 + (11:49:04, 15 December 2024)