ML20071D969
| ML20071D969 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 03/01/1983 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | Arkansas Power & Light Co |
| Shared Package | |
| ML20071D974 | List: |
| References | |
| DPR-51-A-070 NUDOCS 8303110401 | |
| Download: ML20071D969 (2) | |
Text
~
~
~
.. ~...
. =.... _
.b eaeog*
UNITED STATES
,y NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 4,
.q,g/
ARKANSAS POWER & LIGHT COMPANY DOCKET NO. 50113 ARKANSAS NUCLEAR ONE - UNIT NO.1 AMENDMENT TO FACILITY OPERATING LICENSE Amendnent No. 70 License No. DPR-51 1.
The Nuclear Regulatory Comission (the Consnission) has found that:
A.
The application for amendment by Arkansas Power and Light Company (the licensee) dated Hovenber 9,1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rule s and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in confomity with the application, the provisions of the Act, and the rules and regulations of the Comissi,on; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CPR Part 51 of the Comission's regulations and all applicable requirements
have been satisfied.
8303110401 830301 DR ADOCK 05000
--e
.w--
~^
2.
Accordingly, Facility Operating License No. DPR-51 is hereby amended by adding paragraph 2.c.(7) to read as follows:
Secondary Water Chemistry Monitoring A secondary water chemistry monitoring program shall be implemented to minimize steam generator tube degradation.
This program shall include:
1.
Identification of a sampling schedule for the critical parameters and control points for'these parameters; 2.
Identification of the procedures used to measure the values of the critical parameters; 3.
Identification of process sampling points; 4.
Procedures for the recording and management of data; 5.
Procedures defining corrective actions for off-control point chemistry conditions; and 4
6.
A procedure identifying the authority responsible for the interpretation of the data and the sequence and timing of administrative events required to initiate a corrective action.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
[
, UA
~
P h
F. Stolz, Chief p ating Reactors Branc #4 sion of Licensing Date of Issuance: MAR 0 1 1983 1
e l
1:
_