ML20071D989
| ML20071D989 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 01/20/1983 |
| From: | Warembourg D PUBLIC SERVICE CO. OF COLORADO |
| To: | Jay Collins, Eisenhut D, Rohrer D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE), Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20071D979 | List: |
| References | |
| P-83028, NUDOCS 8303100025 | |
| Download: ML20071D989 (3) | |
Text
f
- :Y
- .::
- W (CEGlI*8Dd@
16805 WCR 19 1/2, Platteville, Colorado 80651 January 20, 1983 Fort St. Vrain Unit No.-1 P-83028 Mr. David Rohrer Division of I&E U.S. Nuclear Regulatory Commission East-West Tower South Building Room 312-A Washington, D.C.
20555 Osar Mr. Rohrer:
We are transmitting herein revisions to several emergency preparedness related documents.
The changes affect the following document binders:
Station RERP Implementing Procedures In the Station RERP Implementing Procedures, the general format for procedures with worksheets is to file the procedure body under the tab marked with the procedure title, and the worksheets under the tab marked " Attachments," which immediately follows the procedure tab.
The attachments are separated from the procedure by a blue sheet to assist in filing.
The following procedures are being transmitted for filing in the station RERP Implementing Procedures.
RERP-HOME, Issue 3 RERP-CR-UE, Issue 16 RERP-VC, Issue 2 I
If there is confusion as to which issue is most recent whenever multiple copies are received in a short period of time, the highest issue number is always the most recent issue of a given procedure.
If difficulties or questions arise in filing these procedures, please feel free to contact Mr. J. M. Sills at (303) 785-2224, extension 283 for assistance.
Very truly yours, b~ YY IWta&
Don W. Warembourg h
Manager, Nuclear Production 9
OWW/pc B303100025 830302
\\'
PDR ADOCK 05000267 F
POR
m/
' pubMe Service Company P ColleIrsde
.IA' j
16805 WCR 19 1/2, Platteville, Colorado 80651 January 20, 1983 Fort St. Vrain Unit No. 1 P-83030 Mr. John T. Collins M.O]
Regional Administrator J$
i Nu ear Regulatory Commission j ggg l
611 Ryan Plaza Dr., Suite 1000 JJ U
/
Arlington, TX 76011 1
Dear Mr. Collins:
~
We are transmitting herein revisions to several emergency preparedness related documents.
The changes affect the following document binders:
Station RERP Implementing Procedures In the Station RERP Implementing Procedures, the generel format for procedures with worksheets is to file the procedure body under the tab marked with the procedure title, and the worksheets under the tab marked " Attachments," which immediately follows the procedure tab.
The attachments are separated from the procedure by a blue sheet to assist in filing.
The following procedures are being transmitted for filing in the station RERP Implementing Procedures.
RERP-HOME, Issue 3 RERP-CR-UE, Issue 16 RERP-VC, Issue 2 If there is confusion as to which issue is most recent whenever multiple copies are received in a short period of time, the highest issue number is always the most recent issue of a given procedure.
If difficulties or questions arise in filing these procedures, please feel free to contact Mr. J. M. Sills at (303) 785-2224, extension 283 for assistance.
Very truly yours, W Ou 0 5 Don W. Werembourg Manager, Nuclear Production DWW/pc 1
- mmy e coomeo 16805 WCR 19 1/2, Platteville, Colorado 80651 January 20, 1983 Fort St. Vrain Unit No. 1 P-83027 Mr. Darrell G. Eisenhut Division of Licensing 3 i Office of Nuclear Reactor Regulation dL M b I IE U.S. Nuclear Regulatory Commission
( k,y o
Washington,.D.C.
20555 I
~
Dear Mr. Eisenhut:
We are transmitting herein revisions to several emergency preparedness related documents.
The changes affect the following document binders:
Station RERP Implementing Procedures In the Station RERP Implementing Procedures, the general format for procedur'es with worksheets is to file the procedure body under the tab marked with the procedure title, and the worksheets under the tab marked " Attachments," which immediately follows the procedure tab, The attachments are separated from the procedure by a blue sheet to assist in filing.
The following procedures are being transmitted for filing in the station RERP Implementing Procedures.
RERP-HOME, Issue 3 RERP-CR-UE, Issue 16 RERP-VC, Issue 2 If there is confusion as to which issue is most recent whenever' multiple copies are received in a short period of time, the highest issue number is always the most recent issue of a given procedure.
If difficulties or questions arise in filing these procedures, please feel free to contact Mr. J. M. Sills at (303) 785-2224, extension 283 for assistance.
Very truly yours,
$ W WKA e W
Don W. Warembourg y
Q Manager, Nuclear Production DWW/pc
-