Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20071K773 + (11:19:40, 15 December 2024)
- 05000361/LER-1982-060-03, /03L-0:on 820416,while in Mode 5,emergency Air Cleanup Sys Train a Became Inoperable When Emergency Chiller Tripped on Low Flow.Caused by Erratic Flow Control Switch. Switch Replaced & Sys Returned to Operable Status + (11:19:42, 15 December 2024)
- ML20071K763 + (11:19:43, 15 December 2024)
- ML20071K765 + (11:19:43, 15 December 2024)
- ML20071K761 + (11:19:44, 15 December 2024)
- ML20071K758 + (11:19:45, 15 December 2024)
- ML20071K760 + (11:19:45, 15 December 2024)
- 05000361/LER-1982-059-03, /03L-0:on 820407,while in Mode 5,during Check of High Vibration in Train a Emergency Chiller Water Pump, Chiller Found W/Faulty Control Switch.Caused by Switch Out of Calibr.Switch Recalibr + (11:19:47, 15 December 2024)
- ML20071K753 + (11:19:48, 15 December 2024)
- ML20071K744 + (11:19:49, 15 December 2024)
- ML20071K750 + (11:19:49, 15 December 2024)
- ML20071K736 + (11:19:50, 15 December 2024)
- ML20071K735 + (11:19:51, 15 December 2024)
- 05000237/LER-1982-030-01, /01T-0:on 820712,during HPCI Motor Operated Valve Operability Test,Steam Supply Isolation Valve 2301-04 Failed to Close.Caused by Valve Packing Leak.Valve Repacked & Motor Replaced + (11:19:52, 15 December 2024)
- 05000237/LER-1982-030, Forwards LER 82-030/01T-0 + (11:19:53, 15 December 2024)
- ML20071K717 + (11:19:54, 15 December 2024)
- ML20071K724 + (11:19:54, 15 December 2024)
- 05000251/LER-1982-009-03, /03L-0:on 820623,biweekly Testing for Tave & Delta T Protection Channel Was Completed 2 Days After Latest Date Allowable.Caused by Computation Using Completion Date for Previous Test.Channel Test Completed 820625 + (11:19:56, 15 December 2024)
- ML20071K705 + (11:19:57, 15 December 2024)
- ML20071K701 + (11:19:58, 15 December 2024)
- 05000251/LER-1982-009, Forwards LER 82-009/03L-0 + (11:19:59, 15 December 2024)
- ML20071K692 + (11:19:59, 15 December 2024)
- ML20071K689 + (11:20:00, 15 December 2024)
- ML20071K688 + (11:20:01, 15 December 2024)
- 05000348/LER-1982-032-03, /03L-0:on 820701,1A Reactor Coolant Pump Underfrequency Relay 81-2 Failed to Trip During Underfrequency Test.Caused by Faulty Relay.Relay Replaced & Declared Operable + (11:20:02, 15 December 2024)
- ML20071K682 + (11:20:03, 15 December 2024)
- 05000348/LER-1982-032, Forwards LER 82-032/03L-0 + (11:20:04, 15 December 2024)
- ML20071K675 + (11:20:04, 15 December 2024)
- L-83-189, Responds to NRC Re Violations Noted in IE Insp Rept 50-389/83-06.Corrective Actions:Bolting Repts from Inception of Const Completion Group to 830218 Being Reviewed & Civil Const Activity QA Insps Reviewed + (11:20:05, 15 December 2024)
- ML20071K673 + (11:20:05, 15 December 2024)
- 05000328/LER-1982-081-03, /03L-0:on 820625,automatic Control Valve 1-PCV-3-122 Failed to Open on Demand Twice.First Event Caused by Low Oil in Hydraulic Reservoir Due to Leaking Fitting.Second Event Caused by Foreign Matl in Oil + (11:20:07, 15 December 2024)
- 05000269/LER-1982-012-01, /01T-0:on 820623,both Trains of Reactor Bldg Spray Inoperable Due to Train B Pump Out of Svc While Train a Pump Suction Valve Was Shut.Caused by Personnel Error.Train B Pump Racked in Pump Breaker + (11:20:09, 15 December 2024)
- 05000269/LER-1982-012, Forwards LER 82-012/01T-0.Detailed Event Analysis Encl + (11:20:10, 15 December 2024)
- 05000328/LER-1982-081, Forwards LER 82-081/03L-0 + (11:20:10, 15 December 2024)
- ML20071K645 + (11:20:11, 15 December 2024)
- ML20071K649 + (11:20:11, 15 December 2024)
- RC-94-0194, Requests Relief from ASME Section XI Requirements for Class 1,2 & 3 Insulated Pressure Retaining Bolted Connections Which Receive VT-2 Visual Exam During Performance of Sys Pressure Testing + (11:20:12, 15 December 2024)
- 05000336/LER-1982-026-03, /03L-0:on 820623,three Containment Air Radiation Monitors (8123A,8262A & 8262B) Found W/Function Swithces in Incorrect Position.Caused by Techician Error & Procedural Deficiency.Technicians Cautioned & Procedure Revised + (11:20:14, 15 December 2024)
- ML20071K637 + (11:20:15, 15 December 2024)
- ML20071K636 + (11:20:15, 15 December 2024)
- ML20071K630 + (11:20:16, 15 December 2024)
- 05000336/LER-1982-026, Forwards LER 82-026/03L-0 + (11:20:17, 15 December 2024)
- B10536, Advises That Positive Results of Control Element Assembly Guide Tube Insps & Insps at End of Cycles 2 & 3 Demonstrate That Sleeves Are Adequate Resolution to Guide Tube Wear Problem.Further Insp Superfluous + (11:20:17, 15 December 2024)
- 05000352/LER-1994-010, :on 940626,operator Pulled an Incorrect Fuse Which Caused Indicating Lights to Extinguish.Caused by Less than Adequate Attention to Detail.Both RO & Co Were Disciplined to Meet Management Expectation + (11:20:19, 15 December 2024)
- 05000416/LER-1982-005-01, /01T-0:on 820709,while Performing Refueling Interlock Check,Automatic Interlocks Failed to Stop Refueling Platform Approach to Core.Caused by Malfunction of Interlock Relay.Relay Replaced + (11:20:21, 15 December 2024)
- ML20071K617 + (11:20:22, 15 December 2024)
- ML20071K618 + (11:20:22, 15 December 2024)
- ML20071K614 + (11:20:23, 15 December 2024)
- ML20071K615 + (11:20:23, 15 December 2024)
- JPN-94-035, Provides Response to NRC 940520 RAI on NRC Bulletin 90-001, Suppl 1, Loss of Fill-Oil in Rosemount Transmitters, Relative to Enhanced Surveillance Program for Rosemount Transmitters + (11:20:24, 15 December 2024)
- ML20071K612 + (11:20:24, 15 December 2024)
- 05000416/LER-1994-006, :on 940528,identified That Scram Times for Two Control Rods Were Not Acceptable as Defined by Ts.Caused by Defect in Preassembled Top Head Assemblies.Ggns Has Completed Testing & Replacement of Top Head + (11:20:26, 15 December 2024)