ML20071K673

From kanterella
Jump to navigation Jump to search
Advises That RO-269/82-11 Providing Details of 820622 Incident When Unit Declared Inoperable Due to Main Tie Breaker to Overhead Transmission Path Not Closing,Will Be Submitted No Later than 820820
ML20071K673
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 07/22/1982
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8208020168
Download: ML20071K673 (1)


Text

__

Powen Dummixo 422 Sourn Cnuncu STnzzT, CruumTTz, N. C. aca4a WILLI AM O. PAR KitR, JR.

July 22, 1982 s$$5

".*o'o'uc[o 75'5'"

'c: ^" 5' 7C' 373-4083 Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 m

Atlanta, Georgia 30303 h

~

Re: Oconee Nuclear Station

' [

Docket No. 50-269

~ q

Dear Mr. O'Reilly:

[,

theNRCResidentInspectorwasinformedthatKeoweeHyho 7

On June 22, 1982 Unit 1 was declared inoperable due to the main Tie Breaker to the Overh ad Transmission Path (ACB-1) not closing.

Reportable Occurrence Report ko-269/til-il providing details of this incident was to have been submitted to you by July 22, 1982, pursuant to Technical Spec-ification 6.6.2.1.b(2). However, the investigation of this incident and the preparation of a report are incomplete at this time.

It is expected that the investigation and report will be completed, reviewed, and submitted to you no later than August 20, 1982.

Ver truly yours, l

l s

h.

u-l William O. Parker, Jr.

JFK/php cc: Document Control Desk Mr. W. T. Orders U. S. Nuclear Regulatory Commission NRC Resident Inspector Washington, D. C. 20555 Oconee Nuclear Station Records Center Mr. Philip C. Wagner Institute of Nuclear Power Operations Office of Nuclear Reactor Regulation 1820 Water Place U. S. Nuclear Regulatory Commission Atlanta, Georgia 30339 Washington, D. C. 20555 k'icSL COPY 8208020168 820722

-" 6_ g 1

/

PDR ADOCK 05000269 S

PDR

__