Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20072E585 + (10:31:04, 15 December 2024)
- 05000255/LER-1983-039-17, /01T-0:on 830603,hydrogen Recombiners Simultaneously Loaded to Respective MCC for Surveillance Testing,Contrary to Standing Order.Caused by Inadequate Surveilliance Procedure + (10:31:06, 15 December 2024)
- 05000324/LER-1983-048-03, /03L-0:on 830520,surveillance Revealed Primary Containment Atmosphere Oxygen Analyzer 2-CAC-AT-1259-2 Drywell Oxygen Concentration 1% Higher than Redundant Analyzer.Caused by Calibr Drift + (10:31:08, 15 December 2024)
- 05000318/LER-1983-010-03, /03L-0:on 830208,during Surveillance Testing, Auxiliary Feedwater Actuating Sys Channel Zf Setpoint Found Out of Spec.Investigation Found Converter 2-E/I-1023C Out of Calibr,Zero & Span.Cause Unknown.Converter Recalibr + (10:31:10, 15 December 2024)
- ML20072E571 + (10:31:11, 15 December 2024)
- ML20072E570 + (10:31:13, 15 December 2024)
- ML20072E568 + (10:31:14, 15 December 2024)
- ML20072E567 + (10:31:15, 15 December 2024)
- ML20072E566 + (10:31:16, 15 December 2024)
- 05000387/LER-1983-032-03, /03L-0:on 830213,drywell Average Air Temps Exceeded Tech Spec During Startup Test Following 100% Load Reject Test.Caused by Loss of Svc Water Due to Failure to Achieve Auxiliary Electrical Bus Fast Transfer + (10:31:17, 15 December 2024)
- ML20072E562 + (10:31:19, 15 December 2024)
- ML20072E561 + (10:31:20, 15 December 2024)
- ML20072E558 + (10:31:21, 15 December 2024)
- 05000387/LER-1983-032, Forwards LER 83-032/03L-0 + (10:31:22, 15 December 2024)
- ML20072E556 + (10:31:22, 15 December 2024)
- ML20072E553 + (10:31:23, 15 December 2024)
- ML20072E552 + (10:31:24, 15 December 2024)
- ML20072E548 + (10:31:25, 15 December 2024)
- ML20072E547 + (10:31:26, 15 December 2024)
- ML20072E544 + (10:31:27, 15 December 2024)
- ML20072E543 + (10:31:27, 15 December 2024)
- ML20072E542 + (10:31:28, 15 December 2024)
- ML20072E537 + (10:31:28, 15 December 2024)
- AECM-83-0152, Suppls 821029 Response to Violations Noted in IE Insp Rept 50-416/82-65.Corrective Actions:Administrative Procedure 01-S-07-1, Control of Work on Plant Equipment & Facilities Implemented + (10:31:29, 15 December 2024)
- 05000280/LER-1983-024-03, /03L-0:on 830517,RHR Pump B Removed from Svc, Rendering RHR Loops Inoperable.Caused by Pump Cavitation Due to Inaccurate Standpipe Level Indication.Rcs Level Increased.Rhr Pump Vented & Returned to Svc + (10:31:30, 15 December 2024)
- 05000318/LER-1983-010, Forwards LER 83-010/03L-0 + (10:31:31, 15 December 2024)
- 05000387/LER-1983-029-03, /03L-0:on 830215,quarterly Calibr Surveillance SI-83-321 on High Drywell Pressure Channel D,PSH-E11-N010D, Failed at Meet Tech Spec Value.Caused by Setpoint Drift. Instrument Will Be Checked During Next Quarterly Calibr + (10:31:33, 15 December 2024)
- ML20072E530 + (10:31:40, 15 December 2024)
- ML20072E531 + (10:31:40, 15 December 2024)
- ML20072E525 + (10:31:47, 15 December 2024)
- ML20072E513 + (10:31:48, 15 December 2024)
- ML20072E511 + (10:31:55, 15 December 2024)
- ML20072E505 + (10:31:56, 15 December 2024)
- 05000387/LER-1983-029, Forwards LER 83-029/03L-0 + (10:31:59, 15 December 2024)
- ML20072E481 + (10:32:00, 15 December 2024)
- ML20072E466 + (10:32:01, 15 December 2024)
- ST-HL-AE-4863, Monthly Operating Repts for Jul 1994 for South Texas Project Units 1 & 2 + (10:32:02, 15 December 2024)
- ML20072E442 + (10:32:09, 15 December 2024)
- ML20072E434 + (10:32:10, 15 December 2024)
- ML20072E426 + (10:32:11, 15 December 2024)
- ML20072E411 + (10:32:11, 15 December 2024)
- ML20072E404 + (10:32:12, 15 December 2024)
- ML20072E402 + (10:32:12, 15 December 2024)
- ML20072E400 + (10:32:13, 15 December 2024)
- ML20072E399 + (10:32:13, 15 December 2024)
- ML20072E391 + (10:32:14, 15 December 2024)
- ML20072E389 + (10:32:15, 15 December 2024)
- 3F0894-03, Forwards Crystal River Unit 3 Tendon Surveillance Program Engineering Evaluation Rept for Fifth Tendon Surveillance Insp Period + (10:32:16, 15 December 2024)
- ML20072E388 + (10:32:16, 15 December 2024)
- HL-4661, Application for Amends to Licenses DPR-51 & NPF-5,revising Result of Meetings & Includes Page Change Insertion Instructions,Per NUREG-1433 + (10:32:17, 15 December 2024)
- ML20072E386 + (10:32:17, 15 December 2024)