Responds to NRC Re Violation Noted in IE Insp Repts 50-424/82-29 & 50-425/82-29.Corrective Actions: Equipment Program re-evaluated,Procedure GD-T-09 & Desk Instructions Revised & Torn/Loose Coverings Replaced
ML20072E389
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/11/1983
From: Foster D
GEORGIA POWER CO.
To: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20072E368 List:
References
GN-212, NUDOCS 8303210660
Download: ML20072E389 (2)


Text

s .

l 1

Georgia Power Company Post Office Box 4545 Ammu, Gexpa 3EM2 Tew 404 s2s4s2s Vogtle Project February 11, 1983 United States Nuclear Regulatory Commission co . -

Office of Inspection and Enforcement 'd -

Region II - Suite 3100  ??  ;, ir 101 Marietta Street File: X78G10 ao L; C)

V Atlanta, Georgia 30303 Log: GN-212 g3 (2 i N

Reference:

50-424/82-29 2> ['*$

50-425/82-29 u: *d

. ?:

Attention: R. C. Lewis en  ;, m em -

Gentlemen:

The Georgia Power Company wishes to submit the following information concerning the violations discussed in your inspection report 50-424/82-29 and 50-425/82-29.

The requirements for protection of equipment specified in the procedure inadequately defined protection criteria. The equipment was not monitored suffici ntly to take prompt action to resolve discrepancies and make improve-ments ca storage conditions.

The equipment program was re-evaluated, procedure GD-T-09 was revised to include more frequent inspections, and desk instructions were revised to delineate the inspection, protection, and cleanliness criteria. The equipment was promptly cleaned, inspected, and protection provided where required. Torn and loose plastic coverings were replaced. Openings were closed to prevent rodent entry. Areas around the equipment were cle6ned.

The following corrective steps were taken to avoid further violations:

- revised procedure GD-T-09, assigned independent maintenance crews to perform continuous maintenance, assigned engineers for surveillance and evaluation of equipment,

- instituted weekly inspection of equipment for housekeeping and general maintenance, and

- created an awareness in craft personnel to protect, maintain, and keep equipment and areas clean.

Full compliance will be achieved by March 1, 1983.

8303210660 830301 PDR ADOCK 05000424 G PDR

U. S. Nucl::ar R::gulat:ry Commission

- Atlanta, Georgia 30303 February ~11, 1983 5

Page Two This response contains no proprietary information and may be placed in the NRC Public Document Room upon receipt.

Yours truly, N

.0 Foster CWH/DOF/tlp xc:- U. S. Nuclear Regulatory Commission Attn: Victor J. Stello, Jr., Director Office of Inspection and Enforcement Washington, D. C. 20555 R. J. Kelly R. E. Conway G. F. Head J. T. Beckham, Jr.

J. H. Boykin D. E. Dutton R. H. Pinson D. L. McCrary R. A. Thomas J. A. Bailey

0. Batum H. H. Gregory, III E. D. Groover L. T. Gucwa M. Malcom C. R. Miles, Jr.

M. Manry R. W. Staffa J. L. Vota W. F. Sanders 1