Ro:On 830208,14-day Limit for Isolation of Spray/Sprinkler Sys Protecting East Cableway Expired.Sys Isolated to Perform Necessary Mods.Mod Work Continuing.Mod Will Be Completed by mid-Mar 1983
ML20072E513
Person / Time
Site: Hatch 
Issue date: 02/24/1983
From: Nix H
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
GM-83-146, NUDOCS 8303210694
Download: ML20072E513 (2)


Text

-,.

Georgia Power Company

- Post Office Box 439 B3 tty, Georgia 31513

~ Telephone 912 367-7781 912 537-9444 Edwin I. Hatch Nuclear Plant _

Georgia Pbwer February 24, 1983 GM-83-146 PLANT E.

I. HATCH Licensee Event Report Docket No. 50-366 co s

'st:

United States Nuclear Regulatory Commission y

(~,l-f; g3 Office of Inspection and Enforcement W

Region II

.c.

HO Suite 3100 It.m 101 Marietta Street T

c"]

fM Atlanta, Georgia 30303 ki ATTENTION:

Mr. James P. O'Reilly W

b.^

.n.-

5-Pursuant' to section 6.9.2 of Hatch Unit 2

Technical Specifications, please find attached Special Report 50-366/1983-01.

w H.

C.

Nix z General Manager HCN/HLS/hh xc:

R. J. Kelly G. F. Head J. T. Beckham, Jr.

P.-D. Rice K. M. Gillespie S. B. Tipps R. D. Baker Control Room Document Control OVY 8303210694 830224 t

PDR ADOCK 05000366 S

PDR d~ b

~

Narrative for Special Report 50-366/1983-01 On January 25, 1983, with Unit 2 in the RUN node at 1714 MPlt, the spray / sprinkler system providing protection for the Unit 2 East Cableway was isolated in order to

- perform nodifications to the system. A continuous fire watch and a 14 day Iro were established per Technical Specifications section 3.7.6.2, ICTION a.

Technical Specifications section 3.7.6.2 IcrION a.,

further requires restoration of the system to operable status within 14 days or subnit a Special Report to the NBC pursuant to Technical Specification section 6.9.2.

W e spray / sprinkler systen was still out of service on February 8,1983, thus this Special Report is required.

%e spray / sprinkler system is being nodified to provide protection for an area of the Unit'2 East Cableway that was previously protected by an extension of the Unit 1 spray / sprinkler system. We nodification is expected to be conplete by the mid-die of March.