Text
.
l Northem States Power Company l
414 Nic liet Mall i
Minneapolis, Minnesota 5540t 1927 Telephone (012) 330 5500 i
l August 8, 1994 Monticello Technical Specificatione Section 6.7.A.3 US Nuclear Regulatory Commission Attna Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Honthly Operating Report July, 1994 i
Attached is the Monthly Operating Report for July, 1994 for the Monticello Nuclear Generating Plant.
l 5
l q_>
ty t.--
n Roger o Anderson Director Licensing and Hanagement Issues c
Director, Office of Resource Management Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector State of Minnesota - Kris Sanda Attachment CGj 9408220247 940731 i
PDR ADOCK 05000263
)
R PDR y-
,.r
-,v w
n
OPERATING DATA REPORT l
DOCKET NO.
50-263 DATE 8-1-94 COMPLETED BY H. H.
Paustian TELEPHONE 612/295-5151 i
4 OPERATING STATUS
] Notes
]
o Monticello
}
}
- 1. Unit Name 2.
Reporting eriod:
July
]
]
- 3. Licensed T ermal Power (MWt):
1670
]
]
- 4. Nameplate Rating (Gross MWe) :
569
]
]
5.
Design Electrical Rating (Net MWe):
545.4
}
}
- 6. Maximum Dependable Capacity (Gross MWe) :
564
]
]
-~
- 7. Maximum Dependable Capacity (Net MWe) :
536
]
]
8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any: __N/A THIS MONTH YR.-TO-DATE CUMULATIVE
- 11. Hours In Reporting Period 744 5087 202368
- 12. Number Of Hours Reactor Was Critical 744.0 4925.2 164300.9
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
- 14. Hours Generator On-Line 744.0 4892.3 161493.0
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1226107 8123762 249388542
- 17. Gross Electrical Energy Generated (MWH) 408992 2742906 84297569
- 18. Net Electrical Energy Generated (MWH) 388863 2633129 80651922
- 19. Unit Service Factor 100.0%
96.2%
79.8%
- 20. Unit Availability Factor 100.0%
96.2%
79.8%
al. Unit Capacity Factor (Using MDC Net) 97.5%
96.6%
74.4%
- 22. Unit Capacity Factor (Using DER Net) 95.8%
94.9%
73.1%
- 23. Unit Forced Outage Rate 0.0%
3.8%
3.6%
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
- Refueling Outage - 9/15/94 - 39 days
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A
- 26. Units In Test Status (Prior to Commercial Operation) : N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION i
e q
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-263 UNIT Monticello-DATE 8-1-94 COMPLETED BY H. H. Paustian TELEPHONE 612/295-5151 MONTH OF July DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 532.
17 516.
2 530.
18
- 529, 3
531.
19 526.
4
- 535, 20 524.
5 530.
21
_521.
6
- 530, 22
- 518, 7
530.
23
- 518, 8
- 531, 24
- 513, 9
532.
25
- 513, 10 531.
26
- 512, 11 529.
27
- 510, 12
- 529, 28 508.
13 528.
29 504.
14 532.
'30 504.
15 528.
31 499.
16 530.
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for~each day in the reporting month.
Compute to the nearest whole megawatt.
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-263 DATE 8-1-94 COMPLETED BY H. H. Paustian TELEPHONE 612/295-5151 MONTH JUL_
07-01-94 to Power operation (End-of-cycle coastdown began 7/18/94.)
07-31-94 Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.
UNIT SHUIDCLES AND PCLTR REDUCTIONS DOCKET NO.
50-263 UNIT NAME l onticello DATE 8-01-94 COMPLETED BY 7. H. Paustlan-'
REPORT MONIH July TELEPHONE 2612/295-5151 i
Duration Reason Method LER System Comp.
Cause & Corrective No.
Date Ty(pe (hours)
(2) of No.
Code Code Action to 1)
Shutdown (4)
(5)
Prevent Recurrence (3)
None i
L 1
2 3
4 F: Forced Reason:
Method:
Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(PS05-D5)
B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram 5
D-Regulator Restriction 4-Other (Explain)
IEEE Standard 803A-1983 E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) r